B022025063B15
|
2025-03-04
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025063B14
|
2025-03-04
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025063B16
|
2025-03-04
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025063B13
|
2025-03-04
|
2025-06-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025063B12
|
2025-03-04
|
2025-06-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025063B11
|
2025-03-04
|
2025-06-01
|
PLACE MATERIAL ON STREET
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025063B10
|
2025-03-04
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025063B09
|
2025-03-04
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025063B17
|
2025-03-04
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025063B08
|
2025-03-04
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025063B07
|
2025-03-04
|
2025-06-01
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025063B06
|
2025-03-04
|
2025-06-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025063B05
|
2025-03-04
|
2025-06-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025063B04
|
2025-03-04
|
2025-06-01
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025062B86
|
2025-03-03
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022025062B85
|
2025-03-03
|
2025-06-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022025062B84
|
2025-03-03
|
2025-06-01
|
PLACE MATERIAL ON STREET
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022025062B82
|
2025-03-03
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022025062B81
|
2025-03-03
|
2025-06-01
|
PLACE MATERIAL ON STREET
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022025062B80
|
2025-03-03
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025062B79
|
2025-03-03
|
2025-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025062B78
|
2025-03-03
|
2025-06-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025062B77
|
2025-03-03
|
2025-06-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025062B76
|
2025-03-03
|
2025-06-01
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B012025058B32
|
2025-02-27
|
2025-03-03
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
B022025051B69
|
2025-02-20
|
2025-03-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025051B74
|
2025-02-20
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025051B73
|
2025-02-20
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025051B72
|
2025-02-20
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025051B71
|
2025-02-20
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025051B70
|
2025-02-20
|
2025-03-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025051B68
|
2025-02-20
|
2025-03-03
|
PLACE MATERIAL ON STREET
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B042025036A27
|
2025-02-05
|
2025-03-03
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET
|
B042025036A28
|
2025-02-05
|
2025-03-03
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET
|
B042025036A26
|
2025-02-05
|
2025-03-03
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET
|
B022025030B36
|
2025-01-30
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022025030B35
|
2025-01-30
|
2025-03-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022025030B34
|
2025-01-30
|
2025-03-03
|
PLACE MATERIAL ON STREET
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022025030B33
|
2025-01-30
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025030B32
|
2025-01-30
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025030B31
|
2025-01-30
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025030B30
|
2025-01-30
|
2025-03-03
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025030B29
|
2025-01-30
|
2025-03-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025030B28
|
2025-01-30
|
2025-03-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025030B27
|
2025-01-30
|
2025-03-03
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025030B26
|
2025-01-30
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025030B25
|
2025-01-30
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025030B24
|
2025-01-30
|
2025-03-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025030B23
|
2025-01-30
|
2025-03-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025030B22
|
2025-01-30
|
2025-03-03
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022025030B21
|
2025-01-30
|
2025-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022025030B20
|
2025-01-30
|
2025-03-03
|
PLACE MATERIAL ON STREET
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022025030A69
|
2025-01-30
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025030A68
|
2025-01-30
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025030A67
|
2025-01-30
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025030A66
|
2025-01-30
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025030A65
|
2025-01-30
|
2025-01-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025030A64
|
2025-01-30
|
