2025-03-31
|
No data
|
COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW in compliance
|
2025-03-30
|
No data
|
ROGERS AVENUE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Full sidewalk restoration in front of aka #2607 Snyder
|
2025-03-30
|
No data
|
JEROME AVENUE, FROM STREET SHEEPSHEAD BAY ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramp within the bend of SE4 corner quadrant are Ada compliant. Measured and collected in prism on 3/30/25.
|
2025-03-29
|
No data
|
TROY AVENUE, FROM STREET MAPLE STREET TO STREET MIDWOOD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in roadway. BPP in compliance.
|
2025-03-28
|
No data
|
GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
STIP VIOLATION NOT ENOUGH PROTECTIVE BARRIERS
|
2025-03-28
|
No data
|
EAST 32 STREET, FROM STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No work started. No work done.
|
2025-03-28
|
No data
|
CLASSON AVENUE, FROM STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active work being done in the SW1 corner quadrant at the time of inspection. Will measure and collect on a later date when completed.
|
2025-03-27
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed on the sidewalk is in compliance
|
2025-03-27
|
No data
|
MIDWOOD STREET, FROM STREET TROY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed that the respondent failed to comply with the terms and conditions of the DOT permit by paving the roadway without prior notification to the Brooklyn Hiqa office as required by the hiqa stipulation 1/2+5 of permit.
|
2025-03-25
|
No data
|
DUMONT AVENUE, FROM STREET LEGION STREET TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 33ftWidth of milled area: 21ft Length of milled area: 123ftDepth of milled area: 3in down
|
2025-03-25
|
No data
|
4 AVENUE, FROM STREET 3 STREET TO STREET 5 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTORS ROADWAY CURB TO CURB IS 39FT. MILLED ROADWAY IS 210FT X 24FT WITH A DEPTH OF 3 INCHES
|
2025-03-25
|
No data
|
DUMONT AVENUE, FROM STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 35ft Width of milled area: 22ftLength of milled area: 22ftDepth of milled area: 3in down
|
2025-03-25
|
No data
|
SARATOGA AVENUE, FROM STREET BLAKE AVENUE TO STREET DUMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 43ft 9inWidth of milled area: 27ftLength of milled area: 47ftDepth of milled area: 3in down
|
2025-03-24
|
No data
|
WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Walkway on sidewalk in compliance.
|
2025-03-23
|
No data
|
BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2025-03-23
|
No data
|
4 AVENUE, FROM STREET 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within NW2 corner quadrant are non Ada compliant. Measured and collected in prism on 3/23/25.
|
2025-03-22
|
No data
|
BEACH 13 STREET, FROM STREET SEAGIRT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be ADA compliant. Measured and collected in prism on 3/22/25.
|
2025-03-22
|
No data
|
MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb is in compliance
|
2025-03-22
|
No data
|
BEACH 12 STREET, FROM STREET HEYSON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp within the SE4 corner quadrant was found to be ADA compliant. Measured and collected in prism on 3/22/25.
|
2025-03-22
|
No data
|
BEACH 13 STREET, FROM STREET HEYSON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SE4 corner quadrant was found to be ADA compliant. Measured and collected in prism on 3/22/25.
|
2025-03-21
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the SW corner quadrant is ADA compliant. Updated in Prism on 4/10/23.
|
2025-03-21
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NE3 corner quadrant are ADA. Measured in prism 9/12/24
|
2025-03-21
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the NW2 corner quadrant is ADA. Measured in prism on 5/10/23.
|
2025-03-21
|
No data
|
MEEKER AVENUE, FROM STREET NORTH HENRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NE3 corner quadrant are Ada compliant. fixed curb reveal , previously Measured and collected in prism on 3/4/25.
|
2025-03-20
|
No data
|
ANTHONY AVENUE, FROM STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant are ADA compliant. Previously measured and collected in Prism on 11/26/24.
|
2025-03-20
|
No data
|
CONCORD AVENUE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pedestrian walk in compliance
|
2025-03-19
|
No data
|
EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed ramp within the NW2 corner quadrant is ADA. Measured in Prism 6/11/24.
|
2025-03-19
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 7/6/23.
|
2025-03-17
|
No data
|
BERRIMAN STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Occupancy of sidewalk permit is in compliance at this time.
|
2025-03-16
|
No data
|
KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 3/16/25.
|
2025-03-16
|
No data
|
EAST 163 STREET, FROM STREET SHERIDAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner are Ada compliant. Previously measured and collected in prism on 7/15/24. Spot checked on 3/16/25.
|
2025-03-16
|
No data
|
MEEKER AVENUE, FROM STREET MONITOR STREET TO STREET NORTH HENRY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed in compliance
|
2025-03-16
|
No data
|
NOSTRAND AVENUE, FROM STREET DE KALB AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 3/16/25.
|
2025-03-15
|
No data
|
GEM STREET, FROM STREET MESEROLE AVENUE TO STREET NORTH 15 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restored in compliance.
|
2025-03-14
|
No data
|
14 AVENUE, FROM STREET 62 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started. No work done.
|
2025-03-14
|
No data
|
BERRIMAN STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp pedestrian walkway found
|
2025-03-14
|
No data
|
MANHATTAN AVENUE, FROM STREET FREEMAN STREET TO STREET GREEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway: 50'0'' x Width of milled area: 30'0'' x Length of milled area: 84'2'' x Depth of milled area 0'3''
|
2025-03-14
|
No data
|
FOAM PLACE, FROM STREET SMITH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the SE4 corner quadrant was found to be Ada compliant. Measured and collected in prism on 8/27/24.
|
2025-03-14
|
No data
|
SAXON AVENUE, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP paved roadway
|
2025-03-14
|
No data
|
8 STREET, FROM STREET MAIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant are ADA compliant. Measured and collected in prism on 12/2/2022.
|
2025-03-13
|
No data
|
PURVIS STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/w was paved.
|
2025-03-13
|
No data
|
MIDWOOD STREET, FROM STREET TROY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 3/13/25.
|
2025-03-12
|
No data
|
QUEENS PLAZA EAST, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Will pass out CAR and issue new NP to different GC
|
2025-03-12
|
No data
|
38 AVENUE, FROM STREET 28 STREET TO STREET 29 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Double yellow pavement lane markings over builders paving need to be restored in kind IFO 28-08
|
2025-03-12
|
No data
|
TROY AVENUE, FROM STREET MAPLE STREET TO STREET MIDWOOD STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Roadway open at this time.
|
2025-03-12
|
No data
|
EAST 203 STREET, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2025-03-12
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Will pass out CAR and issue new NP
|
2025-03-12
|
No data
|
14 AVENUE, FROM STREET 62 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 3/12/25.
|
2025-03-11
|
No data
|
EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in place at time of inspection.
|
2025-03-11
|
No data
|
35 AVENUE, FROM STREET 44 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Reconstructed tangent ramps within the NE3 corner quadrant was found to be Ada compliant. Measured and collected in prism on 2/26/25.
|
2025-03-11
|
No data
|
EAST 144 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in place at time of inspection.
|
2025-03-11
|
No data
|
EAST 144 STREET, FROM STREET GERARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in place at time of inspection.
|
2025-03-11
|
No data
|
GERARD AVENUE, FROM STREET EXTERIOR STREET TO STREET EAST 144 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in place at time of inspection.
|
2025-03-11
|
No data
|
QUEENS BOULEVARD, FROM STREET 65 ROAD TO STREET 66 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints sawed down to depth of roadway and joints sealed.
|
2025-03-11
|
No data
|
EAST 116 STREET, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SW1 corner quadrant are Ada compliant. Measured in prism on 7/19/24
|
2025-03-11
|
No data
|
MIDWOOD STREET, FROM STREET ALBANY AVENUE TO STREET TROY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Pass - Half plus five in compliance (W20ft of 30ft milled)
|
2025-03-10
|
No data
|
WASHINGTON AVENUE, FROM STREET WEIHER COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner quadrant is Ada compliant, Ramp was measured and collected in prism on 3/10/25.
|
2025-03-09
|
No data
|
BERGEN AVENUE, FROM STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2025-03-09
|
No data
|
BERGEN AVENUE, FROM STREET EAST 149 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2025-03-09
|
No data
|
WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced
|
2025-03-09
|
No data
|
BROOK AVENUE, FROM STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced
|
2025-03-08
|
No data
|
WEIHER COURT, FROM STREET 3 AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done , donofrio working on sidewalk at this time transformer vault being installed
|
2025-03-08
|
No data
|
EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done
|
2025-03-07
|
No data
|
BRUCKNER BOULEVARD, FROM STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 3/7/25.
|
2025-03-07
|
No data
|
VILLA AVENUE, FROM STREET EAST 205 STREET TO STREET VAN CORTLANDT AVENUE EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2025-03-07
|
No data
|
WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
IFO 341, NOV for the respondent actively working / milling roadway for a Builders Pavement Plan restoration at 11:16AM. Respondent failed to comply with Stipulation OCMC09 by working outside of their stipulated hours of 9PM - 5AM.
|
2025-03-06
|
No data
|
KOSCIUSKO STREET, FROM STREET NOSTRAND AVENUE TO STREET SPENCER COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed on the sidewalk is in compliance
|
2025-03-05
|
No data
|
AVENUE C, FROM STREET EAST 6 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NE3 corner quadrant are ADA. Measured prism 11/16/23.
|
2025-03-05
|
No data
|
168 STREET, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP has been done and roadway is incompliance.
|
2025-03-05
|
No data
|
90 AVENUE, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP has been done and roadway incompliance.
|
2025-03-05
|
No data
|
COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP in compliance
|
2025-03-05
|
No data
|
168 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP has been done and roadway is incompliance.
|
2025-03-04
|
No data
|
MEEKER AVENUE, FROM STREET NORTH HENRY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant are non Ada compliant. Remove plastic and fix curb reveal, Measured and collected in prism on 3/4/25.
|
2025-03-03
|
No data
|
EAST 194 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP Work done
|
2025-03-02
|
No data
|
TROY AVENUE, FROM STREET MAPLE STREET TO STREET MIDWOOD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind.
|
2025-03-02
|
No data
|
CHURCH AVENUE, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind.
|
2025-03-02
|
No data
|
MC DONALD AVENUE, FROM STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner found to be ADA compliant. Previously Measured & collected in Prism on 10/11/24. Refer to permit B042024239A41
|
2025-02-28
|
No data
|
COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Before milling the width of roadway was 29’ 9" Width milled is 20’ & Length milled is 28' 2” & Depth is 3". Foreman on site.
|
2025-02-28
|
No data
|
28 STREET, FROM STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SE4 corner quadrant. Unable to measure due to active construction on roadway blocking ramps. Will reinspect at a later date.
|
2025-02-28
|
No data
|
DECATUR AVENUE, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2025-02-28
|
No data
|
GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2025-02-27
|
No data
|
28 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bike Lane and crosswalk pavement markings over BPP need to be restored in kind at 28-08 38 Avenue
|
2025-02-27
|
No data
|
51 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway 28FT width of milled area 23FT length of milled area 30FT depth of milled area 4IN.
|
2025-02-26
|
No data
|
35 AVENUE, FROM STREET 44 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly reconstructed tangent ramps within the NE3 corner quadrant was found to be Ada compliant. Measured and collected in prism on 2/26/25.
|
2025-02-26
|
No data
|
HOPKINSON AVENUE, FROM STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly Completed tangent within NE3 corner quadrant are Ada compliant. Measured and collected in prism on 2/26/25.
|
2025-02-26
|
No data
|
MANHATTAN AVENUE, FROM STREET FREEMAN STREET TO STREET GREEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, restoring sidewalk, site in compliance.
|
2025-02-25
|
No data
|
PENNSYLVANIA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2025-02-25
|
No data
|
SNYDER AVENUE, FROM STREET VERONICA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Properly score sidewalk grade breaks was done in the north east corner. Completed tangent ramps in the NE3 corner quadrant are Ada compliant, Ramps was previously measured and collected in prism on 1/24/25.
|
2025-02-25
|
No data
|
58 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent has the entire roadway closed off to traffic with a construction sign and cones. Failed to comply with stipulation 023, Maintain one 11 foot lane for traffic. Cited permit used for ID.
|
2025-02-24
|
No data
|
BEACH 13 STREET, FROM STREET HEYSON ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new pedestrian ramp work starts at this time within the NE3 corner quadrant. Pre existing ramps was done by government contractor HEAVY CONSTRUCTION CO., INC.
|
2025-02-24
|
No data
|
WASHINGTON AVENUE, FROM STREET WEIHER COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE corner quadrant is completed. Unable to measure due to active BPP construction at time of inspection. Boom lift blocking corner for inspection. Will need to be reinspected.
|
2025-02-24
|
No data
|
BEACH 12 STREET, FROM STREET HEYSON ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single ramp within the SE4 corner quadrant in functional but not accessible at this time due to jersey barriers used for temporary walkway. We’ll measure at a later date.
|
2025-02-24
|
No data
|
BEACH 13 STREET, FROM STREET SEAGIRT BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new pedestrian ramp work starts at this time within the NE3 corner quadrant. Pre existing ramps was done by government contractor HEAVY CONSTRUCTION CO., INC.
|
2025-02-23
|
No data
|
90 AVENUE, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel-face curb installed in front of 166-20.
|
2025-02-23
|
No data
|
BRUCKNER BOULEVARD, FROM STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 2/23/25.
|
2025-02-23
|
No data
|
BERGEN STREET, FROM STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps found to be Ada compliant, measured and collected on 12/10/24
|
2025-02-23
|
No data
|
168 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel-face curb installed.
|
2025-02-23
|
No data
|
168 STREET, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel-face curb installed.
|
2025-02-22
|
No data
|
7 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2 + 5 feet of the roadway, adjacent to the property, was milled and paved.
|
2025-02-21
|
No data
|
GRAND STREET, FROM STREET LUDLOW STREET TO STREET ORCHARD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of #330, sidewalk flags & curb-line have been restored in kind.
|
2025-02-21
|
No data
|
BUSHWICK AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Previously Measured and collected in prism on 7/11/24.
|
2025-02-21
|
No data
|
BRUCKNER BOULEVARD, FROM STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed ramps in the SW1 corner quadrant unable to measure and collect barricade blocking corner at this time.
|
2025-02-19
|
No data
|
ST EDWARDS STREET, FROM STREET AUBURN PLACE TO STREET NORTH ELLIOTT WALK
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED AND SEALED
|
2025-02-17
|
No data
|
RALPH AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2025-02-17
|
No data
|
14 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1/2 + 5 feet of the roadway was milled and paved, in front of 6202 14 Avenue.
|
2025-02-16
|
No data
|
WEIHER COURT, FROM STREET 3 AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp walk
|
2025-02-16
|
No data
|
WASHINGTON AVENUE, FROM STREET EAST 164 STREET TO STREET WEIHER COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Ped walk in compliance
|
2025-02-15
|
No data
|
CLINTON PLACE, FROM STREET DAVIDSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2025-02-15
|
No data
|
CLINTON PLACE, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done
|
2025-02-14
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in place
|
2025-02-13
|
No data
|
CEDAR STREET, FROM STREET EAST 17 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NW2 corner is functional & accessible. We’ll measure & reinspect at a later date when work is completed.
|
2025-02-13
|
No data
|
91 AVENUE, FROM STREET DEAD END TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
at this time no BPP paving done
|
2025-02-13
|
No data
|
WOODWARD AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Street opening without a permit.
|
2025-02-12
|
No data
|
168 STREET, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
paved BPP measures 238' x 20'
|
2025-02-12
|
No data
|
90 AVENUE, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
paved BPP measures 289' x 16'
|
2025-02-12
|
No data
|
168 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
paved BPP measures 135' x 20'
|
2025-02-11
|
No data
|
WEIHER COURT, FROM STREET 3 AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
I observed the respondent failed to comply with the conditions and agreement of this permit by violating stipulation 014. Failed to maintain a 5ft pedestrian walkway in the roadway.
|
2025-02-10
|
No data
|
WASHINGTON AVENUE, FROM STREET EAST 164 STREET TO STREET WEIHER COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started
|
2025-02-10
|
No data
|
WEIHER COURT, FROM STREET 3 AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Has fence on sidewalk
|
2025-02-08
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the NE3 corner quadrant is ADA compliant. Measured in prism on 7/6/23
|
2025-02-08
|
No data
|
ELM PLACE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2025-02-08
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp withinn the NE3 corner is ADA compliant. Measured in prism on 6/29/23.
|
2025-02-08
|
No data
|
HOPE STREET, FROM STREET KEAP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SW1 corner are ADA compliant. Measured in prism on 2/20/23
|
2025-02-08
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2025-02-07
|
No data
|
COOPER AVENUE, FROM STREET 72 PLACE TO STREET 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Paved Street 37' X 20' IFO 72-41 Cooper Avenue.
|
2025-02-07
|
No data
|
EAST 90 STREET, FROM STREET YORK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NW2 corner quadrant are ADA. Measured in prism 2/7/25
|
2025-02-07
|
No data
|
COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed, expansion joints have been sealed
|
2025-02-06
|
No data
|
EAST 152 STREET, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly installed curb in place at time of inspection.
|
2025-02-05
|
No data
|
WASHINGTON AVENUE, FROM STREET WEIHER COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new Ped ramp work done in the SE4 corner quadrant, permit still active.
|
2025-02-05
|
No data
|
CEDAR STREET, FROM STREET EAST 17 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the SW1 corner found not to be ADA compliant due to excessive landing running slope. Measured & collected in Prism on 2/5/25.
|
2025-02-04
|
No data
|
SCHENCK AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2025-02-04
|
No data
|
WASHINGTON AVENUE, FROM STREET WEIHER COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new Ped ramps done in work done in the NE3 corner quadrant, permit still active.
|
2025-02-04
|
No data
|
EAST 17 STREET, FROM STREET AVENUE M TO STREET CEDAR STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Pass - Half plus five in compliance. 20ft milled of 30ft. Paving in progress, lane markings to be restored in kind.
|
2025-02-04
|
No data
|
CEDAR STREET, FROM STREET EAST 17 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Pass - Half plus five in compliance. 20ft milled of 30ft. Paving in progress, lane markings to be restored in kind.
|
2025-02-04
|
No data
|
CEDAR STREET, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Pass - Half plus five in compliance. 20ft milled of 30ft. Paving in progress, lane markings to be restored in kind.
|
2025-02-04
|
No data
|
COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed, expansion joints sealed
|
2025-02-04
|
No data
|
BELMONT AVENUE, FROM STREET BARBEY STREET TO STREET SCHENCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2025-02-04
|
No data
|
BELMONT AVENUE, FROM STREET SCHENCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2025-02-03
|
No data
|
62 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1/5 + 5 feet of the roadway was milled and paved, pass. AKA 6202 14 Avenue.
|
2025-02-02
|
No data
|
90 AVENUE, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel-face curb installed front of 166-20.
|
2025-02-02
|
No data
|
ROGERS AVENUE, FROM STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 1/24/24. Open CAR ON FILE.
|
2025-02-02
|
No data
|
168 STREET, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel-face curb installed.
|
2025-02-02
|
No data
|
168 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel-face curb installed front of 166-20.
|
2025-02-01
|
No data
|
7 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb .
|
2025-01-31
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23.
|
2025-01-31
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner found to be ADA compliant. Ramps was previously measured & collected in Prism on 12/6/22.
|
2025-01-31
|
No data
|
DECATUR AVENUE, FROM STREET EAST 195 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2025-01-31
|
No data
|
HOPKINSON AVENUE, FROM STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 1/31/25.
|
2025-01-31
|
No data
|
ROGERS AVENUE, FROM STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 Corner quadrant are Ada compliant, Ramps was previously measured and collected in prism on 1/24/25.
|
2025-01-31
|
No data
|
VILLA AVENUE, FROM STREET EAST 205 STREET TO STREET VAN CORTLANDT AVENUE EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in placed for new BO
|
2025-01-30
|
No data
|
DUMONT AVENUE, FROM STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner are non ADA compliant. Measured in prism on 1/17/25
|
2025-01-30
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed tangent ramps are ADA compliant. Measured and collected in prism on 7/19/23. No further action is needed.
|
2025-01-30
|
No data
|
NORTH 1 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SE4 corner quadrant are ADA compliant. Measured and collected on 5/22/24.
|
2025-01-30
|
No data
|
CENTRAL AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance
|
2025-01-30
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner quadrant are ADA compliant. Previously measured and collected in Prism on 1/25/23.
|
2025-01-30
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner quadrant was found to be ADA compliant. Measured & collected in Prism on 7/5/23. After remeasuring ramps are ADA compliant.
|
2025-01-30
|
No data
|
STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site with milled roadway, in compliance
|
2025-01-30
|
No data
|
BOERUM STREET, FROM STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within SE4 corner quadrant are Ada compliant. Measured and collected in prism on 6/17/24.
|
2025-01-29
|
No data
|
14 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete for property
|
2025-01-29
|
No data
|
14 AVENUE, FROM STREET 62 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done for property #6202 in compliance
|
2025-01-29
|
No data
|
62 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed
|
2025-01-29
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/11/24.
|
2025-01-28
|
No data
|
38 AVENUE, FROM STREET 28 STREET TO STREET 29 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP for the corner property of 28-08 completed and acceptable. curb to curb - 39' 3", milled - 25' 4" x 120', depth - 3".
|
2025-01-28
|
No data
|
44 STREET, FROM STREET 34 AVENUE TO STREET 35 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No temp walkway on site.
|
2025-01-28
|
No data
|
ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2025-01-28
|
No data
|
EAST 180 STREET, FROM STREET ANTHONY AVENUE TO STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2025-01-28
|
No data
|
30 AVENUE, FROM STREET 12 STREET TO STREET 14 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel faced curb installed in front of 12-16.
|
2025-01-28
|
No data
|
28 STREET, FROM STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP for the corner property of 28-08 completed and acceptable. curb to curb - 46' , milled - 27' x 22' , depth - 3".
|
2025-01-28
|
No data
|
28 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP for the corner property of 28-08 completed and acceptable. curb to curb - 29', milled - 157' x 19' , depth - 3".
|
2025-01-27
|
No data
|
PARK AVENUE, FROM STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner is ADA compliant. Measured and collected in prism on 5/22/24. Curb reveal fixed.
|
2025-01-27
|
No data
|
ATLANTIC AVENUE, FROM STREET JEROME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the SE4 corner quadrant was found to be Ada compliant. Measured and collected in prism on 6/23/24.
|
2025-01-27
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the SE4 corner quadrant was found to be Ada compliant. Measure and collected in prism on 4/1/24. Updated 6/23/24.
|
2025-01-26
|
No data
|
COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2025-01-26
|
No data
|
GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WOOD BRACING NOT REMOVED FROM AROUND TREE PIT
|
2025-01-26
|
No data
|
3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced ifo property 129
|
2025-01-25
|
No data
|
35 AVENUE, FROM STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 1/25/25.
|
2025-01-24
|
No data
|
SNYDER AVENUE, FROM STREET VERONICA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 1/24/25.
|
2025-01-24
|
No data
|
ROGERS AVENUE, FROM STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 Corner quadrant are Ada compliant, Ramps was measured and collected in prism on 1/24/25.
