Name: | PUTNAM COUNTY WALL SYSTEMS INC |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 13 Jul 2018 (7 years ago) |
Entity Number: | 5375185 |
ZIP code: | 10566 |
County: | Putnam |
Place of Formation: | New York |
Address: | 1 MCFADEN RD, APT 1, PEEKSKILL, NY, United States, 10566 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 1 MCFADEN RD, APT 1, PEEKSKILL, NY, United States, 10566 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
180713010214 | 2018-07-13 | CERTIFICATE OF INCORPORATION | 2018-07-13 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345996664 | 0213100 | 2022-06-03 | 100 BROADWAY, MENANDS, NY, 12204 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Repeat |
Standard Cited | 19260451 B01 |
Issuance Date | 2022-11-28 |
Abatement Due Date | 2022-12-06 |
Current Penalty | 8701.0 |
Initial Penalty | 8701.0 |
Final Order | 2022-12-23 |
Nr Instances | 2 |
Nr Exposed | 3 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1):Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) (a) Front of building, during EIFS work: On or prior to 6/3/22, employees were working from the first level of a tubular welded frame scaffold system approximately 6 feet above a lower level; work platforms were not fully planked. b) Front of building, during EIFS work: On or prior to 6/3/22, employees were working from the second level of a tubular welded frame scaffold system approximately 13 feet above a lower level; work platforms were not fully planked. Putnam County Wall Systems was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.451(b)(1), which was contained in OSHA inspection number 1415120, citation number 1, item number 1 and was affirmed as a final order on 10/23/19, with respect to a workplace located at 255 Hoppers Lane, Paramus, NJ 07652. |
Citation ID | 01002 |
Citaton Type | Repeat |
Standard Cited | 19260451 G01 |
Issuance Date | 2022-11-28 |
Abatement Due Date | 2022-12-06 |
Current Penalty | 6216.0 |
Initial Penalty | 6216.0 |
Final Order | 2022-12-23 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1):Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level. (a) Front of building, during EIFS work: On or prior to 6/3/22, employees were not provided with fall protection while working from the second level of a tubular welded frame scaffold system (12-13 feet above a lower level). Putnam County Wall Systems was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.451(g)(1), which was contained in OSHA inspection number 1415120, citation number 1, item number 2 and was affirmed as a final order on 10/23/19, with respect to a workplace located at 255 Hoppers Lane, Paramus, NJ 07652. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19260404 B01 I |
Issuance Date | 2022-11-28 |
Abatement Due Date | 2022-12-08 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2022-12-23 |
Nr Instances | 1 |
Nr Exposed | 3 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(b)(1)(i):Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. (a) Front of building, during EIFS work: On or about 6/3/22, extension cord(s) used to power a mixer drill were not protected by ground fault circuit interrupter(s), exposing employees to a shock hazard. |
Date of last update: 23 Mar 2025
Sources: New York Secretary of State