2025-01-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022025030A63
|
2025-01-30
|
2025-01-31
|
PLACE MATERIAL ON STREET
|
63 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B012025014A92
|
2025-01-14
|
2025-01-31
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B012025014A91
|
2025-01-14
|
2025-01-31
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B042025014A16
|
2025-01-14
|
2025-01-31
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022025014A30
|
2025-01-14
|
2025-01-31
|
TEMPORARY PEDESTRIAN WALK
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B012025010B08
|
2025-01-10
|
2025-01-31
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MC GUINNESS BOULEVARD
|
B012025010B06
|
2025-01-10
|
2025-01-31
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET GREENPOINT AVENUE
|
B012025010B07
|
2025-01-10
|
2025-01-31
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET MC GUINNESS BOULEVARD
|
B042025010A11
|
2025-01-10
|
2025-01-31
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET
|
B042025010A10
|
2025-01-10
|
2025-01-31
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET
|
B042025010A09
|
2025-01-10
|
2025-01-31
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GRAND STREET, BROOKLYN, FROM STREET LORIMER STREET
|
B012025003C29
|
2025-01-03
|
2025-01-31
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
B042025003A15
|
2025-01-03
|
2025-01-30
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
B042025003A12
|
2025-01-03
|
2025-01-31
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MC GUINNESS BOULEVARD
|
B042025003A11
|
2025-01-03
|
2025-01-31
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MC GUINNESS BOULEVARD
|
B042025003A10
|
2025-01-03
|
2025-01-31
|
PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET MC GUINNESS BOULEVARD
|
B012025003C30
|
2025-01-03
|
2025-01-31
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
PENNSYLVANIA AVENUE, BROOKLYN, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
B022025002B41
|
2025-01-02
|
2025-01-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022025002B40
|
2025-01-02
|
2025-01-31
|
PLACE MATERIAL ON STREET
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022025002B42
|
2025-01-02
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
59 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022024366A26
|
2024-12-31
|
2025-01-29
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024366E88
|
2024-12-31
|
2025-01-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024366E87
|
2024-12-31
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024366E86
|
2024-12-31
|
2025-01-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024366E85
|
2024-12-31
|
2025-01-31
|
PLACE MATERIAL ON STREET
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024366A31
|
2024-12-31
|
2025-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024366A30
|
2024-12-31
|
2025-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024366A29
|
2024-12-31
|
2025-01-29
|
TEMP. CONST. SIGNS/MARKINGS
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024366A28
|
2024-12-31
|
2025-01-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024366A27
|
2024-12-31
|
2025-01-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024366A25
|
2024-12-31
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024366A24
|
2024-12-31
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024366A23
|
2024-12-31
|
2025-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024366A22
|
2024-12-31
|
2025-01-31
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024366A21
|
2024-12-31
|
2025-01-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024366A20
|
2024-12-31
|
2025-01-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024366A19
|
2024-12-31
|
2025-01-31
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B012024366B52
|
2024-12-31
|
2025-01-28
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
TOMPKINS AVENUE, BROOKLYN, FROM STREET DECATUR STREET TO STREET MAC DONOUGH STREET
|
M042024355A00
|
2024-12-20
|
2025-01-17
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE
|
M022024355B32
|
2024-12-20
|
2025-01-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE
|
M022024355B31
|
2024-12-20
|
2025-01-17
|
TEMPORARY PEDESTRIAN WALK
|
WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE
|
M012024355A18
|
2024-12-20
|
2025-01-17
|
RESET, REPAIR OR REPLACE CURB
|
WEST 182 STREET, MANHATTAN, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE
|
B002024347A02
|
2024-12-12
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
X022024346A63
|
2024-12-11
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
ANTHONY AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET
|
X042024346A08
|
2024-12-11
|
2025-01-11
|
REPLACE SIDEWALK
|
ANTHONY AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET
|
X012024346A86
|
2024-12-11
|
2024-12-31
|
RESET, REPAIR OR REPLACE CURB
|
ANTHONY AVENUE, BRONX, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET
|
B042024343A01
|
2024-12-08
|
2025-01-07
|
REPLACE SIDEWALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET JEFFERSON AVENUE TO STREET PUTNAM AVENUE
|
B022024343A07
|
2024-12-08
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
BEDFORD AVENUE, BROOKLYN, FROM STREET JEFFERSON AVENUE TO STREET PUTNAM AVENUE
|
B022024343A06
|
2024-12-08
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET JEFFERSON AVENUE TO STREET PUTNAM AVENUE
|
B012024343A06
|
2024-12-08
|
2024-12-31
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
BEDFORD AVENUE, BROOKLYN, FROM STREET JEFFERSON AVENUE TO STREET PUTNAM AVENUE
|
B022024332D66
|
2024-11-27
|
2024-12-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
TOMPKINS AVENUE, BROOKLYN, FROM STREET DECATUR STREET TO STREET MAC DONOUGH STREET
|
B042024332A55
|
2024-11-27
|
2024-12-26
|
REPLACE SIDEWALK
|
TOMPKINS AVENUE, BROOKLYN, FROM STREET DECATUR STREET TO STREET MAC DONOUGH STREET
|
B012024332B93
|
2024-11-27
|
2024-12-26
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
TOMPKINS AVENUE, BROOKLYN, FROM STREET DECATUR STREET TO STREET MAC DONOUGH STREET
|
B042024313A07
|
2024-11-08
|
2024-12-06
|
REPAIR SIDEWALK
|
SULLIVAN PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
B042024313A06
|
2024-11-08
|
2024-11-14
|
REPAIR SIDEWALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE
|
B002024312A27
|
2024-11-07
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
B042024312A03
|
2024-11-07
|
2024-12-03
|
REPAIR SIDEWALK
|
FOSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET EAST 5 STREET
|
B042024309A11
|
2024-11-04
|
2024-12-03
|
REPAIR SIDEWALK
|
FOSTER AVENUE, BROOKLYN, FROM STREET EAST 3 STREET TO STREET EAST 5 STREET
|
B022024305A57
|
2024-10-31
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024305A70
|
2024-10-31
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024305A69
|
2024-10-31
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024305A68
|
2024-10-31
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024305A67
|
2024-10-31
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024305A60
|
2024-10-31
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024305A59
|
2024-10-31
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024305A58
|
2024-10-31
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024305A56
|
2024-10-31
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024305A55
|
2024-10-31
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024305A54
|
2024-10-31
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024305A43
|
2024-10-31
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024305A42
|
2024-10-31
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024305A41
|
2024-10-31
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024305A40
|
2024-10-31
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024305A39
|
2024-10-31
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024305A38
|
2024-10-31
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B012024302B04
|
2024-10-28
|
2024-11-08
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
B012024302B03
|
2024-10-28
|
2024-11-12
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
EAST 55 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD
|
B042024302A03
|
2024-10-28
|
2024-11-08
|
CONSTRUCT NEW SIDEWALK
|
MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
B022024290A31
|
2024-10-16
|
2024-11-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET GREENPOINT AVENUE
|
B012024290A78
|
2024-10-16
|
2024-11-26
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET GREENPOINT AVENUE
|
B022024290A30
|
2024-10-16
|
2024-11-26
|
TEMPORARY PEDESTRIAN WALK
|
MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET GREENPOINT AVENUE
|
B042024290A93
|
2024-10-16
|
2024-11-26
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET GREENPOINT AVENUE
|
B022024290A32
|
2024-10-16
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC GUINNESS BOULEVARD, BROOKLYN, FROM STREET CALYER STREET TO STREET GREENPOINT AVENUE
|
B022024283B59
|
2024-10-09
|
2024-11-07
|
TEMPORARY PEDESTRIAN WALK
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET MC GUINNESS BOULEVARD
|
B042024283A97
|
2024-10-09
|
2024-11-07
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET MC GUINNESS BOULEVARD
|
B042024283A96
|
2024-10-09
|
2024-11-08
|
REPAIR SIDEWALK
|
53 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE
|
B042024283A95
|
2024-10-09
|
2024-11-08
|
REPAIR SIDEWALK
|
19 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET
|
B022024283B60
|
2024-10-09
|
2024-11-07
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET MC GUINNESS BOULEVARD
|
B022024283B58
|
2024-10-09
|
2024-11-08
|
TEMPORARY PEDESTRIAN WALK
|
19 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET
|
B022024283B57
|
2024-10-09
|
2024-11-08
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
19 AVENUE, BROOKLYN, FROM STREET 52 STREET TO STREET 53 STREET
|
B022024283B56