|
2025-01-24
|
No data
|
DUMONT AVENUE, FROM STREET LEGION STREET TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractor failed to install expansion joints every 20 feet for new sidewalk. Please Restore sidewalk back to kind.
|
2025-01-24
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within NW2 corner quadrant was found to be Ada compliant. Measured and collected in prism on 6/8/24.
|
2025-01-24
|
No data
|
FULTON STREET, FROM STREET NEW JERSEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Government contractor, P & T II CONTRACTING CORP is now responsible for the SE4 corner quadrant that has saw cuts.
|
2025-01-23
|
No data
|
EASTERN PARKWAY, FROM STREET BUFFALO AVENUE TO STREET ROCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP roadwork currently in process. Brooklyn inspector is on-site.
|
2025-01-23
|
No data
|
STOCKHOLM STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site working on the SW
|
2025-01-22
|
No data
|
DUMONT AVENUE, FROM STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit for the partial concrete restoration on the nw corner. We’ll measure at a later date.
|
2025-01-18
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 192 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2025-01-18
|
No data
|
EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE TO STREET VALENTINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2025-01-17
|
No data
|
90 AVENUE, FROM STREET 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please refer to permit #Q042025013A23 for further information.
|
2025-01-17
|
No data
|
DUMONT AVENUE, FROM STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps in the SW1 corner found not to be ADA compliant due to excessive roadway and curb reveal. Measured & collected in Prism on 1/17/25. We’ll return when roadway is paved completely.
|
2025-01-15
|
No data
|
ATLANTIC AVENUE, FROM STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
INTERSECTION HAS BEEN PAVED HALF +5
|
2025-01-13
|
No data
|
28 STREET, FROM STREET 38 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Active worksite, no defects found or blocked construction at time of inspection
|
2025-01-11
|
No data
|
2 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
bpp restoration in compliance
|
2025-01-10
|
No data
|
3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP restoration to grade
|
2025-01-10
|
No data
|
EAST 194 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in place
|
2025-01-10
|
No data
|
SUMPTER STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed & sealed
|
2025-01-09
|
No data
|
ECKFORD STREET, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete Curb to curb- 29ftLength- 92ftWidth- 20ftDepth- 3.5 inches
|
2025-01-09
|
No data
|
SUTTER AVENUE, FROM STREET AMBOY STREET TO STREET HOPKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONCRETE CURB INSTALLED
|
2025-01-09
|
No data
|
EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not done
|
2025-01-07
|
No data
|
45 STREET, FROM STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the NW corner quadrant was found to be ADA compliant. Measured and collected in prism on 12/18/24.
|
2025-01-07
|
No data
|
DUMONT AVENUE, FROM STREET LEGION STREET TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site constructing new sidewalk without proper pedestrian walkway in the roadway. d30 stipulation 014 violation.
|
2025-01-07
|
No data
|
35 AVENUE, FROM STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE corner quadrant was found to be non ADA compliant due to missing scoring along the full width of the corner quadrant. Previously measured and collected in Prism on 12/17/24.
|
2025-01-06
|
No data
|
EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in placed
|
2025-01-06
|
No data
|
CENTRAL AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RW paved by BPP
|
2025-01-06
|
No data
|
CENTRAL AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cement face curb installed, steel face for driveway
|
2025-01-04
|
No data
|
REV JAMES POLITE AVENUE, FROM STREET CHISHOLM STREET TO STREET FREEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2025-01-04
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire sidewalk replaced through out even # side of segment. Minor hairline crack observed on a few flags.
|
2025-01-04
|
No data
|
CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2025-01-04
|
No data
|
ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire sidewalk replaced.
|
2025-01-04
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2025-01-04
|
No data
|
4 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2025-01-03
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2024-12-31
|
No data
|
BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed in compliance
|
2024-12-31
|
No data
|
MACE AVENUE, FROM STREET BARKER AVENUE TO STREET OLINVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed that the respondent failed to comply with the terms and conditions of DOT permit stip by paving the roadway without prior notification to the Bronx Hiqa office as required by hiqa stipulation 1/2+5 of permit.
|
2024-12-31
|
No data
|
GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Rw paved and in compliance
|
2024-12-31
|
No data
|
MAIN AVENUE, FROM STREET 8 STREET TO STREET 30 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2024-12-27
|
No data
|
VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2024-12-27
|
No data
|
CENTRAL AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permit expired
|
2024-12-22
|
No data
|
MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PASS NEW CURB AND SW
|
2024-12-21
|
No data
|
MC DONALD AVENUE, FROM STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for corner property #369 Quentin Rd
|
2024-12-21
|
No data
|
MC DONALD AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for corner property #369 Quentin Rd
|
2024-12-21
|
No data
|
GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP restoration to grade on segment nearest Archer Avenue.
|
2024-12-20
|
No data
|
EAST 90 STREET, FROM STREET 1 AVENUE TO STREET YORK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I found the respondent with a 5' walk in the roadway with barriers. Respondent failed to comply with terms and conditions of DOT permit stipulation 014 walkway must be ramped at the re-entry to the sidewalk for handicapped accessibility.
|
2024-12-20
|
No data
|
CENTRAL AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway 33'8'' x Width of milled area 21'9'' x Length of milled area 69'6'' x Depth of milled area 0'3'' i/f/o 435.
|
2024-12-20
|
No data
|
169 STREET, FROM STREET 45 AVENUE TO STREET 46 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restored I/F/O 45-61 169th Street
|
2024-12-20
|
No data
|
COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Flags restored in compliance i/f/o 162.
|
2024-12-20
|
No data
|
YORK AVENUE, FROM STREET EAST 90 STREET TO STREET EAST 91 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I found the respondent with a 5' walk in the roadway with barriers. Respondent failed to comply with terms and conditions of DOT permit stipulation 014 walkway must be ramped at the re-entry to the sidewalk for handicapped accessibility.
|
2024-12-19
|
No data
|
BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No temp walkway.
|
2024-12-19
|
No data
|
62 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb and flags on corner property to grade. In front of property #6202 14 Ave.
|
2024-12-19
|
No data
|
BELMONT AVENUE, FROM STREET BARBEY STREET TO STREET SCHENCK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit: B012024353B73Width of Roadway: 30’Width of milled area: 20’Length of milled area: 114’Depth of milled area: 3”
|
2024-12-19
|
No data
|
SCHENCK AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit: B012024353B73Width of Roadway: 28’Width of milled area: 18’Length of milled area: 133’Depth of milled area: 3”
|
2024-12-19
|
No data
|
BELMONT AVENUE, FROM STREET SCHENCK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit: B012024353B74Width of Roadway: 31’Width of milled area: 21’Length of milled area: 31’Depth of milled area: 3”
|
2024-12-18
|
No data
|
BEDFORD AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Before milling the width of roadway was 47’ 9” Width milled is 29’ & Length milled is 109' 2” & Depth is 2.5" before reaching the concrete base. Foreman on site.
|
2024-12-18
|
No data
|
45 STREET, FROM STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single ramp within the NW2 corner quadrant was found to be Ada compliant. Measured and collected in prism on 12/18/24.
|
2024-12-18
|
No data
|
2 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no temp pedestrian walkway found
|
2024-12-17
|
No data
|
35 AVENUE, FROM STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant due to scoring. Measured and collected in prism on 12/17/24.
|
2024-12-17
|
No data
|
CARROLL STREET, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel faced curb installed, sealed and in compliance
|
2024-12-17
|
No data
|
CHURCH AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 12/17/24.
|
2024-12-16
|
No data
|
CHURCH AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner unable to measure due to weather (rain). We’ll measure at a later date.
|
2024-12-14
|
No data
|
BARKER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP work done with 1 Acceptable bump out
|
2024-12-14
|
No data
|
BARKER AVENUE, FROM STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP paved 1/2 plus 5 of intersection
|
2024-12-14
|
No data
|
BARKER AVENUE, FROM STREET THWAITES PLACE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2 plus 5 of the roadway paved
|
2024-12-13
|
No data
|
30 AVENUE, FROM STREET 12 STREET TO STREET 14 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP passed and completed. (59'6" x 25'3" x 3").
|
2024-12-13
|
No data
|
FRANKLIN AVENUE, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in place and in compliance at this time
|
2024-12-12
|
No data
|
PARK AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done, refer to latest permit on file M012024212B17
|
2024-12-12
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE corner quadrant was found to be ADA compliant. Measured and collected in Prism on 3/14/24.
|
2024-12-12
|
No data
|
3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No temp walkway on site.
|
2024-12-11
|
No data
|
14 AVENUE, FROM STREET 62 STREET TO STREET 63 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There is a new curb and new flags in front of property # 6202 14 ave
|
2024-12-11
|
No data
|
YORK AVENUE, FROM STREET EAST 90 STREET TO STREET EAST 91 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Respondent failed to have a valid DOT permit to use the street.
|
2024-12-10
|
No data
|
WOODWARD AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
D01 for failure to take out 119 for BPP repave on the above segment. The pulled for Q012023167B44 Woodward Ave b/w Harman & Himrod, instead of Woodward Ave b/w Harman & Greene.
|
2024-12-10
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner quadrant are ADA compliant. Previously measured and collected in Prism on 7/6/23.
|
2024-12-10
|
No data
|
EAST 205 STREET, FROM STREET GRAND CONCOURSE TO STREET LISBON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Spoke to Lenny 190 E 205 St. BPP 20'X36'X3'' PASSES.
|
2024-12-10
|
No data
|
VILLA AVENUE, FROM STREET EAST 205 STREET TO STREET VAN CORTLANDT AVENUE EAST
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Carlos on site 35'x20'x3'' BPP. Heating up the asphalt. Passes 1/2+5'.
|
2024-12-09
|
No data
|
ECKFORD STREET, FROM STREET DRIGGS AVENUE TO STREET ENGERT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb has been replaced IFO property 65
|
2024-12-08
|
No data
|
CROTONA AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New Building, street repaved
|
2024-12-07
|
No data
|
ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started
|
2024-12-07
|
No data
|
COVERT STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk in place for property for sale.
|
2024-12-07
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2024-12-05
|
No data
|
CROPSEY AVENUE, FROM STREET BAY 31 STREET TO STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk/curb reset for property in compliance
|
2024-12-05
|
No data
|
2 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
bpp completed Length: 69' 0" width of roadway 30 ' 0" width milled 20' 3 " Depth 3" prior to reaching concrete
|
2024-12-05
|
No data
|
30 AVENUE, FROM STREET 12 STREET TO STREET 14 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Verified. The sidewalk is concrete curing at this time, barricaded off on the sidewalk. Spoke to the foreman about this condition. Active permit on file.
|
2024-12-05
|
No data
|
3 STREET, FROM STREET BOND STREET TO STREET BODY OF WATER
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
bpp completed Length: 185' 6" width of roadway 53 ' 0" width milled 31' 6 " Depth 3" prior to reaching concrete
|
2024-12-04
|
No data
|
MC DONALD AVENUE, FROM STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 found to be ADA compliant. Measured & collected in Prism on 12/4/24.
|
2024-12-03
|
No data
|
GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant was found to be non Ada compliant. No scoring. Measured and collected in prism on 3/8/24.
|
2024-12-01
|
No data
|
SAXON AVENUE, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and curb in compliance
|
2024-12-01
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
concrete curb installed in compliance ifo 412
|
2024-11-30
|
No data
|
VERONICA PLACE, FROM STREET ERASMUS STREET TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb reset
|
2024-11-30
|
No data
|
SNYDER AVENUE, FROM STREET ROGERS AVENUE TO STREET VERONICA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset
|
2024-11-30
|
No data
|
ROGERS AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb has been reset
|
2024-11-29
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 4/30/23.
|
2024-11-29
|
No data
|
METROPOLITAN AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done
|
2024-11-29
|
No data
|
BUSHWICK AVENUE, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in the roadway is in compliance
|
2024-11-27
|
No data
|
CEDAR STREET, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in the roadway is in compliance
|
2024-11-27
|
No data
|
BUSHWICK AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in the roadway is in compliance
|
2024-11-26
|
No data
|
FRANKLIN AVENUE, FROM STREET CARROLL STREET TO STREET PRESIDENT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 33ft 3inWidth of milled area: 22ft 1in Length of milled area: 35ft 1inDepth of milled area: 3in down
|
2024-11-26
|
No data
|
NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS SEALED
|
2024-11-26
|
No data
|
BEDFORD AVENUE, FROM STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 11/16/23.
|
2024-11-26
|
No data
|
CARROLL STREET, FROM STREET FRANKLIN AVENUE TO STREET PEDESTRIAN OVERPASS
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 33ft 3inWidth of milled area: 21ft 6inLength of milled area: 128ft 3in Depth of milled area: 3in down
|
2024-11-26
|
No data
|
168 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONSTRUCT NEW SIDEWALK IN PROGRESS . INFORMED SUPERVISOR ABOUT WALKWAY
|
2024-11-25
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner found to be ADA compliant. Remeasured & collected in Prism on 3/13/24.
|
2024-11-25
|
No data
|
ALBEMARLE ROAD, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 Corner quadrant are Ada compliant, Ramps was measured and collected in prism on 11/25/24.
|
2024-11-25
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane markings restored at this time.
|
2024-11-25
|
No data
|
BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 1/23/24.
|
2024-11-25
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner found to be ADA compliant. M.C 3/16/23.
|
2024-11-24
|
No data
|
ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPp completed, in compliance bus lane markers restored in kind
|
2024-11-24
|
No data
|
CHURCH AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed, corner property 1/2+5 done in the intersection
|
2024-11-24
|
No data
|
CHURCH AVENUE, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed in compliance ifo 2700-2718
|
2024-11-24
|
No data
|
DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is incompliance.
|
2024-11-24
|
No data
|
YORK STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP restoration to grade IFO property 177
|
2024-11-22
|
No data
|
ALBEMARLE ROAD, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner quadrant is Ada compliant, Ramp was measured and collected in prism on 11/22/24.
|
2024-11-22
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Previously measured in prism on 6/16/22 updated on 1/17/23. second ramp on van sinderen was installed by MTA,GC only installed ramp on Livonia
|
2024-11-22
|
No data
|
46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed new curb constructed IFO property 1155, flag and expansion joint restored in kind.
|
2024-11-22
|
No data
|
BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner unable to add new ramp running measurements that were from previous permit # B042023122A08 in a CAR//NOV due to weather (rain). We’ll return to reinspect at another date.
|
2024-11-22
|
No data
|
BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition remained at that time of NOV last rejection was due to active permit# B042024268A72 as per Kerry. Pass this out and measure for compliance permit ending A72 for any further action.
|
2024-11-21
|
No data
|
60 STREET, FROM STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner quadrant, Unable to measure due to weather conditions (rain).
|
2024-11-20
|
No data
|
168 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB -EXCAVATED
|
2024-11-20
|
No data
|
BERGEN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container found on roadway
|
2024-11-20
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 7/6/23 & 4/12/24.
|
2024-11-20
|
No data
|
90 AVENUE, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB-portion of urb completed
|
2024-11-20
|
No data
|
90 AVENUE, FROM STREET 168 STREET TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB-portion of urb completed
|
2024-11-20
|
No data
|
168 STREET, FROM STREET 90 AVENUE TO STREET 91 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB-EXCAVATED WITH ACTIVE DOT PERMIT Q012024324B90 ON FILE.
|
2024-11-20
|
No data
|
168 STREET, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB-EXCAVATED WITH ACTIVE PERIT Q012024324B92 ON FILE
|
2024-11-20
|
No data
|
168 STREET, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB-EXCAVATED WITH ACTIVE PERIT Q012024324B92 ON FILE
|
2024-11-20
|
No data
|
EAST 144 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 11/20/24. Tif on location.
|
2024-11-19
|
No data
|
FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found to be ADA compliant. Previously measured & collected in Prism on 3/16/23.
|
2024-11-19
|
No data
|
EAST 203 STREET, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP passed 1/2 + 5 down 3”.
|
2024-11-19
|
No data
|
EAST 144 STREET, FROM STREET GERARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 11/19/24.
|
2024-11-18
|
No data
|
CEDAR STREET, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & curb is in compliance
|
2024-11-18
|
No data
|
NELSON AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in place.
|
2024-11-18
|
No data
|
9 AVENUE, FROM STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant are non ADA. Measured in prism 11/18/24. No action taken at this time for excessive roadway/curb reveal. BPP active & roadway unpaved
|
2024-11-17
|
No data
|
FRONT STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP restoration to grade IFO property 218
|
2024-11-16
|
No data
|
EAST 163 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street resurfaced new building stip
|
2024-11-16
|
No data
|
SHERIDAN AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street regrade new building stip
|
2024-11-15
|
No data
|
WEST 207 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp pedestrian walk is in compliance
|
2024-11-15
|
No data
|
9 AVENUE, FROM STREET BEND TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Temp walkway is in compliance
|
2024-11-15
|
No data
|
14 AVENUE, FROM STREET 62 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single tangent ramp within the SE4 corner quadrant is non Ada compliant. Measured and collected in prism on 11/15/24. Tiff on file
|
2024-11-14
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired. Permittee corrected the restoration by paving curbs flush in the NE3 corner.
|
2024-11-14
|
No data
|
95 AVENUE, FROM STREET 147 PLACE TO STREET 148 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cURB REPLACED.
|
2024-11-14
|
No data
|
148 STREET, FROM STREET 94 AVENUE TO STREET 95 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed.
|
2024-11-13
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired. Permittee did work in the NE3 corner on newer permit # B042024234A08.
|
2024-11-12
|
No data
|
95 AVENUE, FROM STREET 148 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner was found be ADA compliant. Measured and collected in prism on 11/12/24.
|
2024-11-10
|
No data
|
LENOX ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance 1/2+5 and flush to grade
|
2024-11-10
|
No data
|
BEDFORD AVENUE, FROM STREET CATON AVENUE TO STREET MARTENSE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel face curb in compliance installed ifo alka 80 (corner property)
|
2024-11-10
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel face curb in compliance installed ifo aka 80 (corner property)
|
2024-11-10
|
No data
|
MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
concrete curb in compliance installed ifo 62
|
2024-11-09
|
No data
|
PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway IFO property #529.
|
2024-11-06
|
No data
|
EAST 144 STREET, FROM STREET GERARD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
22’x22’ of 34’x34’ milled 2.5” Good
|
2024-11-06
|
No data
|
WALTON AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 144 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
22’of 34’ milled 2”. Cobblestone observed underneath 1/2+5 observed
|
2024-11-06
|
No data
|
EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
22’ of 34 width milled down 2”. 1/2+5 observed
|
2024-11-06
|
No data
|
GERARD AVENUE, FROM STREET EXTERIOR STREET TO STREET EAST 144 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
22’of 34’ milled down 2”. Cobblestone observed underneath 1/2+5 observed.
|
2024-11-06
|
No data
|
EAST 144 STREET, FROM STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
22’x22’ milled 2.5”Good
|
2024-11-05
|
No data
|
BERGEN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway found resurfaced
|
2024-11-05
|
No data
|
PENNSYLVANIA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please seal expansion joints for new sidewalk installed. Your permit expired 10/15/2024
|
2024-11-04
|
No data
|
PENNSYLVANIA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-11-04
|
No data
|
SOUNDVIEW AVENUE, FROM STREET MURRAY COURT TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed, curb reset in compliance
|
2024-11-04
|
No data
|
BOLTON AVENUE, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset new curb installed in compliance
|
2024-11-04
|
No data
|
BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 12/22/23. Remeasured and roadway repaired 1/22/24.
|
2024-11-04
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single tangent ramp within the NW2 corner quadrant is Ada compliant. Measured and collected in prism on 10/23/24
|
2024-11-02
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2024-11-02
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single tangent ramp within NE3 corner quadrant is Ada compliant. Measured and collected in prism on 7/19/23.
|
2024-11-02
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2024-11-02
|
No data
|
BROADWAY, FROM STREET MIDDLETON STREET TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed & sealed
|
2024-11-01
|
No data
|
JEROME AVENUE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced ifo 1700.
|
2024-11-01
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Roadway pavement crosswalk lane markings restored in the SW corner quadrant.
|
2024-10-31
|
No data
|
9 AVENUE, FROM STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started
|
2024-10-30
|
No data
|
EAGLE AVENUE, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found resurfaced under DOT permit number X152024191A01 work started on July 9, 2024/ Work End on August 30, 2024
|
2024-10-29
|
No data
|
BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 1/23/24.
|
2024-10-25
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway repaved for new building
|
2024-10-25
|
No data
|
EAST 79 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w paved
|
2024-10-25
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee obtained permit #Q042024183A49 for the NW corner quadrant.
|
2024-10-23
|
No data
|
WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2024-10-23
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single tangent ramp within the NW2 corner quadrant is Ada compliant. Measured and collected in prism on 10/23/24
|
2024-10-23
|
No data
|
EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Steel faced curb installed
|
2024-10-22
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 3/24/23.
|
2024-10-22
|
No data
|
FOAM PLACE, FROM STREET SMITH PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed single ramp within the SW1 corner quadrant was found to be Ada compliant. Plastic on DWS mat has been removed and expansion joints are sealed. Measured and collected in prism on 8/27/24.
|
2024-10-22
|
No data
|
NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints around street light need to be sealed
|
2024-10-22
|
No data
|
EAST 28 STREET, FROM STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed Single tangent ramp in the NE3 corner quadrant is ada compliant. Measured and collected in prism on 3/27/23.
|
2024-10-22
|
No data
|
ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved by BPP in compliance.
|
2024-10-22
|
No data
|
FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent single tangent ramp within the NE3 corner quadrant is ada compliant. Previously Measured and collected in prism on 3/16/23 and updated on 3/30/23.
|
2024-10-21
|
No data
|
EAST 215 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2 Plus 5 of the roadway paved
|
2024-10-19
|
No data
|
SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2024-10-19
|
No data
|
PENN STREET, FROM STREET BEDFORD AVENUE TO STREET LEE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2024-10-19
|
No data
|
BEDFORD AVENUE, FROM STREET CATON AVENUE TO STREET MARTENSE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street repaved for new building
|
2024-10-19
|
No data
|
BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street repaved for new building
|
2024-10-18
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
completed tangent ramps within the NE3 corner quadrant are Ada compliant. Previously Measure and collected in prism on 6/11/24. No tiff on file roadway counter slope is excessive. Roadway fixed
|
2024-10-16
|
No data
|
EAST 179 STREET, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in roadway in compliance
|
2024-10-16
|
No data
|
HONEYWELL AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2024-10-16
|
No data
|
168 STREET, FROM STREET 91 AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE RESPONDENT HAS EXCAVATED THE SIDEWALK AND FAILED TO MAINTAIN A 5 FOOT CLEAR PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY. STIPULATON (014) WAS VIOLATED. RESPONDENT ID THRU PERMT CITED. .
|
2024-10-16
|
No data
|
EAST 179 STREET, FROM STREET HONEYWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2024-10-16
|
No data
|
MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP Half plus 5 done, in compliance
|
2024-10-15
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Remeasured & collected in Prism 9/4/24.
