Name: | HUEN ELECTRIC, INC. |
Jurisdiction: | New York |
Legal type: | FOREIGN BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 18 Jul 2018 (7 years ago) |
Entity Number: | 5377490 |
ZIP code: | 12207 |
County: | Onondaga |
Place of Formation: | Delaware |
Address: | 80 STATE STREET, ALBANY, NY, United States, 12207 |
Principal Address: | 1801 WEST 16TH ST., BROADVIEW, IL, United States, 60155 |
Name | Role | Address |
---|---|---|
C/O CORPORATION SERVICE COMPANY | DOS Process Agent | 80 STATE STREET, ALBANY, NY, United States, 12207 |
Name | Role | Address |
---|---|---|
CORPORATION SERVICE COMPANY | Agent | 80 STATE STreet, ALBANY, NY, 12207 |
Name | Role | Address |
---|---|---|
RICHARD S. SWARTZ JR. | Chief Executive Officer | 12150 E 112TH AVE., HENDERSON, CO, United States, 80640 |
Start date | End date | Type | Value |
---|---|---|---|
2024-07-10 | 2024-07-10 | Address | 12150 E 112TH AVE., HENDERSON, CO, 80640, USA (Type of address: Chief Executive Officer) |
2024-07-10 | 2024-07-10 | Address | 1801 WEST 16TH ST., BROADVIEW, IL, 60155, USA (Type of address: Chief Executive Officer) |
2022-10-14 | 2024-07-10 | Address | 1801 WEST 16TH ST., BROADVIEW, IL, 60155, USA (Type of address: Chief Executive Officer) |
2022-10-14 | 2024-07-10 | Address | 80 STATE STREET, ALBANY, NY, 12207, 2543, USA (Type of address: Service of Process) |
2022-10-14 | 2022-10-14 | Address | 1801 WEST 16TH ST., BROADVIEW, IL, 60155, USA (Type of address: Chief Executive Officer) |
2022-10-14 | 2024-07-10 | Address | 80 STATE STreet, ALBANY, NY, 12207, 2543, USA (Type of address: Registered Agent) |
2020-07-01 | 2022-10-14 | Address | 1801 WEST 16TH ST., BROADVIEW, IL, 60155, USA (Type of address: Chief Executive Officer) |
2018-07-18 | 2022-10-14 | Address | 111 EIGHTH AVENUE, NEW YORK, NY, 10011, USA (Type of address: Service of Process) |
2018-07-18 | 2022-10-14 | Address | 111 EIGHTH AVENUE, NEW YORK, NY, 10011, USA (Type of address: Registered Agent) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
240710004444 | 2024-07-10 | BIENNIAL STATEMENT | 2024-07-10 |
221014000066 | 2022-10-13 | CERTIFICATE OF CHANGE BY ENTITY | 2022-10-13 |
220706002018 | 2022-07-06 | BIENNIAL STATEMENT | 2022-07-01 |
200701060653 | 2020-07-01 | BIENNIAL STATEMENT | 2020-07-01 |
180718000200 | 2018-07-18 | APPLICATION OF AUTHORITY | 2018-07-18 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
340205145 | 0215800 | 2015-01-14 | 334 COUNTY ROUTE 16, CANTON, NY, 13617 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260403 B02 |
Issuance Date | 2015-02-27 |
Abatement Due Date | 2015-03-09 |
Current Penalty | 0.0 |
Initial Penalty | 3500.0 |
Final Order | 2015-03-13 |
Nr Instances | 1 |
Nr Exposed | 9 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.403(b)(2): 29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: a) At the jobsite, on or about 1/14/15: Employees were connecting energized extension cords to aerial lifts (one connection to each of 2 lifts), where those cords were were powered through an office style power strip not designed for construction use, then to a non GFI protected outlet. Abatement certification must be submitted for this item. |
Citation ID | 01001B |
Citaton Type | Other |
Standard Cited | 19260404 B01 II |
Issuance Date | 2015-02-27 |
Abatement Due Date | 2015-03-09 |
Current Penalty | 3500.0 |
Initial Penalty | 0.0 |
Final Order | 2015-03-13 |
Nr Instances | 1 |
Nr Exposed | 9 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupers for personal protection: a) At the jobsite, on or about 1/14/15: Employees were connecting energized extension cords to aerial lifts (one connection each), where those cords were powered through a connection to an office type power strip, that was sequentially connected to an outlet without GFI protection. Abatement certification must be submitted for this item. |
Citation ID | 01001C |
Citaton Type | Serious |
Standard Cited | 19260405 A02 II I |
Issuance Date | 2015-02-27 |
Abatement Due Date | 2015-03-09 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2015-03-13 |
Nr Instances | 1 |
Nr Exposed | 9 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage: a) At the jobsite, on or about 1/14/15: Employees were connecting energized extension cords to aerial lifts (one connection to each of 2 lifts), where those cords were passed over and through a snow covered walkway (exposed to foot and vehicle traffic), then passed under an overhead doorway that was closed on the cords. The cords were powered through an office style power strip and to a non GFI protected outlet. Abatement certification must be submitted for this item. |
Date of last update: 23 Mar 2025
Sources: New York Secretary of State