|
2024-10-09
|
2024-11-08
|
TEMPORARY PEDESTRIAN WALK
|
53 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE
|
B022024283B55
|
2024-10-09
|
2024-11-08
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
53 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE
|
B012024283C83
|
2024-10-09
|
2024-11-07
|
RESET, REPAIR OR REPLACE CURB
|
GREENPOINT AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET MC GUINNESS BOULEVARD
|
X012024282A35
|
2024-10-08
|
2024-10-29
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
WEST 174 STREET, BRONX, FROM STREET GRAND AVENUE TO STREET MACOMBS ROAD
|
X012024281A71
|
2024-10-07
|
2024-11-06
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
HUNTS POINT AVENUE, BRONX, FROM STREET GILBERT PLACE TO STREET SENECA AVENUE
|
B012024281D56
|
2024-10-07
|
2024-11-05
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
B042024271A03
|
2024-09-27
|
2024-10-25
|
REPAIR SIDEWALK
|
SULLIVAN PLACE, BROOKLYN, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
B042024271A04
|
2024-09-27
|
2024-10-25
|
REPAIR SIDEWALK
|
NOSTRAND AVENUE, BROOKLYN, FROM STREET MONTGOMERY STREET TO STREET SULLIVAN PLACE
|
B012024261D76
|
2024-09-17
|
2024-10-15
|
RESET, REPAIR OR REPLACE CURB
|
BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
B042024261A17
|
2024-09-17
|
2024-10-15
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
B022024261D97
|
2024-09-17
|
2024-10-16
|
TEMPORARY PEDESTRIAN WALK
|
EAST 55 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD
|
B022024261D98
|
2024-09-17
|
2024-10-16
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 55 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD
|
B022024261D96
|
2024-09-17
|
2024-10-15
|
TEMPORARY PEDESTRIAN WALK
|
BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
B012024261D96
|
2024-09-17
|
2024-10-16
|
RESET, REPAIR OR REPLACE CURB
|
EAST 55 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD
|
B012024261D78
|
2024-09-17
|
2024-10-15
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
BEDFORD AVENUE, BROOKLYN, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
B042024261A18
|
2024-09-17
|
2024-10-16
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST 55 STREET, BROOKLYN, FROM STREET FOSTER AVENUE TO STREET GLENWOOD ROAD
|
B012024253B61
|
2024-09-09
|
2024-10-08
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
WALLABOUT STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
B012024253A58
|
2024-09-09
|
2024-10-15
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE
|
B012024253A57
|
2024-09-09
|
2024-10-15
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
DRIGGS AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET GRAHAM AVENUE
|
B012024253A59
|
2024-09-09
|
2024-10-15
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
DRIGGS AVENUE, BROOKLYN, FROM STREET ECKFORD STREET
|
X042024249A15
|
2024-09-05
|
2024-10-04
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
X012024249A79
|
2024-09-05
|
2024-10-04
|
RESET, REPAIR OR REPLACE CURB
|
MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
X012024249A80
|
2024-09-05
|
2024-10-17
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
X022024249C07
|
2024-09-05
|
2024-10-04
|
TEMPORARY PEDESTRIAN WALK
|
MORRIS AVENUE, BRONX, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
B012024248B06
|
2024-09-04
|
2024-10-02
|
RESET, REPAIR OR REPLACE CURB
|
WALLABOUT STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
B022024248B14
|
2024-09-04
|
2024-10-02
|
TEMPORARY PEDESTRIAN WALK
|
WALLABOUT STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
B022024248B15
|
2024-09-04
|
2024-10-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WALLABOUT STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
B042024248A61
|
2024-09-04
|
2024-10-02
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
WALLABOUT STREET, BROOKLYN, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
B012024234B88
|
2024-08-21
|
2024-09-17
|
RESET, REPAIR OR REPLACE CURB
|
DRIGGS AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET GRAHAM AVENUE
|
B022024234C17
|
2024-08-21
|
2024-09-17
|
TEMPORARY PEDESTRIAN WALK
|
ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE
|
B042024234A42
|
2024-08-21
|
2024-09-17
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
DRIGGS AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET GRAHAM AVENUE
|
B022024234C16
|
2024-08-21
|
2024-11-16
|
TEMPORARY PEDESTRIAN WALK
|
DRIGGS AVENUE, BROOKLYN, FROM STREET ECKFORD STREET TO STREET GRAHAM AVENUE
|
B022024234C18
|
2024-08-21
|
2024-09-17
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE
|
B042024234A43
|
2024-08-21
|
2024-09-17
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE
|
B012024234B89
|
2024-08-21
|
2024-09-17
|
RESET, REPAIR OR REPLACE CURB
|
ECKFORD STREET, BROOKLYN, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE
|
B042024234A44
|
2024-08-21
|
2024-09-18
|
REPAIR SIDEWALK
|
MARTENSE STREET, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