|
2024-10-15
|
No data
|
WALTON AVENUE, FROM STREET EAST 140 STREET TO STREET EAST 144 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
i found the respondent with a 5' walk in the roadway with water filled barriers. Respondent failed to comply with terms and conditions of DOT permit stipulation 014 walkway must be ramped at the re-entry to the sidewalk for handicapped accessibility.
|
2024-10-15
|
No data
|
BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee failed to correct excessive ramp running slopes in the NE3 corner. Previously M&C in Prism on 10/17/23.
|
2024-10-15
|
No data
|
BEDFORD AVENUE, FROM STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 11/16/23.
|
2024-10-15
|
No data
|
EAST 194 STREET, FROM STREET DECATUR AVENUE TO STREET MARION AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1/2+5' and 3'' down I/F/O 364,368,372 E 194 St. Was told to sweep the area clean again. BPP Passes.
|
2024-10-14
|
No data
|
EAST 144 STREET, FROM STREET GERARD AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
5 FOOT CLEAR PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY.
|
2024-10-14
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Roadway counter fixed Completed tangent ramps within SW1 corner quadrant non Ada compliant. Previously Measured and collected in prism on 6/8/24.
|
2024-10-12
|
No data
|
WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in roadway in compliance
|
2024-10-11
|
No data
|
MC DONALD AVENUE, FROM STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 10/11/24.
|
2024-10-11
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 12/6/22 and re measured on 2/22/23 due to changes on the landing.
|
2024-10-11
|
No data
|
MC DONALD AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk/curb reset for property #369 Quentin Rd done in compliance
|
2024-10-11
|
No data
|
QUENTIN ROAD, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk/curb reset for property In compliance
|
2024-10-11
|
No data
|
STOCKTON STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 2/16/24.
|
2024-10-10
|
No data
|
CEDAR STREET, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway: 29'6'' x Width of milled area: 19'8'' x Length of milled area: 166'0'' x Depth of milled area: 0'3'' located i/f/o 60.
|
2024-10-10
|
No data
|
FRONT STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced IFO property 218
|
2024-10-10
|
No data
|
CONOVER STREET, FROM STREET DIKEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 7/20/23.
|
2024-10-10
|
No data
|
CLERMONT AVENUE, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant are ADA compliant. Measured and collected in Prism on 2/16/24.
|
2024-10-10
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please restore lane markings to bike lane that were removed by BPP.
|
2024-10-09
|
No data
|
BERGEN STREET, FROM STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 10/9/24.
|
2024-10-09
|
No data
|
EAST 10 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done. Only on Coney Island Ave.
|
2024-10-09
|
No data
|
NEW JERSEY AVENUE, FROM STREET FULTON STREET TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed, expansion joints sealed
|
2024-10-07
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner previously found not to be ADA compliant due to excessive roadway which has been paved. M&C in Prism on 9/4/24.
|
2024-10-07
|
No data
|
ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site roadway milled half+5’ in compliance with BPP specifications for NB 2718
|
2024-10-07
|
No data
|
CHURCH AVENUE, FROM STREET LLOYD STREET TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site roadway milled half+5’ in compliance with BPP specifications for NB 2718
|
2024-10-07
|
No data
|
CONEY ISLAND AVENUE, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Major perm in roadway. All lane markings restored in kind.
|
2024-10-07
|
No data
|
CHURCH AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site roadway milled half+5’ in compliance with BPP specifications for NB 2718
|
2024-10-04
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
New measurements added under permit M042024155A07
|
2024-10-03
|
No data
|
MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONCRETE CURB INSTALLED
|
2024-10-02
|
No data
|
EAST 116 STREET, FROM STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permit #M042024155A01 was obtained for the NW2 Corner quadrant.
|
2024-09-30
|
No data
|
ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB INSTALLED
|
2024-09-30
|
No data
|
ATLANTIC AVENUE, FROM STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 6/10/24. scoring done at the time of inspection.
|
2024-09-30
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed & sealed
|
2024-09-30
|
No data
|
ROGERS AVENUE, FROM STREET CHURCH AVENUE TO STREET ERASMUS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED, pass
|
2024-09-28
|
No data
|
NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Re-saved roadway completed at the corner of Albemarle Rd
|
2024-09-26
|
No data
|
CHURCH AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit on file. Newly completed tangent ramps in the SE4 corner found not to be ADA compliant due to excessive curb reveal and roadway counter slope. Measured & collected in Prism on 9/26/24.
|
2024-09-25
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired. Ramp running slope is ADA compliant. Remeasured & collected in Prism 9/4/24.
|
2024-09-25
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition resolved. Ramps were completed under permit B042022347A03, paving completed under permit B012023039B85. No further actions taken at this time.
|
2024-09-24
|
No data
|
YORK STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of R/W: 46'2'' x Width of milled area: 28'2'' x Length of milled area: 157'8'' x Depth of milled area: 0'3'' on York St. between Gold St. and Bridge St.
|
2024-09-24
|
No data
|
QUEENS PLAZA EAST, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly completed single ramp within the NE3 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 9/24/24.
|
2024-09-24
|
No data
|
FRONT STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of R/w: 28'2'' x Width of milled area: 20'4'' x Length of milled area: 176'4'' x Depth of milled area: 0'3'' i/f/o 218 Front St.
|
2024-09-24
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. Meanwhile and collected in prism on 9/24/24.
|
2024-09-23
|
No data
|
MC DONALD AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Pass - 1/2 +5 in compliance. L123ft W36ft of 60ft milled.
|
2024-09-23
|
No data
|
MC DONALD AVENUE, FROM STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Pass - 1/2 +5 in compliance - L36ft W36 D3in
|
2024-09-23
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner quadrant are Ada compliant, Ramps was previously measured and collected in prism on 8/7/24.
|
2024-09-20
|
No data
|
PENNSYLVANIA AVENUE, FROM STREET DUMONT AVENUE TO STREET LIVONIA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site milling the roadway
|
2024-09-20
|
No data
|
FLEET PLACE, FROM STREET FAIR STREET TO STREET WILLOUGHBY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Before milling the width of roadway is 26’ 3” & 40’ Width milled is 20’ & 25’ & Length milled is 137' 8” & Depth is 2.5" before reaching the concrete base. Foreman on site.
|
2024-09-19
|
No data
|
255 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP restoration paving done in front of 38-11.
|
2024-09-18
|
No data
|
ATLANTIC AVENUE, FROM STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPIN INSPECTION INTERSECTION IS MILLED 21FT X 22FT WITH A DEPTH OF 3 INCHES
|
2024-09-18
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved in compliance
|
2024-09-18
|
No data
|
ATLANTIC AVENUE, FROM STREET COLUMBUS PLACE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY CURB TO CURB IS 34FT MILLED ROADWAY IS 137FT X 22FT WITH A DEPTH OF 3 INCHES
|
2024-09-18
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant were reconstructed. ADA compliant. Re-measured and collected in Prism on 1/29/24.
|
2024-09-18
|
No data
|
RALPH AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY CURB TO CURB IS 34FT MILLED ROADWAY IS 109FT X 22FT WITH A DEPTH OF 3 INCHES
|
2024-09-17
|
No data
|
MARTENSE STREET, FROM STREET BEDFORD AVENUE TO STREET MARTENSE COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 33ft 10in Width of milled area: 22ft 4inLength of milled area: 44ft 7in Depth of milled area: 3in down
|
2024-09-17
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 4/07/23.
|
2024-09-17
|
No data
|
BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 1/24/23
|
2024-09-17
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are Ada compliant, ramps was previously measured and collected in prism on 8/5/24.
|
2024-09-15
|
No data
|
SMITH PLACE, FROM STREET FOAM PLACE TO STREET MOTT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed at time of my inspection .
|
2024-09-15
|
No data
|
FOAM PLACE, FROM STREET BEACH 18 STREET TO STREET SMITH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New Steel face curb installed at time of my inspection.
|
2024-09-15
|
No data
|
FOAM PLACE, FROM STREET SMITH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
measured paved areas only 22’ x 19’ 1/2/+5 paved at time of my inspection.
|
2024-09-13
|
No data
|
EAST 116 STREET, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done.
|
2024-09-13
|
No data
|
EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE corner quadrant are ADA compliant. Measured and collected in Prism on 6/11/24.
|
2024-09-13
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Builder's pavement restoration maintain to grade.
|
2024-09-12
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 7/6/23.
|
2024-09-12
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NE3 corner quadrant are ADA. Measured in prism 9/12/24
|
2024-09-11
|
No data
|
MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2024-09-11
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the NE3 corner quadrant Ada compliant. Ramp was measured and collected in prism on 5/10/23
|
2024-09-11
|
No data
|
MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pass width of roadway 28FT, width of milled area, 21FT length of milled area 60FT, depth of milled area 3IN.
|
2024-09-11
|
No data
|
JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW paved by BPP
|
2024-09-10
|
No data
|
MARCY AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Before milling the width of roadway was 39’ Width milled is 24’ 5" & Length milled is 34' 9” & Depth is 3". Foreman on site.
|
2024-09-09
|
No data
|
EAST 163 STREET, FROM STREET GRAND CONCOURSE TO STREET SHERIDAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP passed 1/2 +5 down 3”.
|
2024-09-07
|
No data
|
8 STREET, FROM STREET MAIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant was found to be ADA compliant. Measured and collected in prism on 12/2/2022.
|
2024-09-05
|
No data
|
EAST 179 STREET, FROM STREET DALY AVENUE TO STREET HONEYWELL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O 2026 BPP down 3 inches full width 29’ 1” of roadway paving 19’6 inch’s in compliance with DOT rules and regulations
|
2024-09-05
|
No data
|
HONEYWELL AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB
|
2024-09-05
|
No data
|
HONEYWELL AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP is in compliance DOT rules and regulations
|
2024-09-05
|
No data
|
EAST 179 STREET, FROM STREET HONEYWELL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2024-09-05
|
No data
|
EAST 116 STREET, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SW1 corner quadrant are Ada compliant. Measured in prism on 7/19/24
|
2024-09-04
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed updated work done in the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 9/4/24.
|
2024-09-04
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 2/21/24. Updated ram running slopes in Prism ADA but roadway remains excessive. Open CAR on permit # B042023116A18
|
2024-08-31
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2024-08-30
|
No data
|
36 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp work was done.
|
2024-08-29
|
No data
|
ATLANTIC AVENUE, FROM STREET JEROME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
INTERSECTION PAVED HALF +5
|
2024-08-29
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb repaired IFO property 557
|
2024-08-29
|
No data
|
BERGEN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb repaired IFO corner property 948.
|
2024-08-29
|
No data
|
FRANKLIN AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb repaired IFO corner property 948.
|
2024-08-29
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
INTERSECTION HAS BEEN PAVED
|
2024-08-29
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED INSTALLED
|
2024-08-29
|
No data
|
GRAND AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb repaired IFO property 527
|
2024-08-29
|
No data
|
WASHINGTON AVENUE, FROM STREET EASTERN PARKWAY TO STREET LINCOLN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb repaired IFO property 807
|
2024-08-28
|
No data
|
ANTHONY AVENUE, FROM STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner quadrant. Unable to measure and collect due to active roadway construction and jersey barriers still blocking corner quadrant as of 8/28/24.
|
2024-08-28
|
No data
|
CEDAR STREET, FROM STREET EVERGREEN AVENUE TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2024-08-27
|
No data
|
BOERUM STREET, FROM STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NW2 corner quadrant are Ada compliant. Previously Measured and collected in prism on 7/12/24.
|
2024-08-27
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SW1 corner quadrant are non Ada compliant. Previously Measured and collected in prism on 7/13/24. No scoring done on site.
|
2024-08-27
|
No data
|
FOAM PLACE, FROM STREET SMITH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp within the SW1 corner quadrant was found to be non Ada due to plastic on DWS mat and expansion joints not sealed. Measured and collected in prism on 8/27/24.
|
2024-08-24
|
No data
|
AVENUE C, FROM STREET EAST 6 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NE3 corner quadrant are ADA. Measured prism 11/16/23.
|
2024-08-22
|
No data
|
BROADWAY, FROM STREET MIDDLETON STREET TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp pass for new building 28 boerum st roadway milled & paved half+5’ in compliance with BPP specifications
|
2024-08-22
|
No data
|
BOERUM STREET, FROM STREET BROADWAY TO STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp pass for new building 28 boerum st roadway milled & paved half+5’ in compliance with BPP specifications
|
2024-08-22
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp pass for new building 28 boerum st roadway milled & paved half+5’ in compliance with BPP specifications
|
2024-08-22
|
No data
|
31 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Q012024233B16 • Curb to Curb width – 60’ • Milled area – 37’x35’• Depth of milled area – n/a not on site• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)-no
|
2024-08-22
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp pass for new building 28 boerum st roadway milled & paved half+5’ in compliance with BPP specifications
|
2024-08-21
|
No data
|
FOAM PLACE, FROM STREET SMITH PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
measured paved areas only 22’ x 19’
|
2024-08-21
|
No data
|
SMITH PLACE, FROM STREET FOAM PLACE TO STREET MOTT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
measured paved areas only 166’ x 19'
|
2024-08-21
|
No data
|
FOAM PLACE, FROM STREET BEACH 18 STREET TO STREET SMITH PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
measured paved areas only 84' x 20'
|
2024-08-21
|
No data
|
EAST 116 STREET, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NE3 corner quadrant are ADA. Measured in prism 8/21/24
|
2024-08-19
|
No data
|
GRAND AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
width of roadway- 33' width of milled area-22' length of milled area- 131' depth of milled area- 3"
|
2024-08-19
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
width of roadway -33' width of milled area-22' length of milled area- 25' depth of milled area- 3"
|
2024-08-19
|
No data
|
PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
width of roadway -33' width of milled area- 22' length of milled area- 45' depth of milled area-4"
|
2024-08-18
|
No data
|
BUSHWICK AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Previously Measured and collected in prism on 7/11/24.
|
2024-08-10
|
No data
|
ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2024-08-10
|
No data
|
WILLOUGHBY AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb and sidewalk installed
|
2024-08-09
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in compliance at this time
|
2024-08-09
|
No data
|
MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP IN COMPLIANCE
|
2024-08-09
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP appears in compliance at this time
|
2024-08-08
|
No data
|
32 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
122' x 30' area milled 3"
|
2024-08-08
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
30' x 21' area milled 3"
|
2024-08-08
|
No data
|
39 AVENUE, FROM STREET 32 STREET TO STREET HONEYWELL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
107' x 26' area milled 3"
|
2024-08-08
|
No data
|
39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
110' x 20' area milled 3"
|
2024-08-07
|
No data
|
VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb at corner property of Marcy in compliance
|
2024-08-07
|
No data
|
GRAND AVENUE, FROM STREET DEAN STREET TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp pedestrian walk found
|
2024-08-07
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 8/7/24.
|
2024-08-07
|
No data
|
ALBEMARLE ROAD, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVE ST DONE .. IN COMPLIANCE
|
2024-08-07
|
No data
|
ALBEMARLE ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP DONE ON SEGMENT .. IN COMPLIANCE
|
2024-08-07
|
No data
|
BERGEN STREET, FROM STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner quadrant ( unable to measure and collect due to rain .
|
2024-08-07
|
No data
|
95 AVENUE, FROM STREET 148 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant are functional and accessible. Unable to measure at this time due to rain. We’ll measure at a later date.
|
2024-08-06
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
NOV: Re-inspection passed. Permittee has obtain permit #Q042024183A50 for ped ramp.
|
2024-08-06
|
No data
|
SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Arrived for bpp inspection
|
2024-08-06
|
No data
|
PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp pedestrian walk found on sidewalk
|
2024-08-05
|
No data
|
EAST 179 STREET, FROM STREET HONEYWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant are ADA. Measured in Prism on 8/5/24.
|
2024-08-05
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are Ada compliant, ramps was measured and collected in prism on 8/5/24.
|
2024-08-04
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner quadrant is ADA compliant. Measured and collected in Prism on 7/6/23.
|
2024-08-04
|
No data
|
HOPE STREET, FROM STREET KEAP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 2/20/23.
|
2024-08-04
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/29/23.
|
2024-08-02
|
No data
|
BERGEN STREET, FROM STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site roadway intersection paved half+5’ in compliance with BPP requirements for new building 948
|
2024-08-02
|
No data
|
FRANKLIN AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site roadway paved half+5’ in compliance with BPP requirements for new building 948
|
2024-08-02
|
No data
|
BERGEN STREET, FROM STREET BEDFORD AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site with roadway milled half+5’ in compliance with bpp specifications for new building 948 bergan st
|
2024-07-31
|
No data
|
LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started. No work done . No inspection found at this time.
|
2024-07-31
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started. No work done. No inspection found at this time.
|
2024-07-31
|
No data
|
ST JOHN'S PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 557 St John’s PlacePermit: B012024212C30Width of Roadway: 33’Width of milled area: 22’Length of milled area: 29’Depth of milled area:3”
|
2024-07-30
|
No data
|
EAST 116 STREET, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done on the roadway, permit still active.
|
2024-07-30
|
No data
|
TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance
|
2024-07-29
|
No data
|
GREENE AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done
|
2024-07-27
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp within the SW1 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 7/27/24.
|
2024-07-25
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23.
|
2024-07-25
|
No data
|
BERGEN STREET, FROM STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
SE corner quad is in compliance new corner quad construction. No blocked construction at this time
|
2024-07-25
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant due to roadway slopes. Contractor has not yet done BPP. Measured and collected in prism on 6/6/24.
|
2024-07-24
|
No data
|
YORK STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed on the sidewalk IFO #218
|
2024-07-24
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant due to roadway slopes. Contractor has not yet done BPP. Measured and collected in prism on 6/6/24.
|
2024-07-23
|
No data
|
PARK AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started at time of inspection
|
2024-07-23
|
No data
|
39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition was not repaired but the CAR will be closed and the permittee placed on hold until they correct the condition as per DOT specifications.
|
2024-07-23
|
No data
|
EAST 179 STREET, FROM STREET HONEYWELL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No new ped ramp work started at time of inspection
|
2024-07-21
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-07-20
|
No data
|
39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent failed to restore roadway adjacent to new curb installed at 39th Avenue between 31st Street & 32nd Street. The respondent was notified by CAR #20244580021 on 6/6/2024 but condition remains
|
2024-07-20
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints sealed, in compliance
|
2024-07-20
|
No data
|
CONOVER STREET, FROM STREET DIKEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The intersection has been repaved and incompliance.
|
2024-07-20
|
No data
|
FAIRVIEW AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
• Curb to Curb width: 30 Feet • Milled area: 40'x20' • Depth of milled area: 3 inches • ½ +5’ milled: Yes • Waiver:
|
2024-07-19
|
No data
|
50 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk/curb reset for property in compliance
|
2024-07-19
|
No data
|
EAST 116 STREET, FROM STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 Corner quadrant are Ada compliant, ramps was measured and collected in prism on 7/19/24.
|
2024-07-19
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done on the roadway, permit still active.
|
2024-07-18
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW corner quadrant was found to be ADA compliant. Missing crosswalk lane markings on Queens Blvd ramp. Measured and collected in Prism on 5/17/24.
|
2024-07-18
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sunken portion of pavement key has been corrected in the SW corner quadrant. Will pass this one out and re issue CAR due to missing crosswalk lane markings.
|
2024-07-17
|
No data
|
EAST 10 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2024-07-17
|
No data
|
FULTON STREET, FROM STREET NEW JERSEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA compliant due to excessive curb reveal. Measured & collected in Prism on 6/26/24. Added photos with roadway paved Now ADA complaint 7/17/24.
|
2024-07-17
|
No data
|
60 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway was milled and paved in front of the new building. All roadway markings were restored.
|
2024-07-16
|
No data
|
FULTON STREET, FROM STREET NEW JERSEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NW2 corner found not to be ADA compliant due to excessive roadway and curb reveal. Measured & collected in Prism on 6/26/24. Added photos after roadway paved now ADA complaint 7/16/24.
|
2024-07-16
|
No data
|
LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel curb is installed
|
2024-07-15
|
No data
|
95 AVENUE, FROM STREET 148 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant are functional and accessible, unable to measure at this time due to active construction within the area.
|
2024-07-15
|
No data
|
EAST 163 STREET, FROM STREET SHERIDAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 Corner quadrant are Ada compliant, Ramps was measured and collected in prism on 7/15/24.
|
2024-07-13
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant are non Ada compliant. Measured and collected in prism on 7/13/24. No scoring done on site.
|
2024-07-12
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 30’Width Milled: 20’Length Milled: 116’3Depth Milled: 3”
|
2024-07-12
|
No data
|
BOERUM STREET, FROM STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 7/12/24.
|
2024-07-12
|
No data
|
MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 55’Width Milled: 33’Length Milled: 40’Depth Milled: 3”
|
2024-07-12
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 55’Width Milled: 33’Length Milled: 23’Depth 3”
|
2024-07-11
|
No data
|
JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED BY BPP
|
2024-07-11
|
No data
|
CHRYSTIE STREET, FROM STREET DELANCEY STREET TO STREET RIVINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a BPP Restoration.
|
2024-07-11
|
No data
|
BUSHWICK AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 7/11/24.
|
2024-07-11
|
No data
|
BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED BY BPP
|
2024-07-09
|
No data
|
WEST 125 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NOV issued for failure to comply with terms and conditions of DOT permit.
|
2024-07-07
|
No data
|
COOPER AVENUE, FROM STREET 72 PLACE TO STREET 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
installed new curb expansion joints and sealer applied.
|
2024-07-05
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 7/6/23.
|
2024-07-05
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer permit B042023164A11 on file and ramps found to be Ada compliant
|
2024-07-04
|
No data
|
FULTON STREET, FROM STREET NEW JERSEY AVENUE TO STREET VERMONT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2024-07-04
|
No data
|
ATLANTIC AVENUE, FROM STREET MILLER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
INTERSECTION PAVED BY BPP
|
2024-07-02
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the SW corner quadrant is ADA compliant. Landing area was corrected. Updated Prism on 4/10/23.
|
2024-07-02
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner found to be ADA compliant. Ramps was previously measured & collected in Prism on 12/6/22.
|
2024-07-01
|
No data
|
ATLANTIC AVENUE, FROM STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started.
|
2024-07-01
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the NW2 corner quadrant Ada compliant. Ramp was previously measured and collected in prism on 1/25/23.
|
2024-07-01
|
No data
|
NORTH 1 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
completed ramps within the NW2 corner quadrant are ada compliant. Previously Measured and collected in prism on 4.30.23.
|
2024-06-30
|
No data
|
CLERMONT AVENUE, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-06-30
|
No data
|
VANDERBILT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2024-06-30
|
No data
|
PARK AVENUE, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-06-28
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23.
|
2024-06-26
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within NW2 corner quadrant Ada compliant. Previously Measured and collected in prism on 6/8/24
|
2024-06-26
|
No data
|
VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failed to provide a protected ped walkway
|
2024-06-26
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No water filled barriers in r.w
|
2024-06-26
|
No data
|
FULTON STREET, FROM STREET NEW JERSEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed single ramp in the NW2 corner found not to be ADA compliant due to excessive roadway and curb reveal. Measured & collected in Prism on 6/26/24.
