Search icon

SUPREME SHEETROCKING & SPACKLING INC.

Company Details

Name: SUPREME SHEETROCKING & SPACKLING INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 28 Jun 2018 (7 years ago)
Entity Number: 5367444
ZIP code: 11967
County: Suffolk
Place of Formation: New York
Address: 57 MERRICK ROAD, SHIRLEY, NY, United States, 11967

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
LISA STAWNICZY DOS Process Agent 57 MERRICK ROAD, SHIRLEY, NY, United States, 11967

Filings

Filing Number Date Filed Type Effective Date
180628010256 2018-06-28 CERTIFICATE OF INCORPORATION 2018-06-28

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
344787627 0214700 2020-06-12 136 UPPER SEVEN PONDS RD., WATER MILL, NY, 11976
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2020-06-12
Emphasis L: FALL
Case Closed 2022-09-26

Related Activity

Type Referral
Activity Nr 1600943
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2020-09-17
Abatement Due Date 2020-09-23
Current Penalty 4048.0
Initial Penalty 4048.0
Final Order 2020-10-16
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Worksite, 136 Upper Seven Ponds Rd., Water Mill, NY: Employee was working at the top level of a scaffold while spackling a cathedral ceiling in a residence. The top level had only one plank; on or about 6/3/20. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01002A
Citaton Type Serious
Standard Cited 19260451 F07
Issuance Date 2020-09-17
Abatement Due Date 2020-09-23
Current Penalty 4048.0
Initial Penalty 4048.0
Final Order 2020-10-16
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person. a) Worksite, 136 Upper Seven Ponds Rd., Water Mill, NY: Employee was working at the 13' level of a scaffold while spackling a cathedral ceiling in a residence. The top level of the scaffold had one plank and no guardrails installed. The scaffold was not erected under the direction of a competent person qualified in scaffold erection; on or about 6/3/20. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01002B
Citaton Type Serious
Standard Cited 19260454 B02
Issuance Date 2020-09-17
Abatement Due Date 2020-09-23
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2020-10-16
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(b)(2): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the correct procedures for erecting, disassembling, moving, operating, repairing, inspecting, and maintaining the type of scaffold in question a) Worksite, 136 Upper Seven Ponds Rd., Water Mill, NY: Employee was working at the top, 13' level of a scaffold while spackling a cathedral ceiling in a residence. The top level had only one plank and there were no guardrails; on or about 6/3/20. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2020-09-17
Abatement Due Date 2020-09-23
Current Penalty 4048.0
Initial Penalty 4048.0
Final Order 2020-10-16
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) Worksite, 136 Upper Seven Ponds Rd., Water Mill, NY: Employee was working at the 13' level of a scaffold while spackling a cathedral ceiling in a residence. The employee was not protected from falls by use of guardrails or personal fall arrest systems; on or about 6/3/20. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.

Date of last update: 23 Mar 2025

Sources: New York Secretary of State