B042024232A19
|
2024-08-19
|
2024-09-13
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B012024232A89
|
2024-08-19
|
2024-09-13
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B012024232A90
|
2024-08-19
|
2024-09-13
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
51 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B042024227A10
|
2024-08-14
|
2024-09-10
|
REPAIR SIDEWALK
|
BERRY STREET, BROOKLYN, FROM STREET SOUTH 6 STREET TO STREET WILLIAMSBURG BRIDGE
|
B022024218B62
|
2024-08-05
|
2024-11-07
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024218B61
|
2024-08-05
|
2024-11-07
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024218A32
|
2024-08-05
|
2024-11-02
|
PLACE MATERIAL ON STREET
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024218B63
|
2024-08-05
|
2024-11-07
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024218B64
|
2024-08-05
|
2024-11-07
|
TEMP. CONST. SIGNS/MARKINGS
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024218B65
|
2024-08-05
|
2024-11-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024218B66
|
2024-08-05
|
2024-11-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024218B67
|
2024-08-05
|
2024-11-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024214B27
|
2024-08-01
|
2024-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024214B25
|
2024-08-01
|
2024-11-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024214B24
|
2024-08-01
|
2024-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024214B18
|
2024-08-01
|
2024-11-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024214B19
|
2024-08-01
|
2024-11-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024214B20
|
2024-08-01
|
2024-11-01
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024214B17
|
2024-08-01
|
2024-11-01
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024214B21
|
2024-08-01
|
2024-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024214B22
|
2024-08-01
|
2024-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024214B23
|
2024-08-01
|
2024-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024214B26
|
2024-08-01
|
2024-11-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
X042024204A01
|
2024-07-22
|
2024-08-20
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
HUNTS POINT AVENUE, BRONX, FROM STREET GILBERT PLACE TO STREET SENECA AVENUE
|
X022024204A31
|
2024-07-22
|
2024-08-20
|
TEMPORARY PEDESTRIAN WALK
|
HUNTS POINT AVENUE, BRONX, FROM STREET GILBERT PLACE TO STREET SENECA AVENUE
|
X012024204A41
|
2024-07-22
|
2024-08-20
|
RESET, REPAIR OR REPLACE CURB
|
HUNTS POINT AVENUE, BRONX, FROM STREET GILBERT PLACE TO STREET SENECA AVENUE
|
B042024185A05
|
2024-07-03
|
2024-07-17
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
FARRAGUT ROAD, BROOKLYN, FROM STREET FLATBUSH AVENUE TO STREET KENILWORTH PLACE
|
B012024185A78
|
2024-07-03
|
2024-07-17
|
PAVE STREET-W/ ENGINEERING & INSP FEE-P
|
FARRAGUT ROAD, BROOKLYN, FROM STREET FLATBUSH AVENUE TO STREET KENILWORTH PLACE
|
B012024185A77
|
2024-07-03
|
2024-07-17
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
FARRAGUT ROAD, BROOKLYN, FROM STREET FLATBUSH AVENUE TO STREET KENILWORTH PLACE
|
B022024185A79
|
2024-07-03
|
2024-07-17
|
TEMPORARY PEDESTRIAN WALK
|
FARRAGUT ROAD, BROOKLYN, FROM STREET FLATBUSH AVENUE TO STREET KENILWORTH PLACE
|
B022024128A67
|
2024-05-07
|
2024-08-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024128A65
|
2024-05-07
|
2024-08-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024128A66
|
2024-05-07
|
2024-08-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022024127B85
|
2024-05-06
|
2024-08-11
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024127B84
|
2024-05-06
|
2024-08-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024127B83
|
2024-05-06
|
2024-08-11
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024127B73
|
2024-05-06
|
2024-08-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024127B72
|
2024-05-06
|
2024-08-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024127B71
|
2024-05-06
|
2024-08-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024127B70
|
2024-05-06
|
2024-08-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024127B69
|
2024-05-06
|
2024-08-03
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024127B68
|
2024-05-06
|
2024-08-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024127B67
|
2024-05-06
|
2024-08-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024127B66
|
2024-05-06
|
2024-08-03
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024127B89
|
2024-05-06
|
2024-08-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024127B88
|
2024-05-06
|
2024-08-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024127B87
|
2024-05-06
|
2024-08-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024127B86
|
2024-05-06
|
2024-08-11
|
TEMP. CONST. SIGNS/MARKINGS
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
X042024052A10
|
2024-02-21
|