|
2024-06-26
|
No data
|
ALBEMARLE ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACE CURB INSTALLED .. IN COMPLIANCE
|
2024-06-25
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are ADA compliant. Previously measured and collected in Prism on 2/6/23 & update on 4/10/23.
|
2024-06-25
|
No data
|
EAST 163 STREET, FROM STREET SHERIDAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit, no new ped ramp work started at time of inspection
|
2024-06-24
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 7/19/23.newer permit #B042023164A12 on file.
|
2024-06-24
|
No data
|
METROPOLITAN AVENUE, FROM STREET BUSHWICK AVENUE TO STREET HUMBOLDT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival with roadway milled in compliance with BPP specifications half+5’ for new building 9 Bushwick Ave.
|
2024-06-24
|
No data
|
BUSHWICK AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival with roadway milled in compliance with BPP specifications half+5’ for new building 9 Bushwick Ave.
|
2024-06-24
|
No data
|
BUSHWICK AVENUE, FROM STREET DEVOE STREET TO STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival with roadway milled in compliance with BPP specifications half+5’ for new building 9 Bushwick Ave.
|
2024-06-23
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started at the time of inspection, scaffolding in quadrant.
|
2024-06-23
|
No data
|
ATLANTIC AVENUE, FROM STREET JEROME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single tangent ramp within the SW1 corner quadrant is Ada compliant. Previously Measure and collected in prism on 4/1/24.
|
2024-06-22
|
No data
|
WYONA STREET, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed, expansion joints have been sealed
|
2024-06-22
|
No data
|
WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb in place
|
2024-06-22
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New curb in compliance
|
2024-06-21
|
No data
|
NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in place at time of inspection.
|
2024-06-20
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/11/24.
|
2024-06-18
|
No data
|
16 AVENUE, FROM STREET 46 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NW2 corner quadrant are non Ada compliant, Ramps was previously measured and collected in prism on 10/14/21.
|
2024-06-17
|
No data
|
BOERUM STREET, FROM STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within SE4 corner quadrant are Ada compliant. Measured and collected in prism on 6/17/24.
|
2024-06-16
|
No data
|
CLERMONT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-06-15
|
No data
|
EAST 230 STREET, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2024-06-15
|
No data
|
EAST 223 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in place
|
2024-06-14
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed a sidewalk flag restoration with unsealed expansion joints. Respondent failed to seal expansion joints upon completion of restoration. CAR # 20246620074 issued 3/30/24 Respondent ID by cited permit.
|
2024-06-14
|
No data
|
60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for property in compliance
|
2024-06-13
|
No data
|
VYSE AVENUE, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Portion of roadway found newly repaved for new building, BPP in place
|
2024-06-12
|
No data
|
EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. No Corrective Action Request. Permit expired.
|
2024-06-11
|
No data
|
GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2 +5 perm restoration sealed IFO property #57.
|
2024-06-11
|
No data
|
BERGEN AVENUE, FROM STREET EAST 149 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done on the roadway, permit still active.
|
2024-06-11
|
No data
|
WESTCHESTER AVENUE, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done on the roadway, permit still active.
|
2024-06-11
|
No data
|
BROOK AVENUE, FROM STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done on the roadway, permit still active.
|
2024-06-11
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant are non Ada compliant. Measure and collected in prism on 6/11/24. No tiff on file roadway counter slope is excessive.
|
2024-06-11
|
No data
|
BROADWAY, FROM STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/11/24. Permittee must remove concrete restoration and install a pave key.
|
2024-06-11
|
No data
|
EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are ADA compliant. Measured and collected in Prism on 6/11/24.
|
2024-06-11
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 139 Franklin avenue Permit: B012024162B51Width of Roadway: 30’Width of milled area: 20’Length of milled area: 34’Depth of milled area: 3”
|
2024-06-11
|
No data
|
BERGEN AVENUE, FROM STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done on the roadway, permit still active.
|
2024-06-10
|
No data
|
TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 121 Taaffe Place Permit: B012024161A18Width of Roadway: 35’Width of milled area: 23’Length of milled area: 35’Depth of milled area:3’
|
2024-06-10
|
No data
|
METROPOLITAN AVENUE, FROM STREET BUSHWICK AVENUE TO STREET ORIENT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED, pass
|
2024-06-10
|
No data
|
43 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk/curb reset for property in compliance
|
2024-06-10
|
No data
|
BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb/sidewalk reset for corner property #2177 60 Street
|
2024-06-10
|
No data
|
BOLTON AVENUE, FROM STREET LACOMBE AVENUE TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Upon my arrival no orange barricades found at this time, foreman Nelson & Central concrete crew on site for sidewalk repair. In compliance
|
2024-06-10
|
No data
|
ATLANTIC AVENUE, FROM STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 6/10/24. No scoring done at the time of inspection.
|
2024-06-09
|
No data
|
VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-06-09
|
No data
|
JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED AND SEALED
|
2024-06-09
|
No data
|
PARK AVENUE, FROM STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-06-09
|
No data
|
MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-06-08
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within NW2 corner quadrant Ada compliant. Measured and collected in prism on 6/8/24
|
2024-06-06
|
No data
|
39 AVENUE, FROM STREET 31 STREET TO STREET 32 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
THE ROADWAY ASPHALT ADJACENT TO THE NEW CURB INSTALLED IS BROKEN / CRACK DOWN 3 INCHES THE ENTIRE ROADWAY AREA ADJACENT TO THE NEW CURB NEEDS TO BE MILLED AND PAVED
|
2024-06-06
|
No data
|
32 STREET, FROM STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant due to roadway slopes. Contractor has not yet done BPP. Measured and collected in prism on 6/6/24.
|
2024-06-05
|
No data
|
NEW HAVEN AVENUE, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paving complete
|
2024-06-04
|
No data
|
STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp paved in compliance
|
2024-05-30
|
No data
|
SAXON AVENUE, FROM STREET BEND TO STREET VAN CORTLANDT PARK SOUTH
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bryan foreman on site has Stip# 1/2+5'. BPP 50''x20''x3'' I/F/O 3991 Saxon Ave.
|
2024-05-29
|
No data
|
ARCHER AVENUE, FROM STREET GUY R BREWER BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP milled area completed and acceptable. • Curb to Curb width – 70• Milled area – 38’• Depth of milled area – 3’’
|
2024-05-29
|
No data
|
EAST 10 STREET, FROM STREET CATON AVENUE TO STREET CHURCH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Ped walkway in the parking lane
|
2024-05-29
|
No data
|
EAST 203 STREET, FROM STREET BRIGGS AVENUE TO STREET VALENTINE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Has half the s/w with concrete s/w flag. Block off with steel gates, port-o-sans on the s/w.
|
2024-05-29
|
No data
|
GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant was found to be non Ada compliant. No scoring. Measured and collected in prism on 3/8/24. Active construction work is going on at this time.
|
2024-05-29
|
No data
|
ARCHER AVENUE, FROM STREET 165 STREET TO STREET GUY R BREWER BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP milled area completed and acceptable. • Curb to Curb width – 65’• Milled area – 37’5’’• Depth of milled area – 3’’
|
2024-05-29
|
No data
|
GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP milled area completed and acceptable. • Curb to Curb width – 40• Milled area – 25’• Depth of milled area – 3’’
|
2024-05-29
|
No data
|
WEST FARMS ROAD, FROM STREET CROSS BRONX EXPWY NB ET 4 A TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New curb work in progress
|
2024-05-28
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant are ADA compliant. Previously measured and collected in Prism on 7/6/23.
|
2024-05-28
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION INTERSECTION IS MILLED 25FT X 20FT WITH A DEPTH OF 4 INCHES
|
2024-05-28
|
No data
|
BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY IS CURRENTLY MILLED 100FT X 20FT WITH DEPTH 4 INCHES
|
2024-05-28
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY IS CURRENTLY MILLED 228FT X 30FT WITH A DEPTH OF 4 INCHES
|
2024-05-28
|
No data
|
ATLANTIC AVENUE, FROM STREET JEROME STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION INTERSECTION IS CURRENTLY MILLED 25FT X 20FT WITH A DEPTH 4 INCHES
|
2024-05-28
|
No data
|
JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY IS CURRENTLY MILLED 125FT X 20FT WITH A DEPTH OF 4 INCHES
|
2024-05-22
|
No data
|
PARK AVENUE, FROM STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner is functional & accessible but not ADA compliant. Measured and collected in prism on 5/22/24. Curb reveal fixed.
|
2024-05-22
|
No data
|
BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed, expasnsion joints sealed
|
2024-05-22
|
No data
|
NORTH 1 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent within SE4 corner quadrant are ADA compliant. Measured and collected on 5/22/24.
|
2024-05-21
|
No data
|
SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed, expansion joints sealed
|
2024-05-21
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee failed to correct excessive ramp running slope in the NE3 corner. M&C in Prism on 5/2/23.
|
2024-05-20
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer permit B042023152A24 and remarks on file
|
2024-05-20
|
No data
|
NORTH 1 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps within the NW2 corner quadrant are ada compliant. Measured and collected in prism on 4.30.23. Newer permit B042023152A26 on file
|
2024-05-20
|
No data
|
NEW MONTROSE AVENUE, FROM STREET BROADWAY TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb installed
|
2024-05-19
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found to be ADA compliant. M&C in Prism on 10/13/23
|
2024-05-19
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single tangent in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 6/15/23.
|
2024-05-17
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractor restored sunken portion of pavement key in the SW corner quadrant. Awaiting NOV rejection to issue new CAR for roadway pavement crosswalk lane markings. Prism updated on 5/27/24.
|
2024-05-16
|
No data
|
MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2024-05-14
|
No data
|
LORIMER STREET, FROM STREET BOERUM STREET TO STREET MC KIBBIN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb is in compliance IFO #28 boerum
|
2024-05-14
|
No data
|
OCEAN PARKWAY, FROM STREET LAWRENCE AVENUE TO STREET PARKVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for property in compliance
|
2024-05-13
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 3/8/24. Newly permit #B042023240A07 on file.
|
2024-05-13
|
No data
|
LENOX ROAD, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site roadway milled ifo property 45 half+5’ in compliance with BPP
|
2024-05-13
|
No data
|
GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found roadway repaved. No Corrective Action Request. Permit expired.
|
2024-05-11
|
No data
|
BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED INSTALLED
|
2024-05-11
|
No data
|
CROPSEY AVENUE, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints have been sealed and 2X4 around tree pit removed.
|
2024-05-11
|
No data
|
60 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb installed, in front of 1271 60 Street.
|
2024-05-10
|
No data
|
22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2 + 5 feet of the roadway was milled and paved, pass.
|
2024-05-09
|
No data
|
ALBEMARLE ROAD, FROM STREET EAST 29 STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP in compliance for property 2915 Albemarle Rd roadway milled 1/2 +5’
|
2024-05-09
|
No data
|
NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP PASS IN COMPLIANCE FOR PROPERTY 2915 Albemarle Rd roadway milled 1/2 +5’
|
2024-05-09
|
No data
|
ALBEMARLE ROAD, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP IN COMPLIANCE FOR PROPERTY 2915 ROADWAY MILLED 1/2+5’
|
2024-05-08
|
No data
|
BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee failed to correct excessive ramp running slopes in the NE3 corner. M&C in Prism on 10/17/23.
|
2024-05-07
|
No data
|
GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple Sidewalk Flags restored with Expansion Joints sealed.
|
2024-05-07
|
No data
|
JEROME STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2024-05-06
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 7/19/23.
|
2024-05-05
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed a sidewalk flag restoration with unsealed expansion joints. Respondent failed to seal expansion joints upon completion of restoration. CAR # 20246620074 issued 3/30/24 Respondent ID by cited permit
|
2024-05-02
|
No data
|
GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed IFO property #57.
|
2024-05-02
|
No data
|
NOSTRAND AVENUE, FROM STREET ALBEMARLE ROAD TO STREET SNYDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w curb installed (steel faced)
|
2024-05-02
|
No data
|
CONEY ISLAND AVENUE, FROM STREET CHURCH AVENUE TO STREET FRIEL PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Site/Location was inspected 5/1/24. Compliance was established plastic jersey barriers on the rw sw foundation being done and proper signage
|
2024-05-02
|
No data
|
WYONA STREET, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed, expansion joints sealed
|
2024-05-01
|
No data
|
WILLOUGHBY AVENUE, FROM STREET THROOP AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2024-04-30
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the SW corner quadrant was found to be non ADA compliant due to pavement key on Queens Blvd not providing a smooth transition to walking pedestrians. Prism updated on 3/14/24.
|
2024-04-28
|
No data
|
ROGERS AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Bus lane has been painted in compliance
|
2024-04-21
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 7/5/23. After remeasuring ramps are ADA compliant.
|
2024-04-21
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer permit on file B042023164A12 with an open CAR for the SE4 corner quad.
|
2024-04-19
|
No data
|
BEDFORD AVENUE, FROM STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired. Permittee properly installed and sealed full width of the SE4 corner.
|
2024-04-19
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner quadrant are Ada compliant. Previously measured and collected in prism on 2/06/23 And re Measured on 5/8/23
|
2024-04-16
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are non ADA compliant. Ramps was previously measured on 8/19/2. Updated on 9/22/23 in Prism.
|
2024-04-12
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR has been answered. Re-measured in Prism on 4/12/24. All elements are ADA compliant.
|
2024-04-11
|
No data
|
LENOX ROAD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Before milling the width of roadway is 34’ 11” Width milled is 22’ 5" & Length milled is 59' 2” & Depth is 2.5" before reaching the concrete base. Foreman on site.
|
2024-04-10
|
No data
|
GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work not started
|
2024-04-10
|
No data
|
WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in compliance
|
2024-04-10
|
No data
|
60 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 44 feetWidth of milled area: 27 feetLength of milled area: 90 feetDepth of milled area: 3 inchesContractor is in compliance with required BPP measurements, pass.
|
2024-04-09
|
No data
|
MAIN AVENUE, FROM STREET 8 STREET TO STREET 30 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in place around corner property 924 new building.
|
2024-04-09
|
No data
|
NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw replaced.
|
2024-04-08
|
No data
|
MYRTLE AVENUE, FROM STREET BEDFORD AVENUE TO STREET SKILLMAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival with roadway milled half+5’ in compliance with bpp for NB 676 Myrtle
|
2024-04-08
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA complaint. M&C in Prism on 7/6/23. Inspector will be returning to location to re issue C.A.R
|
2024-04-06
|
No data
|
89 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Restoration resurfaced by excavated open sewer trench.
|
2024-04-06
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 2/22/23. Newer permit on file B042023006A05
|
2024-04-06
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done
|
2024-04-04
|
No data
|
EAST 116 STREET, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No new ped ramp work started at time of inspection
|
2024-04-04
|
No data
|
PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed & sealed
|
2024-04-02
|
No data
|
MAPLE STREET, FROM STREET EAST 48 STREET TO STREET UTICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full roadway with:30’0Cut size:L74’0 W20’0 D0’3Pass
|
2024-04-02
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No TEMPORARY PEDESTRIAN WALK at the time of inspection.
|
2024-04-02
|
No data
|
VERMONT STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in place and in compliance
|
2024-04-01
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work started but corner quadrant is blocked off with truck and active work being done.
|
2024-04-01
|
No data
|
RUTLEDGE STREET, FROM STREET BEDFORD AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb and sidewalk installed ifo 99 in compliance
|
2024-04-01
|
No data
|
ATLANTIC AVENUE, FROM STREET JEROME STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single tangent ramp curing in the SE4 corner quadrant at the time of inspection.
|
2024-03-31
|
No data
|
NORTH 6 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found new granite curb installed, Permit expired.
|
2024-03-30
|
No data
|
10 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP.
|
2024-03-30
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS NOT SEALED
|
2024-03-29
|
No data
|
MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE NEW PERMIT ON FILE
|
2024-03-28
|
No data
|
CONOVER STREET, FROM STREET DIKEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 found to be ADA compliant. Measured & collected in Prism.
|
2024-03-28
|
No data
|
EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind
|
2024-03-28
|
No data
|
ALBEMARLE ROAD, FROM STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner are functional & accessible. Unable to measure due to weather conditions (rain) We’ll return at a later date.
|
2024-03-28
|
No data
|
36 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site starting to mill roadway. Measurements in compliance. Will return when roadway is fully milled for photos.
|
2024-03-26
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Crew on site making area safe.
|
2024-03-26
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The above respondent was doing sidewalk repairs in front of 1638 park avenue and working on the corner quadrant opposite 1638 park avenue. Respondent does not have any valid DOT permits on file.
|
2024-03-25
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1638 park ave patched up sidewalk work at curb where pedestrian crossing is cracking not flush with surrounding area.
|
2024-03-25
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Sidewalk at pedestrian crossing has patched up concrete cracking up not flush with surrounding area creating a trip hazard
|
2024-03-25
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent failed to repair broken and cracked concrete not flush with surrounding area.
|
2024-03-24
|
No data
|
NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in compliance
|
2024-03-23
|
No data
|
BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Steel faced Curb in place and in compliance
|
2024-03-22
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONCRETE CURB INSTALLED
|
2024-03-22
|
No data
|
BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP installed
|
2024-03-22
|
No data
|
DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset OPP property #142.
|
2024-03-22
|
No data
|
GROVE STREET, FROM STREET BEND TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 57 Grove StreetPermit: B012024082A08Width of Roadway: 29ft 6inWidth of milled area: 19ft 8inLength of milled area: 50ft 2in Depth of milled area: 3in down
|
2024-03-20
|
No data
|
CROPSEY AVENUE, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly installed sidewalk flags need to be sealed and wooden 2x4 around tree pits needs to be removed.
|
2024-03-18
|
No data
|
NEW MONTROSE AVENUE, FROM STREET BROADWAY TO STREET MONTROSE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site milling RW
|
2024-03-16
|
No data
|
BARBEY STREET, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the full width of the sidewalk closed with no temporary pedestrian walkway. Respondent failed to maintain a 5 foot clear protected walkway in the roadway. Respondent ID by cited permit.
|
2024-03-14
|
No data
|
BOERUM STREET, FROM STREET BROADWAY TO STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TEMPORARY PEDESTRIAN WALK, pass
|
2024-03-14
|
No data
|
ATLANTIC AVENUE, FROM STREET BARBEY STREET TO STREET JEROME STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED, pass
|
2024-03-14
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE corner quadrant was found to be ADA compliant. Measured and collected in Prism on 3/14/24.
|
2024-03-13
|
No data
|
PARK AVENUE, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New Sidewalk and curb installed the new building 58 Vanderbilt.
|
2024-03-13
|
No data
|
CLERMONT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No sidewalk and curb install for new building project 58 Vanderbilt corner of Park Avenue
|
2024-03-13
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Remeasured & collected in Prism on 3/13/24.
|
2024-03-11
|
No data
|
NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance
|
2024-03-10
|
No data
|
EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance
|
2024-03-09
|
No data
|
LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2024-03-09
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner quadrant are Ada compliant. Previously Measured and collected in prism on 3/24/23. New flags done in quadrant.
|
2024-03-08
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 3/24/23.
|
2024-03-08
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 3/8/24.
|
2024-03-08
|
No data
|
GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant was found to be non Ada compliant. No scoring. Measured and collected in prism on 3/8/24.
|
2024-03-08
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was previously measured and collected in prism on 7/6/23.
|
2024-03-08
|
No data
|
ARCHER AVENUE, FROM STREET GUY R BREWER BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to permit Q042024059A66 for inspection remarks.
|
2024-03-07
|
No data
|
VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival crew on site roadway milled half+5 BPP for property 58 in compliance
|
2024-03-07
|
No data
|
NEW HAVEN AVENUE, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new concrete curb installed
|
2024-03-07
|
No data
|
PARK AVENUE, FROM STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site Rodeway Milled in compliance with BPP inspection half +5 feet for new building project 58 Vanderbilt Ave..
|
2024-03-07
|
No data
|
CLERMONT AVENUE, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival with Rodeway Mill, half +5 feet for BPP NB project in compliance for property 58 Vanderbilt Ave.
|
2024-03-07
|
No data
|
CLERMONT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival with roadway milled half +5’ for BPP NB project in compliance. Property 58
|
2024-03-07
|
No data
|
PARK AVENUE, FROM STREET CLERMONT AVENUE TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival roadway milled half +5’ for bpp NB project property 58 in compliance
|
2024-03-05
|
No data
|
EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant. Unable to measure and collect due to rain.
|
2024-03-04
|
No data
|
TOMPKINS AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP found done on the roadway. Permit expired.
|
2024-03-04
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 7/13/23.
|
2024-03-04
|
No data
|
STOCKTON STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP found done in the intersection.
|
2024-03-03
|
No data
|
STOCKTON STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner found to be ADA compliant. Previously Measured & collected in Prism on 2/16/24.
|
2024-03-02
|
No data
|
BOERUM STREET, FROM STREET BROADWAY TO STREET LORIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
steel face curb
|
2024-03-02
|
No data
|
BELMONT AVENUE, FROM STREET MOTHER GASTON BOULEVARD TO STREET WATKINS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
JERSEY BARRIERS STORED NO PERMIT
|
2024-03-02
|
No data
|
MOTHER GASTON BOULEVARD, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF THE SIDE WALK
|
2024-02-29
|
No data
|
BEDFORD AVENUE, FROM STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2024-02-29
|
No data
|
EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full roadway width 40ftCutL120’0 W27’0 D0’3
|
2024-02-29
|
No data
|
EAST NEW YORK AVENUE, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2024-02-28
|
No data
|
GUY R BREWER BOULEVARD, FROM STREET ARCHER AVENUE TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started
|
2024-02-28
|
No data
|
NEW HAVEN AVENUE, FROM STREET BEACH 22 STREET TO STREET GRASSMERE TERRACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
• Curb to Curb width – 29’• Milled area – 96’ x 20’• Depth of milled area – 4’’• ½ +5’ milled (yes/no) – yes• Waiver (yes/no)- no
|
2024-02-27
|
No data
|
OCEAN PARKWAY, FROM STREET LAWRENCE AVENUE TO STREET PARKVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway in compliance with the required measurements, BPP inspection pass.
|
2024-02-25
|
No data
|
POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONCRETE CURB INSTALLED
|
2024-02-24
|
No data
|
CROPSEY AVENUE, FROM STREET BAY 31 STREET TO STREET BAY 32 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed respondent has Jersey barriers on the roadway and failed to fill barriers with water. Respondent violated stipulation 014 THE WALKWAY MUST MEET NYCDOT SPECIFICATIONS AND MUST BE PROTECTED BY TIMBER BARRIER,WATER-FILLED BARRIER.
|
2024-02-23
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Previously measured in prism on 6/16/22 updated on 1/17/23. second ramp on van sinderen was installed by MTA,GC only installed ramp on Livonia
|
2024-02-22
|
No data
|
49 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in front of 5-22.
|
2024-02-21
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner quadrant are non ADA compliant. Previously measured and collected in Prism on 4/07/23.
|
2024-02-21
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Remeasured & collected in Prism on 2/22/24. Open CAr on permit # B042023116A18 for Ramp Running slope
|
2024-02-21
|
No data
|
ANTHONY AVENUE, FROM STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant. Unable to measure and collect due to active roadway construction and jersey barriers blocking corner quadrant.
|
2024-02-21
|
No data
|
SHERIDAN AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp passed (1/2 + 5)
|
2024-02-20
|
No data
|
8 STREET, FROM STREET MAIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp within the NE3 corner quadrant was found to be ADA compliant. Measured in prism on 12/2/2022.
|
2024-02-19
|
No data
|
GRAHAM AVENUE, FROM STREET VARET STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit expired. No new ped ramp work started at time of inspection
|
2024-02-19
|
No data
|
POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2024-02-18
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2024-02-16
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Asphalt repairs where the markings are missing were done by the electricity/Plumbing company LLG PLUMBING,HEATING,TRIUMPH CONSTRUCTION, JT. VENT., LLC
|
2024-02-16
|
No data
|
GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk in place at time of inspection.
|
2024-02-16
|
No data
|
BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 1/24/23
|
2024-02-16
|
No data
|
CLERMONT AVENUE, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are ADA compliant. Measured and collected in Prism on 2/16/24.
|
2024-02-16
|
No data
|
STOCKTON STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed single ramp in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 2/16/24.
|
2024-02-16
|
No data
|
SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONCRETE CURB INSTALLED
|
2024-02-11
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED AND SEALED
|
2024-02-11
|
No data
|
VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2024-02-09
|
No data
|
VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS HAVE BEEN SEALED
|
2024-02-08
|
No data
|
ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB REPLACED .. IN COMPLIANCE
|
2024-02-07
|
No data
|
STOCKTON STREET, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival roadway milled half +5’ in compliance for new building 88 Tompkins Av
|
2024-02-07
|
No data
|
TOMPKINS AVENUE, FROM STREET MYRTLE AVENUE TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival roadway milled half +5’ in compliance for new building 88 Tompkins Av
|
2024-02-07
|
No data
|
STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site upon arrival roadway milled half +5’ in compliance for new building 88 Tompkins Av
|
2024-02-05
|
No data
|
CLERMONT AVENUE, FROM STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE corner quadrant. Unable to measure and collect due to active BPP construction at time of inspection.
|
2024-02-04
|
No data
|
BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
concrete curb installed
|
2024-02-03
|
No data
|
GRAND AVENUE, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed & sealed
|
2024-02-03
|
No data
|
PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed & sealed
|
2024-02-02
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner quadrant was found to be ADA compliant. Only the ramp on Van Sinderen was upgraded and remeasured to correct excessive slopes and change ramp location. Measured & collected in Prism on 12/29/22.
|
2024-02-02
|
No data
|
ST JOHNS PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2024-02-01
|
No data
|
COOPER AVENUE, FROM STREET 72 PLACE TO STREET 73 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Milled area: 36'08" x 20'07". Crew on site to begin paving.
|
2024-01-31
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner quadrant is ADA compliant. Measured and collected in Prism on 7/6/23.
|
2024-01-31
|
No data
|
HOPE STREET, FROM STREET KEAP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 2/20/23.
|
2024-01-31
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/29/23.
|
2024-01-31
|
No data
|
FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found to be ADA compliant. Previously measured & collected in Prism on 3/16/23.
|
2024-01-29
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the NE3 corner quadrant Ada compliant. Ramp was measured and collected in prism on 5/10/23
|
2024-01-29
|
No data
|
49 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was recently done. Permit expired.
|
2024-01-29
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant were reconstructed. ADA compliant. Re-measured and collected in Prism on 1/29/24.
|
2024-01-26
|
No data
|
60 STREET, FROM STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in SW1 corner are functional & accessible. Unable to measure due to weather conditions (rain). We’ll measure & reinspect at a later date.
|
2024-01-25
|
No data
|
PARK AVENUE, FROM STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Exp permit. Newly completed tangent ramps in the NW2 corner is functional & accessible but not ADA compliant due to excessive curb reveal. We’ll measure & reinspect at a later date due to weather conditions (rain)
|
2024-01-24
|
No data
|
MILLER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave st conducted.. in compliance
|
2024-01-24
|
No data
|
STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel faced curb installed for new building 88 tompkins
|
2024-01-23
|
No data
|
ANTHONY AVENUE, FROM STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new Ped ramp work done in the NE3 corner quadrant permit still active.m
|
2024-01-23
|
No data
|
BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 1/23/24.
|
2024-01-22
|
No data
|
EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new Ped ramps work done in the SE4 corner quadrant permit expired newer permit #X042024022A10 on file.
|
2024-01-22
|
No data
|
EAST FORDHAM ROAD, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crews on site in the SE4 corner quadrant permit still active.
|
2024-01-22
|
No data
|
255 STREET, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP in front of 38-11 completed and acceptable. curb to curb - 29' 10", milled - 20' 10" x 59' 6", depth - 3".
|
2024-01-20
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permittee correct defects. Ramp on Livonia was reconstructed and remeasured in Prim and found to be ADA compliant. Newer permit B042022340A03 on file
|
2024-01-19
|
No data
|
WOODWARD AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVE STREET-W/ ENGINEERING & INSP -PERM ROADWAY
|
2024-01-18
|
No data
|
EAST 230 STREET, FROM STREET CARPENTER AVENUE TO STREET LOWERRE PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk installed. Expansion joints need to be sealed.
|
2024-01-18
|
No data
|
NOSTRAND AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel face) found to be in compliance
|
2024-01-17
|
No data
|
STOCKTON STREET, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Side walk is clear at this time
|
2024-01-16
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found resurfaced. Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Only the ramp on Van Sinderen was upgraded and remeasured to correct excessive slopes and change ramp location. Measured & collected in Prism on 12/29/22.
|
2024-01-15
|
No data
|
13 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
5 digit codes should be placed on signage on back of sign ( once in front and Two in back)
|
2024-01-11
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23
|
2024-01-11
|
No data
|
49 AVENUE, FROM STREET 5 STREET TO STREET VERNON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
B.P.P. milling in compliance within roadway at 5-22 49th Avenue • Curb to Curb width – 29'6" • Milled area – 107' x 20' • Depth of milled area – 3"• ½ +5’ milled (yes) • Waiver (no)-
|
2024-01-10
|
No data
|
LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full Roadway Width 35'0Cut L64'0 W22'6 D0'3
|
2024-01-10
|
No data
|
PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the driving lane IFO property #529.
|
2024-01-09
|
No data
|
EAST 28 STREET, FROM STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed Single tangent ramp in the SE4 corner quadrant is ada compliant. Measured and collected in prism on 3/27/23.
|
2024-01-05
|
No data
|
BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Use/opening of street without DOT permit
|
2024-01-04
|
No data
|
BEDFORD AVENUE, FROM STREET CATON AVENUE TO STREET MARTENSE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 140’x27’ area of roadway to a depth of 3” in compliance, Roadway is 43’ from curb to curb
|
2024-01-04
|
No data
|
BEDFORD AVENUE, FROM STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 33’x27’ area of roadway to a depth of 3”, Intersection is 59’x50’ in diameter
|
2024-01-04
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 65’x33’ area of roadway to a depth of 3” in compliance, Roadway is 55’ from curb to curb
|
2024-01-04
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Ramps were previously upgraded by OLIVEIRA CONTRACTING under contract HWPR19M
|
2024-01-02
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Refer to permit #M012023334A22 on file.
|
2023-12-31
|
No data
|
VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2023-12-30
|
No data
|
KINGSTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2 + 5 perm restoration in the driving lane IFO property #35.
|
2023-12-29
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Respondent failed to notify NYC DOT HIQA borough ( Manhattan ) office within four hours prior to paving. As per stipulation 1/2+ 5. And roadway was paved,
|
2023-12-29
|
No data
|
43 STREET, FROM STREET 12 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done for property #1140 43 street in compliance. Width of roadway 30ft. Width of milled area 20ft. Length of milled area 47ft. Depth of milled area 3in.
|
2023-12-28
|
No data
|
ATLANTIC AVENUE, FROM STREET MILLER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: Atlantic Ave & Miller Ave Permit: B012023360B50 Width of Roadway: 40’ Width of milled area: 25’ Length of milled area: 28’ Depth of milled area:3”
|
2023-12-28
|
No data
|
ATLANTIC AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: Atlantic Ave/Miller Ave & Van Siclen Ave Permit: B012023330B48 Width of Roadway: 40’ Width of milled area: 25’ Length of milled area: 102’ Depth of milled area:3”
|
2023-12-28
|
No data
|
MILLER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: Miller Ave / Atlantic Ave & Fulton Street Permit: B012023330B49 Width of Roadway: 30’ Width of milled area: 15’ Length of milled area: 114’ Depth of milled area:3”
|
2023-12-27
|
No data
|
4 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
B.P.P. restoration found resurfaced
|
2023-12-27
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner quadrant is non ADA compliant. Permittee constructed new landing area with higher dimensions. Previously measured and collected in Prism on 2/6/23.
|
2023-12-27
|
No data
|
MILLER AVENUE, FROM STREET ATLANTIC AVENUE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor had street closed, instructed him to open the roadway which was done immediately.
|
2023-12-26
|
No data
|
GRAHAM AVENUE, FROM STREET COOK STREET TO STREET VARET STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb reset
|
2023-12-26
|
No data
|
50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced.
|
2023-12-22
|
No data
|
PRESIDENT STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
W of RDWY 30ft, W milled 20ft, L mille3d 175ft, D3-inches
|
2023-12-22
|
No data
|
EAST 79 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #323 Steel faced curb 30 linear ft free of defects and in compliance.
|
2023-12-20
|
No data
|
VERNON AVENUE, FROM STREET LEWIS AVENUE TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY CURB TO CURB IS 33FT 11IN. MILLED ROAD IS 103FT X 22FT WITH A DEPTH OF 3 1/2 INCHES
|
2023-12-19
|
No data
|
ROGERS AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please restore “Red” Bus lane markings to Bus lane.
|
2023-12-17
|
No data
|
VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk is in compliance
|
2023-12-16
|
No data
|
NORTH 6 STREET, FROM STREET DRIGGS AVENUE TO STREET ROEBLING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk curb new
|
2023-12-12
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance
|
2023-12-12
|
No data
|
WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPLACE CURB good I/F/O 1045
|
2023-12-07
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New completed tangent ramps in the SW corner quadrant was found to be non ADA compliant due to temp concrete pavement key , curb reveal , expansion joints not sealed and sidewalk grade break not scored. M&C in Prism on 12/7/23 , Active permit.
|
2023-12-06
|
No data
|
LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced B152023265B37.
|
2023-12-04
|
No data
|
MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags in place
|
2023-12-04
|
No data
|
10 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 42 feetWidth of milled area: 26 feetLength of milled area: 90 feetDepth of milled area: 3 inchesContractor is in compliance with required BPP measurements, pass.
|
2023-11-30
|
No data
|
DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2023-11-30
|
No data
|
38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced.
|
2023-11-28
|
No data
|
59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2023-11-28
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single ramp found to be ADA compliant SE4 corner. Remeasured & collected in Prism on 11/27/23 permit # B042023206A05.
|
2023-11-27
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired. Permittee corrected ramp running slopes in the SE4 corner. M&C 7/6/23 in Prism. Newer permit B042023321A10 on file
|
2023-11-27
|
No data
|
CLARKSON AVENUE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP complete
|
2023-11-25
|
No data
|
ELM PLACE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in place
|
2023-11-22
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
NOV issued for the Respondent failed to obtain a DOT Street opening permit for having a permanent BPP Restoration in the Roadway. Permit # M012022311A55 is for a different segment and used as ID only.
|
2023-11-18
|
No data
|
89 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB INSTALLED
|
2023-11-18
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints sealed between curb and sidewalk flags
|
2023-11-17
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newer permit B042023164A12 on file
|
2023-11-17
|
No data
|
CONOVER STREET, FROM STREET DIKEMAN STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newer permit B042023165A32 on file
|
2023-11-17
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newer permit B042023177A04 on file
|
2023-11-17
|
No data
|
VANDERBILT AVENUE, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Job 1Location: 228 Vanderbilt Avenue Permit:B012023321B22Width of Roadway: 41ft 10inWidth of milled area: 26ft 1in Length of milled area: 54ft 2in Depth of milled area: 3fin down
|
2023-11-17
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newer permit B042023164A11 on file
|
2023-11-16
|
No data
|
59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full roadway width 29’0Cut L50’0 W20’0 D0’4
|
2023-11-16
|
No data
|
EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in place and in compliance
|
2023-11-16
|
No data
|
BEDFORD AVENUE, FROM STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. Measured & collected in Prism on 11/16/23.
|
2023-11-16
|
No data
|
AVENUE C, FROM STREET EAST 6 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit expired. No new ped ramp work started at time of inspection.
|
2023-11-14
|
No data
|
EAST 116 STREET, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pedestrian walk in compliance
|
2023-11-14
|
No data
|
JAMAICA AVENUE, FROM STREET 162 STREET TO STREET GUY R BREWER BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Section of sidewalk replaced with concrete.
|
2023-11-11
|
No data
|
BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done on the roadway
|
2023-11-11
|
No data
|
FRANKLIN AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed IFO property #627.
|
2023-11-11
|
No data
|
60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2023-11-11
|
No data
|
60 STREET, FROM STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2023-11-08
|
No data
|
BEDFORD AVENUE, FROM STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Intersection L55ft, W32ft. L milled 32ft, W milled 23ft.
|
2023-11-08
|
No data
|
ST JOHNS PLACE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway 33ft, W milled 23ft, L milled 130ft
|
2023-11-07
|
No data
|
BEDFORD AVENUE, FROM STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started. New permit # B042023291A35 obtained for the SW1 corner. We’ll measure on active permit when paving key is completed.
|
2023-11-06
|
No data
|
MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp paved in compliance
|
2023-11-03
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are ada compliant, Ramps was previously measured and collected in prism on 2/6/23 & update on 4/10/23. Newer permit #X042023089A08 on file.
|
2023-11-03
|
No data
|
MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No concrete curb in place
|
2023-11-01
|
No data
|
AVENUE C, FROM STREET EAST 6 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit expired. No new ped ramp work started at time of inspection
|
2023-11-01
|
No data
|
SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway repaved by BPP
|
2023-10-28
|
No data
|
KENO AVENUE, FROM STREET BEND TO STREET MARENGO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed, Curb to curb is 25’, Milled Area is 19’, Depth is 3”, 1/2 +5 completed.
|
2023-10-26
|
No data
|
TILDEN AVENUE, FROM STREET BEDFORD AVENUE TO STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in place and in compliance
|
2023-10-25
|
No data
|
60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2023-10-25
|
No data
|
BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2023-10-24
|
No data
|
43 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2023-10-24
|
No data
|
VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence on sidewalk area.
|
2023-10-23
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved half +5’ in compliance for bpp property 103
|
2023-10-23
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Intersection paved by BPP for new building project 103
|
2023-10-23
|
No data
|
89 AVENUE, FROM STREET 148 STREET TO STREET 150 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed, Curb to curb is 29’, Milled Area is 20’ 3”, Depth is 3”.
|
2023-10-21
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset
|
2023-10-21
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration ion the intersection.
|
2023-10-20
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractor excavated the SE corner quadrant after 410 permit expired. Action was taken outside of this permit , reference new non permit # QNP2023293A11 for further information.
|
2023-10-20
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Contractor has excavated portion of the SE corner without active 410 Ped Ramp permit. Corner is not functional or accessible due to barricades open excavation. Will re inspect at later date once work is completed.
|
2023-10-19
|
No data
|
VANDERBILT AVENUE, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk flags installed.
|
2023-10-17
|
No data
|
BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant are Ada compliant. Measured and collected in prism on 10/17/23.
|
2023-10-13
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Gutter flow is compliant at this time in the NE3 corner. Remeasured in Prism on 10/13/23.
|
2023-10-12
|
No data
|
NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
35x20’ down 3’ portion in roadway awaiting to be paved, foreman Lenny & crew on site & in compliance
|
2023-10-12
|
No data
|
WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Stip# 1/2+5' THE PERMITTEE IS RESPONSIBLE FOR MILLING AND PAVING 1/2 + 5 FEET OF THE ROADWAY TO A DEPTH OF 3 INCHES AS A MINIMUM RESTORATION REQUIREMENT. 17'+5' = 22'x18'x3'' Was told to sweep the trench clean. R/W (34'x18')
|
2023-10-11
|
No data
|
DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done in complianceWidth of roadway:30ftWidth of roadway milled area :20ftLength of milled area:200ftDepth of milled area :3in
|
2023-10-08
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints need to be sealed with sealer.
|
2023-10-05
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
curb reveal was made to zero. Newer permit M042023166A19 on file
|
2023-10-05
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
perm. rest. on r/w w/o permit on file.
|
2023-10-05
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed single ramp in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 7/6/23. Excessive ramp running remains.
|
2023-10-03
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
All slope was corrected & curb reveal was made to zero, plastic was removed from the DWS. Newer permit X042023206A01 on file
|
2023-10-03
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Issue resolved completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 7/5/23. After remeasuring ramps are ADA compliant.
|
2023-10-01
|
No data
|
EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk flags in compliance at this time
|
2023-10-01
|
No data
|
VERMONT STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done and in compliance
|
2023-09-30
|
No data
|
MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk expansion joints were sealed. I/F/O 2085.
|
2023-09-29
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temporary walk in roadway
|
2023-09-28
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started. No work done in the NE3 corner.
|
2023-09-28
|
No data
|
KEAP STREET, FROM STREET GRAND STREET EXTENSION TO STREET SOUTH 2 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2023-09-28
|
No data
|
KEAP STREET, FROM STREET SOUTH 2 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2023-09-27
|
No data
|
MARION AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in place
|
2023-09-27
|
No data
|
HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2023-09-23
|
No data
|
BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk and curb insta In compliance ifo property 616
|
2023-09-23
|
No data
|
SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
bpp has been paved and in compliance
|
2023-09-22
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are non Ada compliant. Ramps was previously measured on 8/19/2 updated on 9/22/23 in prism ( landing -cross running slopes,).
|
2023-09-22
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Duplicate permit on file. Action taken on newer permit # B042023240A08. M&C in Prism on 9/20/23.
|
2023-09-22
|
No data
|
BEDFORD AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO NEW SIDEWALK BLG. PAVEMENT
|
2023-09-20
|
No data
|
LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2023-09-20
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed ramps within the SW1 corner quadrant are Non Ada compliant. Measured and collected in prism on 9/20/23.
|
2023-09-20
|
No data
|
DECATUR AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in place
|
2023-09-19
|
No data
|
ELDERT STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP
|
2023-09-18
|
No data
|
MADISON STREET, FROM STREET MALCOLM X BOULEVARD TO STREET STUYVESANT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY CURB TO CURB IS 34FT. MILLED ROADWAY IS 142FT X 22FT WITHA DEPTH OF 4 INCHES
|
2023-09-18
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started. No work done in the NE3 corner.
|
2023-09-17
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb in place
|
2023-09-15
|
No data
|
21 STREET, FROM STREET 27 AVENUE TO STREET 27 ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no temp pedestrian walk found
|
2023-09-15
|
No data
|
BATHGATE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in place
|
2023-09-14
|
No data
|
65 ROAD, FROM STREET QUEENS BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedestrian ramp work started. Old existing ramps in the SE corner quadrant are accessible and non fully functional due to active building construction and scaffolding on site. Will re inspect at later date once work is completed.
|
2023-09-14
|
No data
|
ROGERS AVENUE, FROM STREET CLARKSON AVENUE TO STREET LENOX ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel curb in stand in compliance
|
2023-09-13
|
No data
|
WEST 190 STREET, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Email notification was sent
|
2023-09-11
|
No data
|
EAST 24 STREET, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 29'5Width Milled: 20'6Length Milled: 49'5Depth Milled: 3"
|
2023-09-11
|
No data
|
FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New concrete curb in place
|
2023-09-09
|
No data
|
QUEENS BOULEVARD, FROM STREET 65 ROAD TO STREET 66 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TEMPORARY PEDESTRIAN WALK, pass
|
2023-09-07
|
No data
|
QUEENS BOULEVARD, FROM STREET 65 ROAD TO STREET 66 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Not verified the building operation has proper signs posted at all location advising sidewalk close. They are directed to use the walkway. No action required at this time.
|
2023-09-07
|
No data
|
60 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pass
|
2023-09-07
|
No data
|
BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pass
|
2023-09-07
|
No data
|
60 STREET, FROM STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pass
|
2023-09-07
|
No data
|
KOSSUTH PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Cement face curb installed
|
2023-09-06
|
No data
|
10 AVENUE, FROM STREET 43 STREET TO STREET 44 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent closed the entire sidewalk without providing a PROTECTED WALKWAY IN ROADWAY.ID BY permit on file. FAILED TO comply with stipulation 014,Protected WALKWAY MUST MEET NYCDOT SPECIFICATIONS & MUST BE PROTECTED BY TIMBER.
|
2023-09-05
|
No data
|
21 STREET, FROM STREET 27 AVENUE TO STREET 27 ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
B.P.P. milling in compliance within the roadway in front of 27-16 21st Street. • Curb to Curb width – 58’6” /• Milled area – 94’(L) x 34’6”(W) /• Depth of milled area – 3” /• ½ +5’ milled (yes/no) – YES • Waiver (yes/no)- NO
|
2023-09-04
|
No data
|
22 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb repaired in front of 289 22 Street.
|
2023-08-31
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are functional and accessible. ADA compliant. Previously measured and collected in Prism on 10/5/20.
|
2023-08-29
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new work done in the NW2 Corner quadrant, permit expired, open C.A.R #20235730186 on file.
|
2023-08-28
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are Ada compliant, Ramps was previously measured and collected in prism on 7/6/23.
|
2023-08-27
|
No data
|
ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Half plus 5 done and in compliance
|
2023-08-26
|
No data
|
LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2023-08-25
|
No data
|
SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new roadway resurface for new building
|
2023-08-24
|
No data
|
MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk expansion joints must be sealed. I/F/O 2085.
|
2023-08-24
|
No data
|
WEST 190 STREET, FROM STREET DEVOE TERRACE TO STREET UNIVERSITY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New concrete s/w.
|
2023-08-24
|
No data
|
MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
53’x22’x3” portion of roadway was milled. Total roadway width is 33’. Half+5 in compliance. Paving about to begin. Kandos Paving Carlos on site.
|
2023-08-23
|
No data
|
COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in place at 285 new building corner property.
|
2023-08-23
|
No data
|
BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset IFO property #987.
|
2023-08-23
|
No data
|
EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Concrete) found in compliance
|
2023-08-22
|
No data
|
30 DRIVE, FROM STREET 21 STREET TO STREET 23 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no temp pedestrian walk found
|
2023-08-21
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramp within the SE4 corner quadrant are non Ada compliant. Previously measured and collected in prism on 7/6/23.
|
2023-08-21
|
No data
|
VERMONT STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 221 Vermont StreetPermit: B012023228C70Width of Roadway: 30’Width of milled area: 20’Length of milled area: 85’Depth of milled area:3”
|
2023-08-21
|
No data
|
MARION AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass work done
|
2023-08-20
|
No data
|
CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints has been sealed
|
2023-08-18
|
No data
|
46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 30 feetWidth of milled area: 20 feetLength of milled area: 50 feetDepth of milled area: 3 inchesIn compliance with required BPP measurements, pass.