2024-03-21
|
REPLACE SIDEWALK
|
GRAND AVENUE, BRONX, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET
|
X012024052A52
|
2024-02-21
|
2024-03-21
|
RESET, REPAIR OR REPLACE CURB
|
GRAND AVENUE, BRONX, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET
|
B012024047B40
|
2024-02-16
|
2024-03-15
|
RESET, REPAIR OR REPLACE CURB
|
MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET
|
B042024047A02
|
2024-02-16
|
2024-03-15
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
MIDDLETON STREET, BROOKLYN, FROM STREET LEE AVENUE TO STREET WALLABOUT STREET
|
B022024045B33
|
2024-02-14
|
2024-05-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024045B32
|
2024-02-14
|
2024-05-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024045B31
|
2024-02-14
|
2024-05-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024045B30
|
2024-02-14
|
2024-05-13
|
TEMP. CONST. SIGNS/MARKINGS
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024045B29
|
2024-02-14
|
2024-05-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024045B27
|
2024-02-14
|
2024-05-13
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024045B28
|
2024-02-14
|
2024-05-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024045A96
|
2024-02-14
|
2024-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A95
|
2024-02-14
|
2024-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A94
|
2024-02-14
|
2024-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A93
|
2024-02-14
|
2024-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A91
|
2024-02-14
|
2024-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A90
|
2024-02-14
|
2024-03-03
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A88
|
2024-02-14
|
2024-03-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A87
|
2024-02-14
|
2024-03-03
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A92
|
2024-02-14
|
2024-03-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045A89
|
2024-02-14
|
2024-03-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024045B34
|
2024-02-14
|
2024-05-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022024025A94
|
2024-01-25
|
2024-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A93
|
2024-01-25
|
2024-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A92
|
2024-01-25
|
2024-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A91
|
2024-01-25
|
2024-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A90
|
2024-01-25
|
2024-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A89
|
2024-01-25
|
2024-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A88
|
2024-01-25
|
2024-01-31
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A87
|
2024-01-25
|
2024-01-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A86
|
2024-01-25
|
2024-01-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022024025A85
|
2024-01-25
|
2024-01-31
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B012024025B89
|
2024-01-25
|
2024-01-31
|
RESET, REPAIR OR REPLACE CURB
|
OCEAN AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O
|
B042024025A42
|
2024-01-25
|
2024-01-31
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
OCEAN AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET AVENUE O
|
B022023307B13
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B12
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B11
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B10
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B09
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B08
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B07
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B06
|
2023-11-03
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B05
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B04
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B03
|
2023-11-03
|
2023-12-31
|
CROSSING SIDEWALK
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307B02
|
2023-11-03
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023307A72
|
2023-11-03
|
2023-12-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023307A71
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023307A70
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023307A69
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023307A68
|
2023-11-03
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023307A67
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023307A66
|
2023-11-03
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023307A65
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023307A64
|
2023-11-03
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023234C75
|
2023-08-22
|
2023-11-08
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023234C71
|
2023-08-22
|
2023-11-08
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023234C70
|
2023-08-22
|
2023-11-08
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023234C77
|
2023-08-22
|
2023-11-08
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023234C76
|
2023-08-22