|
2023-08-18
|
No data
|
BAY PARKWAY, FROM STREET 59 STREET TO STREET 60 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk curing at this time. In compliance.
|
2023-08-17
|
No data
|
EAST 32 STREET, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full roadway width 30’0Cut:L51’0 W 21’0 D 0’3Pass
|
2023-08-17
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps with the new construction of ramp work done on NE3 ( Grand Ave ). We’ll measure & reinspect when concrete is done curing and rescored.
|
2023-08-17
|
No data
|
TRINITY AVENUE, FROM STREET EAST 149 STREET TO STREET PONTIAC PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in place for for new building
|
2023-08-17
|
No data
|
SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed in compliance
|
2023-08-17
|
No data
|
60 STREET, FROM STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active work being done in the NW2 corner quadrant, Active permit on file.
|
2023-08-16
|
No data
|
MARION AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
On site for BPP as per BC RWilliams. Portion of roadway milled and paved 85’ length x 20’ width x 3” depth. Total roadway width is 30’, half + 5 stipulation in compliance. On site, Kandos Paving (917) 891-5252. BPP pass. I/F/O 2511.
|
2023-08-11
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Previously measured in prism on 6/16/22 updated on 1/17/23. Doesn’t apply due second ramp on van sinderen was installed by MTA,GC only installed ramp on Livonia
|
2023-08-10
|
No data
|
NORTH 11 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in compliance for property 61
|
2023-08-10
|
No data
|
NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway currently being milled by in house for paving
|
2023-08-10
|
No data
|
MARION AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAILED TO COMPLY WITH THE TERMS AND AGREEMENT OF THIS PERMIT BY VIOLATING STIPULATION 019 , RESPONDENT FAILED TO MAINTAIN A 5FT CLEAR TEMPORARY PEDESTRIAN WALKWAY IN THE ROADWAY WHILE WORKING ON THE
|
2023-08-09
|
No data
|
BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the driving lane IFO property #987.
|
2023-08-09
|
No data
|
GOLD STREET, FROM STREET WATER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in compliance for property 86
|
2023-08-09
|
No data
|
SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 482 Snediker AvenuePermit: B012023220A52Width of Roadway: 29’Width of milled area: 20’Length of milled area: 56’Depth of milled area:3’
|
2023-08-07
|
No data
|
CLARKSON AVENUE, FROM STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No ped ramp work started in the SE4 corner. Barricades around the ramps from BO work at this time. We’ll measure & reinspect when ramp is completed.
|
2023-08-05
|
No data
|
POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2023-08-04
|
No data
|
EAST 79 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP, Half of the Street + 5 feet milled for paving. Measurements from the North to the South Curbs is 55 feet. Area milled, 36’ x 32’ down 3”.
|
2023-08-03
|
No data
|
ESSEX STREET, FROM STREET FOLSOM PLACE TO STREET FULTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 190 ESSEX ST BTWN FOLSOM PL & FULTON ST Permit: B012023214C58Width of Roadway: 30’ Width of milled area: 20’Length of milled area: 60’ Depth of milled area: 3’ Foreman on site.
|
2023-08-03
|
No data
|
FAIRVIEW AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
• Curb to Curb width: 30 Feet• Milled area: 40'x20'• Depth of milled area: 3 inches• ½ +5’ milled: Yes• Waiver: No
|
2023-08-02
|
No data
|
ELDERT STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 29ft 7inWidth of milled area: 19ft 11inLength of milled area: 63ft 7in Depth of milled area: 3fin down
|
2023-08-02
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No work started. No new ped ramp work done. Excessive slope remain the SE4 corner. Previously M&C in Prism on 7/6/23.
|
2023-08-01
|
No data
|
SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ped /walk not visible
|
2023-07-31
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Exp permit. Newly completed tangent ramps in the NE3 corner found not to be ADA compliant. M&C in Prism on 6/16/23.
|
2023-07-31
|
No data
|
LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Protest Accepted. Patchwork at 726 Lincoln not 729 Lincoln Place. Protest Accepted, going forward be mindful when patching adjacent house it can become your responsibility for full flag restoration
|
2023-07-31
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA complaint. M&C in Prism on 7/6/23.
|
2023-07-31
|
No data
|
GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb in place
|
2023-07-28
|
No data
|
VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no temporary pedestrian walk found
|
2023-07-28
|
No data
|
SNEDIKER AVENUE, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED In compliance.
|
2023-07-25
|
No data
|
MOHEGAN AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in place
|
2023-07-22
|
No data
|
EAST 79 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Respondent is in violation of stipulation 013 & 047 & failed to provide adequate protection to persons and/or property at worksite. The pedestrian walkway is missing jersey barriers. The respondent was identified by permit located at #323.
|
2023-07-20
|
No data
|
CONOVER STREET, FROM STREET DIKEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 found to be ADA compliant. Measured & collected in Prism.
|
2023-07-20
|
No data
|
LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There is patch work on the sidewalk in front of residence 729 Lincoln Pl, that is unacceptable, and needs to be restored. Permit expired on 7/7/2023.
|
2023-07-19
|
No data
|
VERMONT STREET, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed in compliance
|
2023-07-19
|
No data
|
VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp in compliance
|
2023-07-19
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant are Ada compliant. Measured and collected in prism on 7/19/23.
|
2023-07-19
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single tangent ramp within NE3 corner quadrant are Ada compliant. Measured and collected in prism on 7/19/23.
|
2023-07-18
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner quadrant. Unable to measure and collect due to rain at time of inspection.
|
2023-07-18
|
No data
|
VANDERBILT AVENUE, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP in compliance
|
2023-07-17
|
No data
|
NORTH 1 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps within the NW2 corner quadrant are ada compliant. Measured and collected in prism on 4.30.23.
|
2023-07-16
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work was done. MTA upgraded corner..
|
2023-07-15
|
No data
|
REV JAMES POLITE AVENUE, FROM STREET CHISHOLM STREET TO STREET FREEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in place.
|
2023-07-14
|
No data
|
COLLEGE AVENUE, FROM STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit expired. No ped ramp work started at time of inspection.
|
2023-07-13
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 7/13/23.
|
2023-07-13
|
No data
|
FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on the sw
|
2023-07-13
|
No data
|
GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a newly installed steel face curb.
|
2023-07-12
|
No data
|
SUFFOLK STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent has restored the sidewalk in kind.
|
2023-07-12
|
No data
|
NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel faced curb installed for new sidewalk ifo property 61
|
2023-07-11
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No work started. No new ped ramp work done. Ramp conditions are the same as picture shown in the CAR. We’ll measured & reinspect when ramps are completed.
|
2023-07-08
|
No data
|
CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
All unsealed sidewalk expansion joints must be sealed and also sidewalk wood forms must be removed from curb.
|
2023-07-06
|
No data
|
CHISHOLM STREET, FROM STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant are non Ada compliant, Ramps was measured and collected in prism on 7/6/23 ( ramp running slopes, ramp cross slopes).
|
2023-07-06
|
No data
|
NORTH 11 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel faced curb installed for new sidewalk ifo No.61
|
2023-07-06
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 7/6/23.
|
2023-07-06
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed ramps within the NE3 corner quadrant are non Ada compliant. Measure and collected in prism 7/6/23.
|
2023-07-05
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 7/5/23. After remeasuring ramps are ADA compliant.
|
2023-07-03
|
No data
|
POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONCRETE CURB INSTALLED
|
2023-06-30
|
No data
|
46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb was installed in front of 1155 46 Street.
|
2023-06-29
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 6/29/23.
|
2023-06-28
|
No data
|
PROSPECT AVENUE, FROM STREET BECK STREET TO STREET EAST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway found newly paved IFO 599 for new building
|
2023-06-28
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2023-06-27
|
No data
|
LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
BPP was done and asphalt flushed to grade.
|
2023-06-26
|
No data
|
LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP COMPLETE Width Milled: 22'3Width of Roadway: 33'4Length Milled: 93'1Depth Milled: 4"
|
2023-06-26
|
No data
|
EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete sidewalk restoration found to be in compliance
|
2023-06-24
|
No data
|
PROSPECT AVENUE, FROM STREET BECK STREET TO STREET EAST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb and sidewalk of new building in compliannce
|
2023-06-24
|
No data
|
NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete sidewalk restoration found to be in compliance
|
2023-06-22
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit taken out to address CAR issues on permit B042023079A17. No work started at this time to resolve issues.
|
2023-06-21
|
No data
|
WEST 37 STREET, FROM STREET 10 AVENUE TO STREET DYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind.
|
2023-06-21
|
No data
|
SCHAEFER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete Curb to curb- 30ftLength- 38ftWidth- 21ftDepth- 3 inches
|
2023-06-20
|
No data
|
HARMAN STREET, FROM STREET WOODWARD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete. Curb to curb - 37' 7", milled - 23' 3" x 22', depth - 3".
|
2023-06-20
|
No data
|
WOODWARD AVENUE, FROM STREET HARMAN STREET TO STREET HIMROD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete. Curb to curb - 29' 9", milled - 20' 4" x 42' 4", depth - 3".
|
2023-06-20
|
No data
|
HARMAN STREET, FROM STREET FAIRVIEW AVENUE TO STREET WOODWARD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed. Curb to curb - 29' 10", milled - 20' 3" x 117' 4", depth - 3".
|
2023-06-20
|
No data
|
CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street was paved bpp work done.
|
2023-06-20
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 2/24/23. Concrete removed paving key installed.
|
2023-06-16
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quad are accessible and functional but not Ada compliant due to the roadway gutter flow(2.8%) only, on ramp 1. Measured and collected in prism on 6/16/23.
|
2023-06-16
|
No data
|
46 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
2023-06-16
|
No data
|
NORTH 1 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Roadway counter slope has been addressed and is in compliance. Completed tangent ramps within the NW2 corner quadrant are non ada compliant. Previously measured and collected in prism on 4.30.23 Newer permit B042023152A26 on file
|
2023-06-16
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per inspection on permit B042023074A04 and spot check in the SW1 corner quad, it is now in compliance. Previously measured and collected in prism on 1/25/23. Re-measured in prism on 4/30/23. Newer permit B042023074A04 on file
|
2023-06-16
|
No data
|
LINCOLN PLACE, FROM STREET NOSTRAND AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Respondent failed to comply with stipulation 014
|
2023-06-16
|
No data
|
4 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Paving check only: Roadway: 45', Paved Area 61', 1/2 +5' Yes: 28'
|
2023-06-16
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Active permit B042023152A24 on file. Issues has been addressed. Will inspect in prism on active permit.
|
2023-06-15
|
No data
|
WITHERS STREET, FROM STREET LEONARD STREET TO STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Whole street: 39ft 10in Half plus 5: 25ft Width: 25ft Down: 3in
|
2023-06-15
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single tangent in the SE4 corner found to be ADA compliant. Measured & collected in Prism on 7/15/23.
|
2023-06-15
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found not to be ADA compliant. Measured & collected in Prism on 1/25/23. ( landing cross, running slopes).
|
2023-06-15
|
No data
|
NORTH 1 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done in the NW2 Corner quadrant, Completed ramps in the NW2 corner quadrant are non ada compliant. Ramps was previously measured and collected in prism on 4.30.23
|
2023-06-15
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner found to be ADA compliant. Ramps was previously measured and collected in Prism on 12/6/22.
|
2023-06-15
|
No data
|
MEEKER AVENUE, FROM STREET LORIMER STREET TO STREET WITHERS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Whole Street: 39ft 10in Half plus 5 : 25ft Width: 249ft 5in Down: 3in
|
2023-06-14
|
No data
|
FRANKLIN AVENUE, FROM STREET BERGEN STREET TO STREET DEAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
i seen a new curb
|
2023-06-14
|
No data
|
BEDFORD AVENUE, FROM STREET DE KALB AVENUE TO STREET KOSCIUSKO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site roadway milled 31’x27’x4” full width of roadway 51’ for property 987
|
2023-06-13
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition resolved. Ramps were completed under permit B042022347A03, paving completed under permit B012023039B85. No further actions taken at this time.
|
2023-06-13
|
No data
|
KINGSTON AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled half plus 5
|
2023-06-12
|
No data
|
GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Occupancy of sidewalk as stipulated in front.
|
2023-06-12
|
No data
|
CHRYSTIE STREET, FROM STREET DELANCEY STREET TO STREET RIVINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent restored 1/2+5 of the roadway for the BPP restoration.
|
2023-06-12
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee failed to correct excessive landing cross slope in the NW2 corner. Previously Measured &Collected in Prism on 11/7/22.
|
2023-06-09
|
No data
|
NORTH 11 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Whole street: 29ft 6in Half plus 5: 20ft 5inWidth: 123ft 6in Down: 3in
|
2023-06-09
|
No data
|
NORTH 12 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Whole street: 29ft 10in Half plus 5: 20ft 2in Width: 111ft 6inDown: 3in
|
2023-06-06
|
No data
|
POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW CONCRETE CURB INSTALLED
|
2023-06-05
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newer permit on file B042023079A17 with an open CAR for the SE4 corner quad. Reference permit B042023079A17.
|
2023-06-03
|
No data
|
CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent has a Temporary pedestrian walkway in the roadway, failed to maintain 5’ clear. Walkway is obstructed by excavator parked in the walkway. Violated permit stipulation #014.
|
2023-05-31
|
No data
|
GRAND STREET, FROM STREET ELDRIDGE STREET TO STREET FORSYTH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk is occupied with construction fence.
|
2023-05-31
|
No data
|
POWELL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
STIP VIOLATION CLOSED SIDE WALK
|
2023-05-30
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Previously Measured in prism on 9/3/21.
|
2023-05-28
|
No data
|
MONTROSE AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
sealed
|
2023-05-27
|
No data
|
PROSPECT AVENUE, FROM STREET BECK STREET TO STREET EAST 150 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not started.
|
2023-05-25
|
No data
|
NEW YORK AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY CURB TO CURB IS 42FT. MILLED ROADWAY IS 58FT X 27FT WITH A DEPTH OF 3 INCHES
|
2023-05-25
|
No data
|
COLLEGE AVENUE, FROM STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No new ped ramp work started in the NW2 corner quadrant at time of inspection
|
2023-05-25
|
No data
|
MANIDA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2 plus 5 of the roadway paved
|
2023-05-24
|
No data
|
GRAND AVENUE, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspected
|
2023-05-24
|
No data
|
PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspected
|
2023-05-24
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspected
|
2023-05-24
|
No data
|
BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2+5' width of r/w paved
|
2023-05-24
|
No data
|
21 STREET, FROM STREET 31 AVENUE TO STREET 31 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced
|
2023-05-23
|
No data
|
GRAND AVENUE, FROM STREET ATLANTIC AVENUE TO STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Central concrete has an active permit on file to pave the segment & it expires on 6/15/2023
|
2023-05-23
|
No data
|
FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New building sidewalk flags I/F/O # 785.
|
2023-05-22
|
No data
|
NOSTRAND AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (Steel face) found in compliance
|
2023-05-19
|
No data
|
WITHERS STREET, FROM STREET MEEKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pedramp work is in progress….concrete is being poured. Will inspect at a later date.
|
2023-05-19
|
No data
|
WATER STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved for new building BPP
|
2023-05-19
|
No data
|
EAST 53 STREET, FROM STREET BEND TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY CURB TO CURB IS 44FT MILLED ROADWAY IS 27FT X 57FT WITH A DEPTH OF 3 INCHES
|
2023-05-19
|
No data
|
GOLD STREET, FROM STREET FRONT STREET TO STREET WATER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved for bpp
|
2023-05-18
|
No data
|
EAST 169 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O #285 corner property. Roadway milled on two sides: On E196St: Existing roadway total width 41’ of which a 80’x26’x3” portion is milled. On College Av: existing roadway total width 29’, of which a 110’x19’8”x3” is milled. BPP milling pass.
|
2023-05-13
|
No data
|
UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done i/f/o 1101
|
2023-05-12
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner quadrant are Ada compliant. Previously Measured and collected in prism on 3/24/23. New flags done in quadrant.
|
2023-05-11
|
No data
|
CONOVER STREET, FROM STREET DIKEMAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps within the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 5/11/23.
|
2023-05-11
|
No data
|
LEFFERTS AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration found in compliance
|
2023-05-10
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NW2 corner quadrant non Ada compliant, Ramp was measured and collected in prism on 5/10/23. ( curb reveal, roadway gutter flow).
|
2023-05-10
|
No data
|
EAST 28 STREET, FROM STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP has been completed
|
2023-05-09
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR has been issued on new permit X042023089A07 as per Kerry.
|
2023-05-08
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are non Ada compliant. Previously measured and collected in prism on 2/25/23
|
2023-05-05
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps in the NW2 corner found not to be ADA compliant. Measured & collected in Prism. Permittee must correct excessive cub reveal & roadway.
|
2023-05-05
|
No data
|
TILDEN AVENUE, FROM STREET BEDFORD AVENUE TO STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Drop curb (Steel face) found to be in compliance (Sears Parking lot)
|
2023-05-05
|
No data
|
BELMONT AVENUE, FROM STREET ROCKAWAY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed ramps within the NE3 corner quadrant. Will measure and collect on later date due to active work being done.
|
2023-05-05
|
No data
|
ROCKAWAY AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk being installed and sidewalk closed.
|
2023-05-04
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the SW corner quadrant is ADA compliant. Landing area was corrected. Updated Prism on 4/10/23.
|
2023-05-03
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the NW2 corner quadrant are Ada compliant. Previously Measured and collected in prism on 4/07/23.
|
2023-05-02
|
No data
|
EAST 140 STREET, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new work done in the S6 Median, permit expired.
|
2023-05-02
|
No data
|
GRAND AVENUE, FROM STREET PACIFIC STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed ramps within the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 5/2/23.
|
2023-05-01
|
No data
|
DIKEMAN STREET, FROM STREET CONOVER STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk installed around new building construction
|
2023-04-30
|
No data
|
LEFFERTS AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed
|
2023-04-30
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the SE4 corner quadrant non Ada compliant , Ramp was measured and collected in prism on 1/25/23 ( gutter flow slopes )
|
2023-04-30
|
No data
|
NORTH 1 STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps within the SE4 corner quadrant seems to completed, will measure and collect on a later date due to heavy rain.
|
2023-04-30
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps within the NW2 corner quadrant are Ada compliant. Measured and collected in prism on 4/30/23.
|
2023-04-28
|
No data
|
CLINTON STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk repairs made in front of 145.
|
2023-04-26
|
No data
|
MONTROSE AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags.
|
2023-04-26
|
No data
|
GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
W OF RDWY 33FT, W MILLED 22FT, L MILLED 36FT, D MILLED 3 INCHES.
|
2023-04-24
|
No data
|
MIDDLETON STREET, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags.
|
2023-04-23
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
bpp completed withi intersection in front of 1 Sulivan place
|
2023-04-22
|
No data
|
BEDFORD AVENUE, FROM STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration is found to be in compliance
|
2023-04-22
|
No data
|
BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration found in compliance
|
2023-04-21
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
area has been reconstructed, please pass out and issue new CAR on new permit X042023089A07
|
2023-04-21
|
No data
|
FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp sealed and in compliance
|
2023-04-21
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Please issue CAR on new permit B042023006A03
|
2023-04-20
|
No data
|
SOUTH 5 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags in front of 155.
|
2023-04-20
|
No data
|
SOUTH 4 STREET, FROM STREET BEDFORD AVENUE TO STREET DRIGGS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags.
|
2023-04-20
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee failed to correct excessive landing cross slope in the NW2 corner. M&C in Prism on 11/7/22.
|
2023-04-20
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee correct defects. Ramp on Livonia was reconstructed and remeasured in Prim and found to be ADA compliant. Newer permit B042022340A03 on file
|
2023-04-17
|
No data
|
WASHINGTON AVENUE, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
bpp completed on roadway in front of 1 sulivan place
|
2023-04-17
|
No data
|
BUSHWICK AVENUE, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cement face curb
|
2023-04-17
|
No data
|
BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved for BPP
|
2023-04-14
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are ada compliant, Ramps was previously measured and collected in prism on 2/6/23 & update on 4/10/23.
|
2023-04-14
|
No data
|
KEAP STREET, FROM STREET GRAND STREET TO STREET HOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DW flags installed, in compliance
|
2023-04-14
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found to be ADA compliant. Previously Measured & collected in Prism on 12/6/22 and re measured on 2/22/23 due to changes on the landing. Newer permit on file B042023006A05
|
2023-04-14
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee obtained permit B042022340A02 and reconstructed ramp on Van Sinderen and excessive ramp ADA compliant in the NW2 corner,
|
2023-04-14
|
No data
|
HOPE STREET, FROM STREET BEND TO STREET KEAP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed In compliance
|
2023-04-13
|
No data
|
EAST 140 STREET, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done in the S6 medium, permit still active .
|
2023-04-13
|
No data
|
EAST 22 STREET, FROM STREET DURYEA PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permittee obtained a new permit # B042023080A27 for the partially completed tangent ramps in the NW2 corner. Permittee must restore ramps as per H-1011-1 standard details.
|
2023-04-11
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed tangent ramps within NW2 corner quadrant are non Ada compliant, however, previously measured and collected in prism on 10/27/22 and re-measured on 4/11/23. Ramps are now ada compliant. Newer permit B042023006A02 on file
|
2023-04-11
|
No data
|
GRAND CONCOURSE, FROM STREET MDE NORTHBOUND EXIT 3 TO STREET EAST 138 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
In compliance
|
2023-04-11
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Exp permit on file. Completed single ramp in the SE4 corner found not to be ADA compliant. Previously Measured & collected in Prism on 12/27/22.
|
2023-04-11
|
No data
|
EAST 140 STREET, FROM STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new work done in the SE4 corner quadrant, permit still active.
|
2023-04-10
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
New permit #X042023089A06 for SW corner. Landing area was corrected. Updated Prism on 4/10/23.
|
2023-04-08
|
No data
|
12 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2023-04-07
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly Completed tangent ramps in the NW2 corner quadrant are ADA compliant. Ramps was measured and collected in Prism on 4/7/23. Newer active permit B042023075A12 on file
|
2023-04-07
|
No data
|
FRONT STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved by BPP. Property AKA 68 Gold St.
|
2023-04-07
|
No data
|
FRONT STREET, FROM STREET GOLD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved by BPP. Active DDC work being done.
|
2023-04-07
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner quadrant are Non ADA compliant. Ramps was previously measured and collected in Prism on 10/5/20. Re-measured as non ada compliant 4/7/23. Newer active permit B042023075A11 on file
|
2023-04-04
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 1089 President street
|
2023-04-04
|
No data
|
NOSTRAND AVENUE, FROM STREET LENOX ROAD TO STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspected. Length 34' 5" Before Milling width 43' after milling 27' Depth 3". Foreman on site
|
2023-04-03
|
No data
|
KOSSUTH PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved by BPP
|
2023-04-02
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance
|
2023-04-02
|
No data
|
WEST 154 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags in compliance
|
2023-04-01
|
No data
|
CROTONA AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 189 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and curb in compliance
|
2023-03-31
|
No data
|
4 STREET, FROM STREET 26 AVENUE TO STREET 27 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent actively excavating the sidewalk in front og 26-12 4th Street without a permit on file to do so.
|
2023-03-30
|
No data
|
FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent single tangent ramp within the NE3 corner quadrant is ada compliant. Previously Measured and collected in prism on 3/16/23 and updated on 3/30/23.
|
2023-03-29
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2023-03-29
|
No data
|
LEFFERTS AVENUE, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Length 58' Width 45' Depth 2.5" before reaching the concrete base. Foreman on site
|
2023-03-29
|
No data
|
WEST 154 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk clear
|
2023-03-29
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway clear
|
2023-03-28
|
No data
|
FRANKLIN AVENUE, FROM STREET CLIFTON PLACE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete Curb to Curb- 40ftLength- 36ftWidth: 25.7ftDepth: 3 inches
|
2023-03-27
|
No data
|
EAST 28 STREET, FROM STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed Single tangent ramp in the NE3 corner quadrant is ada compliant. Measured and collected in prism on 3/27/23.
|
2023-03-27
|
No data
|
EAST 28 STREET, FROM STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location:1457 Flatbush Avenue Permit: B012023079B79, B012023079B80, & B012023079B81Width of Roadway: 63’Width of milled area: 36’Length of milled area: 172’Depth of milled area:3”
|
2023-03-27
|
No data
|
FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location:1457 Flatbush Avenue Permit: B012023079B79, B012023079B80, & B012023079B81Width of Roadway: 63’Width of milled area: 36’Length of milled area: 172’Depth of milled area:3”
|
2023-03-26
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Completed tangent ramps in the SE4 corner quadrant are non Ada compliant. Previously measured and collected in prism on 2/25/23
|
2023-03-26
|
No data
|
WASHINGTON AVENUE, FROM STREET NYCTA SUBWAY TO STREET SULLIVAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 1Sulivan place
|
2023-03-24
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single tangent ramp in the NE3 corner quadrant are non Ada compliant. Measured and collected in prism on 3/24/23.
|
2023-03-23
|
No data
|
FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW STEEL FACE CURB INSTALLED FOR NEW SIDEWALK
|
2023-03-21
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps in the SW1 corner are functional & accessible unable to measure due to barricades around ramps. We’ll measure & reinspect at a later date.
|
2023-03-20
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Ramps were previously upgraded by OLIVEIRA CONTRACTING under contract HWPR19M
|
2023-03-18
|
No data
|
CONOVER STREET, FROM STREET DIKEMAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant seem to be non ada compliant. Will measure and collect when completed, ramp covered at the time of inspection.
|
2023-03-18
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single ramp in the SE4 corner quadrant non Ada compliant , Ramp was measured and collected in prism on 1/25/23 ( landing running slopes active permit on file.. )
|
2023-03-17
|
No data
|
13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
All expansion joints, in sidewalk flags and at the curb, were sealed. Condition corrected, pass.
|
2023-03-17
|
No data
|
TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint was sealed
|
2023-03-16
|
No data
|
SULLIVAN PLACE, FROM STREET FRANKLIN AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete Curb to Curb- 33ftLength- 142ftWidth- 22.5ft Depth- 3.5inches
|
2023-03-16
|
No data
|
FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 3/16/23. Permittee must remove plastic off DWS and properly score corner.
|
2023-03-16
|
No data
|
FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Duplicate permit on file. No work started. Active Permit # B042023054A08 obtained for newly completed work done in NW2 corner.
|
2023-03-16
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found not to be ADA compliant due to not being able to measure roadway at this time. Zeros are being placed in prism we’ll return to accurately input slope measurements when paving is completed.
|
2023-03-16
|
No data
|
WEST 150 STREET, FROM STREET AMSTERDAM AVENUE TO STREET CONVENT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Inspection for PedRamp use. Ramp work done
|
2023-03-16
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET TO STREET WEST 151 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Inspection for PedRamp use. ramp work done
|
2023-03-15
|
No data
|
LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway was paved. BPP.
|
2023-03-15
|
No data
|
HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved.
|
2023-03-13
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner are functional & accessible. We’ll reinspect at later date due to weather conditions (rain).
|
2023-03-11
|
No data
|
VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2023-03-11
|
No data
|
FLATBUSH AVENUE, FROM STREET EAST 28 STREET TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2023-03-11
|
No data
|
86 STREET, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk occupancy acceptable
|
2023-03-09
|
No data
|
ATLANTIC AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed on roadway in front of 963 Atlantic avenue
|
2023-03-09
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Duplicate permit on file. Action taken on permit # B042022108A04 For the SE4 corner.
|
2023-03-09
|
No data
|
BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway
|
2023-03-08
|
No data
|
HOPE STREET, FROM STREET KEAP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 2/20/23.
|
2023-03-08
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 10/5/22. Open CAR on permit #B042022271A01.
|
2023-03-03
|
No data
|
BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 1/24/23. Concrete patch repaired at this time.
|
2023-03-02
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved.
|
2023-03-02
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk in compliance
|
2023-03-02
|
No data
|
BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed and acceptable, Curb to curb - 27' 7" , milled - 20' 1" x 62' 2" , depth - 3".
|
2023-03-02
|
No data
|
HOPE STREET, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed, In compliance
|
2023-03-02
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW resurfaced by BPP
|
2023-03-02
|
No data
|
RODNEY STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP
|
2023-03-01
|
No data
|
KEAP STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved by BPP for property
|
2023-03-01
|
No data
|
HOPE STREET, FROM STREET KEAP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Intersection paved by BPP
|
2023-03-01
|
No data
|
BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Metal curb and drop curb install IFO 616, sealed. In compliance
|
2023-02-28
|
No data
|
BEACH 96 STREET, FROM STREET ROCKAWAY BEACH BOULEVARD TO STREET WOODROW COTTAGES
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary pedestrian walkway is clear and is in compliance at this time of inspection.
|
2023-02-28
|
No data
|
86 STREET, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no active work on going
|
2023-02-27
|
No data
|
FLATBUSH AVENUE, FROM STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work started in the NW2 corner quadrant, open broken corner quadrant.
|
2023-02-27
|
No data
|
EAST 28 STREET, FROM STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started in the SE4 corner quadrant at the time of inspection.
|
2023-02-26
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent has a temporary walk way in front of 101 macombs place. The respondent failed to provide or place a ramp at entry as stated in stipulation (014) for handicap accessibility.
|
2023-02-26
|
No data
|
THOMSON AVENUE, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP flush to grade in the roadway.
|
2023-02-25
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within the SE4 corner quadrant is non ada compliant. Previously measured and collected in prism on 2/6/23. scoring within quadrant was done , high slopes.
|
2023-02-25
|
No data
|
GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Barricades in parking lane, No BPP paving work started at the time of inspection.
|
2023-02-24
|
No data
|
SULLIVAN PLACE, FROM STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed single ramp in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 2/24/23. Permittee must remove concrete restoration near ramp which not an acceptable pavement key.
|
2023-02-24
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active construction. Ramps located behind barriers
|
2023-02-22
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner found to be ADA compliant. Measured & collected in Prism on 12/6/22 and re measured on 2/22/23 due to changes on the landing.
|
2023-02-22
|
No data
|
MACOMBS PLACE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active crew on site
|
2023-02-22
|
No data
|
WEST 154 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active crew on site
|
2023-02-20
|
No data
|
HOPE STREET, FROM STREET KEAP STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 2/20/23.
|
2023-02-16
|
No data
|
BUSHWICK AVENUE, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
B012023045A55 W OF RDWY 42FT, W MILLED 26FT, L MILLED 64FT,D MILLED 3 INCHES.
|
2023-02-16
|
No data
|
KOSSUTH PLACE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
B012023045A56 W OF RDWY 30FT, W MILLED 20FT, L MILLED 114FT,D MILLED 3 INCHES.
|
2023-02-16
|
No data
|
ATLANTIC AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB REPLACED IN FRONT OF 963 ATLANTIC AVENUE
|
2023-02-16
|
No data
|
BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
B012023045A57 INTERSECTION 44FT X 30FT, INTERSECTION MILLED 28FT X 20FT, D 3 INCHES.
|
2023-02-15
|
No data
|
HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP COMPLETED ON ROADWAY FOR NEW BULDING AKA 1259 BEDFORD AVENUE
|
2023-02-15
|
No data
|
BUSHWICK AVENUE, FROM STREET HIMROD STREET TO STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew still on site, machine are away. Making corner quad safe for wheelchair access
|
2023-02-14
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed on roadway in front of 1089 President street
|
2023-02-14
|
No data
|
WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done under M012021291A00.
|
2023-02-11
|
No data
|
LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESEAL THE PERM RESTORATION IFO PROPERTY #11.
|
2023-02-10
|
No data
|
ATLANTIC AVENUE, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 50 feetWidth of milled area: 30 feetLength of milled area: 178 feetDepth of milled area: 3 inchesIn compliance with required BPP measurements, pass.
|
2023-02-09
|
No data
|
LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb not replaced
|
2023-02-08
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP to grade
|
2023-02-07
|
No data
|
MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2023-02-07
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved.
|
2023-02-07
|
No data
|
METROPOLITAN AVENUE, FROM STREET HAVEMEYER STREET TO STREET NORTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2023-02-07
|
No data
|
METROPOLITAN AVENUE, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved.
|
2023-02-07
|
No data
|
LIVONIA AVENUE, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE UNDER THIS PERMIT
|
2023-02-07
|
No data
|
LINDEN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW paved by BPP
|
2023-02-06
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant non Ada compliant, Ramps was measured and collected in prism on 2/6/23 ( landing cross slopes).
|
2023-02-06
|
No data
|
38 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant is non ada compliant. Measured and collected in prism on 2/6/23. High curb reveal
|
2023-02-03
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway:30’Width of milled area:20’Length of milled area:116’Depth of milled area:3’
|
2023-02-02
|
No data
|
MARCY AVENUE, FROM STREET MYRTLE AVENUE TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete Curb to curb- 40ftLength- 42ftWidth: 23ftDepth: 3.5inches
|
2023-02-02
|
No data
|
MARCY AVENUE, FROM STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete Curb to curb- 40ftLength- 41.5ftWidth- 23ftDepth- 3.5 inches
|
2023-02-02
|
No data
|
VERNON AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete Curb to curb- 30ft Length- 140ft Width- 22ftDepth- 3.5inches
|
2023-02-02
|
No data
|
WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2023-02-02
|
No data
|
EAGLE AVENUE, FROM STREET EAST 149 STREET TO STREET TERRACE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance
|
2023-02-02
|
No data
|
12 AVENUE, FROM STREET 57 STREET TO STREET 58 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The BPP was done in compliance with DOT Specs.
|
2023-02-01
|
No data
|
KENT AVENUE, FROM STREET NORTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved.
|
2023-02-01
|
No data
|
KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved.
|
2023-01-31
|
No data
|
86 STREET, FROM STREET 5 AVENUE TO STREET GELSTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp walkway
|
2023-01-31
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NW2 corner quadrant are Non ADA compliant. Ramps was previously measured and collected in Prism on 10/5/20.( left flare slopes)
|
2023-01-30
|
No data
|
EAST 22 STREET, FROM STREET DURYEA PLACE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent constructed landing area of previously constructed pedestrian ramps within the northwest corner without a valid 410 Pedestrian Ramp Modify/Install permit on file. Rejected application #2022100600439963 for work used for ID only, no permit
|
2023-01-30
|
No data
|
BERRIMAN STREET, FROM STREET LINDEN BOULEVARD TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP in compliance - - Milled W22ft of 33ft of roadway W31ft D3in - - Pave work to be done later today.
|
2023-01-29
|
No data
|
60 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP final restoration acceptable
|
2023-01-28
|
No data
|
FOSTER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET CORBIN COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street has been paved in compliance
|
2023-01-28
|
No data
|
MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2023-01-28
|
No data
|
CONEY ISLAND AVENUE, FROM STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp paved an in compliance
|
2023-01-28
|
No data
|
CONEY ISLAND AVENUE, FROM STREET FOSTER AVENUE TO STREET PARKVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp sealed and in compliance
|
2023-01-28
|
No data
|
WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2023-01-27
|
No data
|
EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-27
|
No data
|
EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
2023-01-27
|
No data
|
EAST 31 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE SOUTH
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
- OCCUPANCY OF SIDEWALK AS STIPULATED: At time of inspection CENTRAL CONCRETE INC. have active permits. the sidewalk was clear of debris. No action taken.
|
2023-01-26
|
No data
|
METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street paved. AKA 187 Kent Ave.
|
2023-01-25
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the SE4 corner quadrant non Ada compliant , Ramp was measured and collected in prism on 1/25/23 ( landing running slopes. )
|
2023-01-24
|
No data
|
CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-24
|
No data
|
BUSHWICK AVENUE, FROM STREET KOSSUTH PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant are Ada compliant. Measured and collected in prism on 1/24/23.
|
2023-01-22
|
No data
|
RODNEY STREET, FROM STREET AINSLIE STREET TO STREET HOPE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET ON THE SIDE OF PROPERTY #130 HOPE ST.
|
2023-01-21
|
No data
|
HOPE STREET, FROM STREET BQE EASTBOUND EXIT 32 TO STREET KEAP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET
|
2023-01-20
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 38 STREET TO STREET 39 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
FULL SIDEWALK EXCAVATED WITH PROTECTED PEDESTRIAN WALKWAY IN ROADWAY IN COMPLIANCE WITH DOT PERMIT STIPULATIONS
|
2023-01-19
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps in the NW2 corner found not to be ADA compliant. Measured & collected in Prism on 10/27/22.Open CAR on permit # B042022271A02. Excessive curb reveal & landing slopes remain.
|
2023-01-19
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps in the NW2 corner found not to be ADA compliant. Measured & collected in Prism on 12/6/22. Open Car on file permit # B042022306A02.
|
2023-01-19
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Exp permit on file. Completed single ramp in the SE4 corner found not to be ADA compliant. Measured & collected in Prism on 12/27/22.
|
2023-01-17
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SE4 corner quadrant was found to be non ADA compliant. Previously measured in prism on 6/16/22 updated on 1/17/23.
|
2023-01-17
|
No data
|
FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started at time of inspection
|
2023-01-17
|
No data
|
GATES AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2023-01-12
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance. Perm in roadway intersection.
|
2023-01-12
|
No data
|
LEWIS AVENUE, FROM STREET BROADWAY TO STREET STOCKTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
W OF RDWY: 50FT, W MILLED: 30FT, L MILLED: 40FT, D MILLED: 3 INCHES
|
2023-01-11
|
No data
|
ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-11
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
respondent currently had full width of roadway closed off to all vehicular traffic, failing to comply with 023 stipulation: having one 11 foot lane open
|
2023-01-10
|
No data
|
ROGERS AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-10
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway:34 feet Property line to property lin:284 feetMilled portion: 17+5=22Depth of roadway:3 inches
|
2023-01-10
|
No data
|
UNION STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway:34 feet Property line to property lin:132 feetMilled portion: 17+5=22 feetDepth of roadway:3 inches
|
2023-01-08
|
No data
|
DE KALB AVENUE, FROM STREET BROADWAY TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
LANE MARKING RESTORED ON THE 1/2 + 5 PERM RESTORATION.
|
2023-01-08
|
No data
|
LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DOT paved the segment
|
2023-01-08
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2023-01-08
|
No data
|
NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2023-01-08
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found
|
2023-01-08
|
No data
|
NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-06
|
No data
|
RUTLAND ROAD, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-06
|
No data
|
JOHNSON AVENUE, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed.
|
2023-01-06
|
No data
|
MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2023-01-05
|
No data
|
NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-05
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in roadway. Half plus five in compliance.
|
2023-01-02
|
No data
|
NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET
|
2022-12-29
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Only the ramp on Van Sinderen was upgraded and remeasured to correct excessive slopes and change ramp location. Measured & collected in Prism on 12/29/22.
|
2022-12-27
|
No data
|
HOPE STREET, FROM STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed single ramp in the SE4 corner found not to be ADA compliant due to inability to measure complete ramps.Roadway & Curb Reveal. Measured & collected in Prism 12/27/22.
|
2022-12-25
|
No data
|
ROGERS AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 1173 Rogers avenue
|
2022-12-23
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangents ramps in the SE4 previously measured & collected in Prism. Reconstruction of ramp on (Livonia Ave) remeasured& after completion found ADA compliant. Also added a new upgrade to prism for the new work.
|
2022-12-21
|
No data
|
NEW YORK AVENUE, FROM STREET CLARENDON ROAD TO STREET CORTELYOU ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway: 40 feetProperty line to property line:50 feetMilled portion of roadway:25 feetDepth of roadway:3 inches
|
2022-12-21
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway:46’Width of milled area:28’Length of milled area:28’Depth of milled area:3’
|
2022-12-21
|
No data
|
MARCY AVENUE, FROM STREET HOPE STREET TO STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway:34’Width of milled area:22’Length of milled area:198’Depth of milled area:3’
|
2022-12-21
|
No data
|
METROPOLITAN AVENUE, FROM STREET MARCY AVENUE TO STREET NORTH 5 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway:46’Width of milled area:28’Length of milled area:161’Depth of milled area:3’
|
2022-12-20
|
No data
|
56 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
atpo i observed above respondent has jersey barriers on the roadway without an active DOT permit on file. permit on file expired on 12/29/20 and used for id only
|
2022-12-19
|
No data
|
CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway:33’Width of milled area:21Length of milled area:59’Depth of milled area:3’
|
2022-12-15
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No ped ramp work started in the NE corner quadrant at time of inspection.
|
2022-12-14
|
No data
|
13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset and acceptable
|
2022-12-14
|
No data
|
GRAND STREET, FROM STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 411 permit on file. Partial permanent concrete restoration in the NW2. Old existing ramp is functional & accessible. We’ll measure and reinspect when ramp is completed.
|
2022-12-13
|
No data
|
TROY AVENUE, FROM STREET FENIMORE STREET TO STREET HAWTHORNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET IN FRONT OF 594 TROY AVENUE
|
2022-12-13
|
No data
|
MARCY AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Permittee is breaking up corner and preparation for the ped ramp reconstruction in the NW2 corner. Barricades are surrounding broken corner at this time.
|
2022-12-12
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, all lane markings restored ....n/w/c ...
|
2022-12-12
|
No data
|
CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, all lane markings restored ....
|
2022-12-06
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass, street fully milled out .. 88x25x3" n/w/c ....due to bpp....
|
2022-12-06
|
No data
|
WYTHE AVENUE, FROM STREET GRAND STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 411 permit on file. Newly completed tangent ramps in the SW1 corner are functional and accessible. We’ll measure and reinspect at a later date due to weather (rain).
|
2022-12-06
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found to be ADA compliant. Measured & collected in Prism on 12/6/22.
|
2022-12-06
|
No data
|
CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
116x20x3" milled out ,due to bpp all lines to be restored the next business day weather permitting.
|
2022-12-04
|
No data
|
THOMSON AVENUE, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed.
|
2022-12-02
|
No data
|
8 STREET, FROM STREET MAIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the SW1 corner quadrant was found to be non ADA compliant. Ramps are functional and accessible, measured in prism on 12/2/2022.
|
2022-12-01
|
No data
|
JEROME AVENUE, FROM STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, no walkway for pedestrians. nOV issued.
|
2022-12-01
|
No data
|
MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Crew on site, Ped ramp underway, NoV issued for failing to provide protected walkway
|
2022-12-01
|
No data
|
MT HOPE PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
crew on site, working without DOT permit.
|
2022-11-29
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
atpo i observed above respondent has jersey barriers on the roadway without an active DOT permit on file. permit on file expired on 1/8/21 and used for id only
|
2022-11-29
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Condition repaired. Work was completed by the MTA as per Kerry.
|
2022-11-29
|
No data
|
HANCOCK STREET, FROM STREET CYPRESS AVENUE TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
143' x 20' x 3" area milled within the parking/driving lane at 1711 Hancock Street
|
2022-11-28
|
No data
|
MAIN AVENUE, FROM STREET 8 STREET TO STREET 30 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The below BPP is completed and acceptable. Curb to Curb width – 45’, Milled area – 28’ x 161, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No.
|
2022-11-28
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDE WALK FLAGS INSTALLED AND SEALED
|
2022-11-28
|
No data
|
WELLING COURT, FROM STREET 8 STREET TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The below BPP is completed and acceptable. Curb to Curb width – 30’, Milled area – 20’ x 77, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No.
|
2022-11-28
|
No data
|
8 STREET, FROM STREET MAIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The below BPP is completed and acceptable. Curb to Curb width – 45’, Milled area – 28’ x 35, Depth of milled area – 3”, ½ +5’ milled (yes/no) – Yes, Waiver (yes/no)- No.
|
2022-11-26
|
No data
|
13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints need to be sealed ifo 348 13th St
|
2022-11-26
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS ARE SEALED
|
2022-11-23
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 21 Duryea place
|
2022-11-22
|
No data
|
TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
W OF RDWY 23FT, W MILLED 20FT, L MILLED 46FT, D MILLED 3.5in.
|
2022-11-22
|
No data
|
TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb installed
|
2022-11-21
|
No data
|
13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk expansion joint not seal
|
2022-11-18
|
No data
|
ROGERS AVENUE, FROM STREET AVENUE D TO STREET CLARENDON ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full roadway width 44’0CutL38’0 W28’0 D0’3
|
2022-11-17
|
No data
|
PURVIS STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed in front of 44-46.
|
2022-11-16
|
No data
|
BEDFORD AVENUE, FROM STREET CLYMER STREET TO STREET TAYLOR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb reset
|
2022-11-15
|
No data
|
TAAFFE PLACE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT WAS ACTIVELY MILLING THE ROADWAY AT 2:40PM ON TUESDAY. RESPONDENT VIOLATED STIPULANTION #083 WORK 9AM -2PM MON - FRI. ID BY PERMIT #B012022319B16 EXPIRES 11/20/2022.
|
2022-11-14
|
No data
|
WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway measures 34 feet from curb to curb. Contractor has milled 22 feet, of the roadway, adjacent to the property, with a length of 140 feet, and a depth of 3 inches. In compliance with required BPP measurements.
|
2022-11-14
|
No data
|
NOSTRAND AVENUE, FROM STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled the intersection in line with both adjacent segments and a depth of 3 inches. In compliance with required BPP measurements.
|
2022-11-14
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
work completed by MTA
|
2022-11-14
|
No data
|
NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway measures 40 feet from curb to curb. Contractor has milled 25 feet, of the roadway, adjacent to the property, with a length of 185 feet, and a depth of 3 inches. In compliance with required BPP measurements.
|
2022-11-11
|
No data
|
DURYEA PLACE, FROM STREET EAST 22 STREET TO STREET FLATBUSH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Before milling the width of roadway is 29’ 6” Width milled is 20’ Length milled is 65' 8" & Depth is 2.5" before reaching the concrete base. Foreman on site.
|
2022-11-08
|
No data
|
EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb repaired in front of 485 East 28 street
|
2022-11-07
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition remains the same. We’ll pass this one out and reissue another CAR.