|
2023-11-08
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023234C74
|
2023-08-22
|
2023-11-08
|
TEMP. CONST. SIGNS/MARKINGS
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023234C73
|
2023-08-22
|
2023-11-08
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023234C72
|
2023-08-22
|
2023-11-08
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B042023228A42
|
2023-08-16
|
2023-09-14
|
REPLACE SIDEWALK
|
54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE
|
B022023228B51
|
2023-08-16
|
2023-09-14
|
TEMPORARY PEDESTRIAN WALK
|
54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE
|
B022023228B50
|
2023-08-16
|
2023-09-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 19 AVENUE TO STREET 20 AVENUE
|
B022023222B22
|
2023-08-10
|
2023-11-07
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023201B84
|
2023-07-20
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022023201B83
|
2023-07-20
|
2023-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022023200A93
|
2023-07-19
|
2023-08-21
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200B02
|
2023-07-19
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200A96
|
2023-07-19
|
2023-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200A95
|
2023-07-19
|
2023-08-21
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200A97
|
2023-07-19
|
2023-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200B01
|
2023-07-19
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200B00
|
2023-07-19
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200A99
|
2023-07-19
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200A98
|
2023-07-19
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023200A94
|
2023-07-19
|
2023-08-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023194C71
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C74
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C73
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C72
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C70
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C69
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C68
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C67
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C66
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C65
|
2023-07-13
|
2023-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C64
|
2023-07-13
|
2023-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C63
|
2023-07-13
|
2023-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C62
|
2023-07-13
|
2023-08-21
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C61
|
2023-07-13
|
2023-08-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C60
|
2023-07-13
|
2023-08-21
|
CROSSING SIDEWALK
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023194C59
|
2023-07-13
|
2023-08-21
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023134A01
|
2023-05-14
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022023134A00
|
2023-05-14
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022023134A02
|
2023-05-14
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
11 AVENUE, BROOKLYN, FROM STREET 49 STREET TO STREET 50 STREET
|
B022023110A62
|
2023-04-20
|
2023-07-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023108A30
|
2023-04-18
|
2023-07-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023108A31
|
2023-04-18
|
2023-05-10
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023108A32
|
2023-04-18
|
2023-05-10
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
B022023104A54
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A53
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A52
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A51
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A50
|
2023-04-14
|
2023-07-01
|
TEMP. CONST. SIGNS/MARKINGS
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A49
|
2023-04-14
|
2023-07-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A48
|
2023-04-14
|
2023-07-01
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A47
|
2023-04-14
|
2023-07-01
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A45
|
2023-04-14
|
2023-07-02
|
PLACE MATERIAL ON STREET
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A46
|
2023-04-14
|
2023-07-01
|
CROSSING SIDEWALK
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B012023104A71
|
2023-04-14
|
2023-05-03
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B012023104A72
|
2023-04-14
|
2023-05-03
|
INSTALL FENCE
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A60
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A59
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A58
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A57
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A56
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022023104A55
|
2023-04-14
|
2023-07-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
54 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|