|
2022-11-07
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within NW2 are non ada compliant, Measured and collected in prism on 11/07/22.
|
2022-11-06
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass out to issue new CAR with language including BPP ramp placement
|
2022-11-05
|
No data
|
46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk was installed in compliance.
|
2022-11-02
|
No data
|
CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2022-10-27
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within NW2 corner quadrant are non Ada compliant, however, Measured and collected in prism on 10/27/22.
|
2022-10-22
|
No data
|
PACIFIC STREET, FROM STREET CLASSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2022-10-20
|
No data
|
LYNCH STREET, FROM STREET HARRISON AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk installed
|
2022-10-20
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags missing sealer for expansion joint at curb.
|
2022-10-18
|
No data
|
WILLOUGHBY AVENUE, FROM STREET NOSTRAND AVENUE TO STREET SANDFORD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET ON THE SIDE OF PROPERTY #184 NOSTRAND AV.
|
2022-10-16
|
No data
|
CHRISTOPHER AVENUE, FROM STREET EAST NEW YORK AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2022-10-15
|
No data
|
STANHOPE STREET, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2022-10-13
|
No data
|
NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind sealed and flush
|
2022-10-11
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found not to be ADA compliant. Measured & collected in Prism 9/16/22
|
2022-10-07
|
No data
|
NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Before milling the width of roadway is 34’ Milling length is 51’ 9” & Width milled is 22’ & Depth is 3". Foreman on site.
|
2022-10-07
|
No data
|
EAST 28 STREET, FROM STREET FOSTER AVENUE TO STREET NEWKIRK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP COMPLETEWidth of the roadway: 29'7Width milled: 20'4Length milled: 47"11Depth milled: 3"
|
2022-10-05
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NW2 corner quadrant are non Ada compliant, high curb reveal, no scoring done within quadrant. Ramps are functional and accessible, barricades are in walk-in space.
|
2022-10-03
|
No data
|
PURVIS STREET, FROM STREET DEAD END TO STREET JACKSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed and acceptable. • Curb to Curb width – 30’• Milled area – 21’• Depth of milled area – 3’’
|
2022-10-03
|
No data
|
LIBERTY AVENUE, FROM STREET CHRISTOPHER AVENUE TO STREET MOTHER GASTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence on swk ok
|
2022-10-03
|
No data
|
THOMSON AVENUE, FROM STREET 44 DRIVE TO STREET QNSBO BR UP RY APPROACH
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed and acceptable. • Curb to Curb width – 60’• Milled area – 35’• Depth of milled area – 3’’
|
2022-10-03
|
No data
|
CHRISTOPHER AVENUE, FROM STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Open quadrant within the NW2 corner, ramps are not functional and accessible. Will measure and collect when completed properly, active permit on file.
|
2022-10-02
|
No data
|
NEW YORK AVENUE, FROM STREET FARRAGUT ROAD TO STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk open at this time
|
2022-09-30
|
No data
|
CLYMER STREET, FROM STREET BEDFORD AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
reset curb
|
2022-09-28
|
No data
|
KENT AVENUE, FROM STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
INTERSECTION L44FT X W 41FT. L MILLED 26FT, W MILLED 25FT, D MILLED 2.5in.
|
2022-09-28
|
No data
|
KENT AVENUE, FROM STREET METROPOLITAN AVENUE TO STREET NORTH 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
W OF RDWY 40FT, W MILLED 25FT, L MIILED 223FT, D MILLED 2.5 in
|
2022-09-28
|
No data
|
METROPOLITAN AVENUE, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
W OF RDWY 42FT, W MILLED 25FT, L MILLED 96FT, D MIILED 2.5in.
|
2022-09-28
|
No data
|
KENT AVENUE, FROM STREET NORTH 3 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
INTERSECTION L41FT X W27FT. INTERSECTION MILLED L25FT, W MILLED 21FT. D2.5in.
|
2022-09-28
|
No data
|
LIVONIA AVENUE, FROM STREET PEDESTRIAN OVERPASS TO STREET SNEDIKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, in compliance
|
2022-09-28
|
No data
|
NORTH 3 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent was actively milling the roadway at 4:05pm on a Wednesday. Respndent violated the 072 stipulation WORK 9AM-4PM, MONDAY TO FRIDAY. Respondent failed to adhere to stipulation 072. ID BY PERMIT B012022268A07 EXPIRES 10/26
|
2022-09-27
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps within NE3 corner quadrant are non Ada compliant, however , ramps are functional and accessible. Previously measured and collected in prism on 9/16/22.
|
2022-09-22
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB RESET
|
2022-09-22
|
No data
|
MANHATTAN AVENUE, FROM STREET GREEN STREET TO STREET HURON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed.
|
2022-09-20
|
No data
|
GOLD STREET, FROM STREET FRONT STREET TO STREET WATER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete. Width of roadway 30ft , width of milled area 20 ft, length 221ft, depth 3 inches
|
2022-09-20
|
No data
|
WATER STREET, FROM STREET BRIDGE STREET TO STREET GOLD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew excavating before work hours .
|
2022-09-18
|
No data
|
NOSTRAND AVENUE, FROM STREET VERNON AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACE CURB INSTALLED IFO PROPERTY #184.
|
2022-09-16
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Ramps were previously upgraded by OLIVEIRA CONTRACTING under contract HWPR19M
|
2022-09-16
|
No data
|
LIVONIA AVENUE, FROM STREET VAN SINDEREN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed single tangent ramp within the SE4 corner quadrant is non ada compliant, however, the ramp is functional and accessible. Measured and collected in prism on 9/16/22. High left flare slope and utility pole needs to be isolated.
|
2022-09-14
|
No data
|
LENOX ROAD, FROM STREET NEW YORK AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full rw width 35’0Cut size L55’0 W22’0 D0’3
|
2022-09-04
|
No data
|
HURON STREET, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is in compliance
|
2022-08-22
|
No data
|
MANHATTAN AVENUE, FROM STREET GREEN STREET TO STREET HURON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work has been started at this time.
|
2022-08-22
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Ramps were previously upgraded by OLIVEIRA CONTRACTING under contract HWPR19M
|
2022-08-21
|
No data
|
AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2022-08-19
|
No data
|
CONVENT AVENUE, FROM STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada. Measured in prism 8/19/22.
|
2022-08-18
|
No data
|
CHRYSTIE STREET, FROM STREET DELANCEY STREET TO STREET RIVINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
*BPP Inspection* I/F/O 173 - 175, existing RW width ( 67'4" ) and milled area to be paved was ( 47'3"L x 39'5"W x 3"D - measured Depth along edges & around access cover within milling ). V&D Paving Corp still milling at time of depart: 10:48am.
|
2022-08-16
|
No data
|
ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 153 Erasmus StreetPermit: B01202227A60Width of Roadway: 29ft 9inWidth of milled area: 19ft 11inLength of milled area: 59ft 8inDepth of milled area: 3fin down
|
2022-07-08
|
No data
|
MANIDA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No occupancy of sidewalk
|
2022-06-21
|
No data
|
HERKIMER STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway:32 feetProperty line to property line:100 feetMilled portion: 21 feetDepth of roadway:3 inches
|
2022-06-21
|
No data
|
BEDFORD AVENUE, FROM STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway:52 feetProperty line to property line:Milled portion: 31 feetDepth of roadway:3 inches
|
2022-06-21
|
No data
|
BEDFORD AVENUE, FROM STREET BREVOORT PLACE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway:54 feetProperty line to property line:62 feetMilled portion: 32 feetDepth of roadway:3 inches
|
2022-06-13
|
No data
|
ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location:156 Erasmus Street Permit: B012022163A00Width of Roadway:30’ Width of milled area: 20’Length of milled area: 58’Depth of milled area: 3”
|
2022-06-07
|
No data
|
MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY W41FT, MILLED W26FT, MILLED L180FT, MILLED D3in IFO PROPERTY #859.
|
2022-05-27
|
No data
|
CLARKSON AVENUE, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full RW width 38'0Cut size:: L110'9 W24'2 D0'3 1/4
|
2022-05-03
|
No data
|
21 STREET, FROM STREET 31 AVENUE TO STREET 31 ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completed and acceptable in front of 31-05. Office was notified prior to the commencement of paving. Curb to curb - 59' 10", milled - 60' 2" x 35' 1", depth - N/A.
|
2022-05-02
|
No data
|
21 STREET, FROM STREET 31 AVENUE TO STREET 31 ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent CENTRAL CONCRETE INC failed to comply with terms & conditions of specific stipulation, during WORK-HOURS, flag personnel shall be provided at each end of the work-zone to direct vehicular traffic. Nov issued
|
2022-05-02
|
No data
|
13 AVENUE, FROM STREET 42 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the SW1 corner quadrant non Ada compliant ramps are accessible and functional. Measured and collected in Prism on 10/12/21.( gutter flow slope , right flare slope ).
|
2022-04-27
|
No data
|
SUMNER PLACE, FROM STREET BROADWAY TO STREET FLUSHING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind sealed and flush.
|
2022-04-21
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Issues with pavement key resolved. Completed single ramp in the SW1 corner quad is accessible and functional but not ADA compliant. Previously measured and collected on 9/30/20 in Prism.
|
2022-04-13
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pavement key was installed.
|
2022-04-11
|
No data
|
16 AVENUE, FROM STREET 46 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR issues resolved corner has been sealed. Newly completed tangent ramps within the NW2 corner quadrant are non Ada compliant, however, ramps are functional and accessible. Previously measured and collected in prism on 10/14/21.
|
2022-04-09
|
No data
|
CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Depressed area has been made flush with surrounding restoration.
|
2022-03-29
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 9/30/20.
|
2022-03-21
|
No data
|
CONEY ISLAND AVENUE, FROM STREET FOSTER AVENUE TO STREET PARKVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 208’x40’ area of roadway to a depth of 3” in compliance, roadway measures to be 70’ wide from curb to curb.
|
2022-03-21
|
No data
|
CONEY ISLAND AVENUE, FROM STREET FOSTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 42’x28’ area of roadway to a depth of 3” in compliance, Intersection measures to be 73’x45’ in diameter
|
2022-03-21
|
No data
|
FOSTER AVENUE, FROM STREET CONEY ISLAND AVENUE TO STREET CORBIN COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 145’x26’ area of roadway to a depth of 3” in compliance, Roadway measures to be 43’ from curb to curb.
|
2022-03-09
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner quadrant are functional and accessible. Non ADA compliant. Previously measured and collected in Prism on 10/5/20.
|
2022-02-11
|
No data
|
DE KALB AVENUE, FROM STREET BROADWAY TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY CURB TO CURB 40FT 4IN. ROADWAY MILLED IS 60FT 9IN X 22FT 5IN WITH A DEPTH OF 4IN
|
2022-02-10
|
No data
|
MILLER AVENUE, FROM STREET BELMONT AVENUE TO STREET PITKIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
• Curb to Curb width – 30’• Milled area – 20’• Depth of milled area – 3” • ½ +5’ milled (yes/no) – yes 20’ • Waiver (yes/no) –NO
|
2022-02-06
|
No data
|
AINSLIE STREET, FROM STREET KEAP STREET TO STREET RODNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb intact, no defects at this time
|
2022-02-06
|
No data
|
HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF+5
|
2022-02-04
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is in compliance
|
2022-01-15
|
No data
|
GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk installed
|
2022-01-14
|
No data
|
HANCOCK STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
UPON INSPECTION ROADWAY IS CURRENTLY MILEED ROADWAY CURB TO CURB IS 33FT 10IN.MILEED ROADWAY IS 22FT 2IN X 34FT 4IN WITH A DEPTH OF 3 INCHES
|
2022-01-12
|
No data
|
KENT AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway measures 30 feet from curb to curb. The contractor has milled 20 feet of the roadway adjacent to the property, with a width of 36 feet, and a depth of 3 inches. In compliance with required BPP milling measurements, pass.
|
2022-01-12
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire sidewalk was repaired in front of 91 Franklin Avenue, expansion joints are sealed.
|
2022-01-04
|
No data
|
HARRISON AVENUE, FROM STREET LYNCH STREET TO STREET MIDDLETON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Whole street: 39ft 8in Plus half 5: 25ft 3in Width: 32ft 7in Down 3in
|
2022-01-04
|
No data
|
LORIMER STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Whole street: 39ft 8in Plus half 5: 25ft 3in Width: 32ft 7in Down 3in
|
2021-11-12
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the SW1 corner quad is accessible and functional but not ADA compliant. Previously measured and collected on 9/30/20 in Prism.
|
2021-11-10
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Previously Measured in prism on 9/3/21. Excessive curb reveal still remains at this time of inspection.
|
2021-11-06
|
No data
|
WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work Not Started At Time Of Inspection.
|
2021-11-05
|
No data
|
CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
A 5' x 5' area of Bpp paving sunken 2" below grade, in the driving lane.
|
2021-11-04
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE BRIDGE EXIT RAMP
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
V & D Paving foreman Luis milled a 1/2 plus 5 of the roadway ( 57' x 40' ) Awaiting 7f to complete restoration
|
2021-11-01
|
No data
|
46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The sidewalk was installed in compliance
|
2021-10-21
|
No data
|
RUTLAND ROAD, FROM STREET ALBANY AVENUE TO STREET KINGSTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspected. Before milling the width of roadway is 30' Width milled is 20’ & Length milled is 60' & Depth is 3". Foreman on site.
|
2021-09-30
|
No data
|
5 AVENUE, FROM STREET EAST 128 STREET TO STREET EAST 129 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Half plus 5 in compliance, tack coat applied.
|
2021-09-28
|
No data
|
16 AVENUE, FROM STREET 46 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. Newly completed tangent ramps in the NW2 corner are functional and accessible. We’ll measure and reinspect at a later date due to weather (rain).
|
2021-09-23
|
No data
|
46 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ped /walk notvvisible
|
2021-09-20
|
No data
|
WEST 29 STREET, FROM STREET HIGH LINE TO STREET 11 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags have been installed in front of 517.
|
2021-09-15
|
No data
|
GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2021-09-14
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the SW1 corner quad is accessible and functional but not ADA compliant. Previously measured and collected on 9/30/20 in Prism.
|
2021-09-10
|
No data
|
60 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor is currently in the middle of milling pavement but has not paved..no notifications made.
|
2021-09-07
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Previously Measured in prism on 9/3/21. Excessive curb reveal still remains at this time of inspection.
|
2021-09-03
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps within the NE3 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 9/3/21
|
2021-08-30
|
No data
|
GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW paved by BPP in compliance for new building
|
2021-08-25
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner found not to be ADA compliant. Ramps are functional and accessible. Measured & collected in Prism on 10/5/20.
|
2021-08-20
|
No data
|
EVERGREEN AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway repaved as per BPP from Linden St to end of new building property. Lane markings and bike lane restored.
|
2021-08-20
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New corner building, roadway repaved as per BPP, area in intersection outside the BPP by the telecom manhole is a bit broken up probably from winter shoveling and patchwork.
|
2021-08-19
|
No data
|
GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB INSTALLED I/F/O PROPERTY #380.
|
2021-08-16
|
No data
|
GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW flags installed. Expansion joints sealed, in compliance
|
2021-08-12
|
No data
|
13 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw cut ok
|
2021-08-10
|
No data
|
BROADWAY, FROM STREET MARCUS GARVEY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started at this time
|
2021-08-07
|
No data
|
VANDERBILT AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved half plus 5 feet
|
2021-08-03
|
No data
|
NEW YORK AVENUE, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 130’x22’ area of roadway to a depth of 3” in compliance, Roadway measures to be 34’ wide from curb to curb.
|
2021-07-28
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed
|
2021-07-28
|
No data
|
CLARENDON ROAD, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration found to be in compliance
|
2021-07-12
|
No data
|
VANDERBILT AVENUE, FROM STREET GATES AVENUE TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Rwy IFO PROPERTY, recently re-paved. All lane markings restored & no obstruction or impaction to conventional bike lane
|
2021-07-08
|
No data
|
50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: PASS - Length of Milling: 81ft 4in Width of Milling: 20ft Full Width of Roadway: 30ft Depth: 4in
|
2021-06-24
|
No data
|
ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 146 erasmus street
|
2021-06-20
|
No data
|
MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street is paved
|
2021-06-02
|
No data
|
MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is in compliance.
|
2021-05-27
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb work in compliance
|
2021-05-25
|
No data
|
38 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway measures 30 feet from curb to curb. Contractor has milled 20 feet of the roadway adjacent to the roadway with a depth of 3 inches and a length of 90 feet. In compliance with BPP required measurements.
|
2021-05-20
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2021-05-14
|
No data
|
CLARENDON ROAD, FROM STREET EAST 31 STREET TO STREET EAST 32 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of roadway - 50ftWidth of roadway after mil - 30ftLength of the roadway - 60ftDepth of roadway - 3in
|
2021-05-12
|
No data
|
SANDFORD STREET, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP completedCurb to Curb- 25ft. Length- 70 ft.Width- 21ft Depth-3inches
|
2021-05-11
|
No data
|
CHISHOLM STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
50' by 20' pass
|
2021-04-26
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Issues resolved. Newly completed single ramp in the SW1 corner quadrant is functional and accessible. Non ADA compliant. Measured and collected on 9/30/20 in Prism.
|
2021-04-19
|
No data
|
42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints installed on s/w close to 13 ave
|
2021-03-29
|
No data
|
GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SIDEWALK INSTALLED.
|
2021-03-10
|
No data
|
GROVE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY PAVED HALF +5
|
2021-03-09
|
No data
|
EAST 51 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RW paved by BPP
|
2021-03-04
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No valid permit for closing off 60' X 8' of roadway with plastic barriers on the roadway
|
2021-02-16
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent CENTRAL CONCRETE INC. failed to comply with terms & conditions of stipulation #014, maintain a 5 FOOT clear protected pedestrian walkway in the roadway to all ongoing pedestrians. Nov issued
|
2021-02-04
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence ok sw
|
2021-01-24
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence maintained
|
2021-01-22
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY HAS BEEN MILLED. 50FT X 21FT, DOWN 3 INCHES IFO 91 FRANKLIN AVE.
|
2021-01-16
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence maintained
|
2021-01-08
|
No data
|
EAST 51 STREET, FROM STREET RUTLAND ROAD TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave st conducted for location 1/2 +5
|
2020-11-30
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp. Must remove plastic cover on DWS. Ramp is functional and accessible. Previously measured and collected.
|
2020-11-28
|
No data
|
56 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
material stored behind fence
|
2020-11-28
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pedestrian walk in compliance
|
2020-11-27
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no signs posted on 13th Ave
|
2020-11-27
|
No data
|
56 STREET, FROM STREET 13 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the fence is maintained
|
2020-11-23
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NW2 corner found to be non ADA compliant, ramps are functional and accessible. Measured and collected on Prism on 10/5/20.
|
2020-11-23
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Car has been answered
|
2020-11-17
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Slope issues has been resolved and in compliance. Newly completed single ramp in the SW1 corner quadrant is functional and accessible. Non ADA compliant. Measured and collected on 9/30/20 in Prism. Newer permit B042020300A16 on file
|
2020-11-13
|
No data
|
13 AVENUE, FROM STREET 56 STREET TO STREET 57 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Fence maintained
|
2020-11-04
|
No data
|
42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints not seal in 42st 12ave 13ave
|
2020-10-30
|
No data
|
MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVING DONE. ONE HALF, PLUS 5FT.
|
2020-10-28
|
No data
|
13 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok seal
|
2020-10-26
|
No data
|
42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
42nd St between 12th Ave & 13th Ave… Property Length 103’L, Roadway Width Curb to Curb 30’, BPP size 103’L x 20’W x 3”D
|
2020-10-26
|
No data
|
13 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
13th Ave between 42nd St & 43rd St. Roadway size 80’L x 44’W. BPP size 80’L x 30’W x 3.5”D
|
2020-10-26
|
No data
|
13 AVENUE, FROM STREET 42 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
13th Ave & 42rd Street. Roadway size 45’L x 30’W. BPP size 30’L x 30’W x3”D
|
2020-10-21
|
No data
|
MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB OK
|
2020-10-19
|
No data
|
MYRTLE AVENUE, FROM STREET MARCY AVENUE TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site. 25ft width of 40ft wide roadway is milled for paving. Depth is >3inches. In compliance.
|
2020-10-13
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 9/30/20.
|
2020-10-13
|
No data
|
13 AVENUE, FROM STREET 42 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly competed tangent ramps in the SW1 corner quadrant are functional and accessible. Unable to measure and collect due to weather conditions. Will measure and collect at a later date.
|
2020-10-10
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB IFO 91.
|
2020-10-05
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SW1 corner quadrant found to be non ADA compliant, ramps are functional and accessible. Measured and collected on Prism on 10/5/20.
|
2020-10-02
|
No data
|
13 AVENUE, FROM STREET 42 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started in the SW1 corner quadrant at time of inspection. Will reinspect at a later date.
|
2020-10-02
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected on 9/30/20 in Prism.
|
2020-10-01
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 9/30/20.
|
2020-10-01
|
No data
|
GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Milled Depth- 3 InchesMilled Width- 20 FeetMilled Length- 117 Feet 9 InchesWidth of the Street- 29 Feet 3 Inches
|
2020-09-30
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 9/30/20.
|
2020-09-14
|
No data
|
GERRY STREET, FROM STREET HARRISON AVENUE TO STREET THROOP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance.
|
2020-09-10
|
No data
|
RUTLEDGE STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Paving in compliance.
|
2020-09-10
|
No data
|
FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO PEDESTRIAN WALKWAY ON THE SIDEWALK.
|
2020-09-08
|
No data
|
55 STREET, FROM STREET 14 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: PASS - Length: 86ft 4in Width of Milling: 20ft 10in Full Width of Roadway: 30ft 4in Depth: 4in
|
2020-09-08
|
No data
|
NEW UTRECHT AVENUE, FROM STREET 55 STREET TO STREET 56 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: PASS - Length: 120ft 4in Width of Milling: 27ft 10in Full Width of Roadway: 44ft 7in Depth: 4in
|
2020-09-08
|
No data
|
55 STREET, FROM STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: PASS - Length: 40ft 4in Width of Milling: 30ft 10in Full Width of Roadway: 44ft 6in Depth: 4in
|
2020-09-04
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
B P P Inspection passed size : 50' x 28' x 3''.
|
2020-08-28
|
No data
|
GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk excavated and closed off walkway in roadway
|
2020-08-26
|
No data
|
ERASMUS STREET, FROM STREET LLOYD STREET TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 146 erasmus street
|
2020-08-24
|
No data
|
EVERGREEN AVENUE, FROM STREET GROVE STREET TO STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
there width of the roadway is 34'.6" the contractor milled 159 ft x 22.8 x 4 inches B.P.P requirements met.
|
2020-08-24
|
No data
|
LINDEN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the contractor milled 100 ft x 20.3 ft down 4 inches the width of the roadway is 34 ft PASS
|
2020-08-24
|
No data
|
GROVE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
THE WIDTH OF THE ROADWAY IS 29.7 FT THE MILLED 20 FT X 28.2 DOWN 3 INCHES PASS
|
2020-08-24
|
No data
|
EVERGREEN AVENUE, FROM STREET LINDEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
THE WIDTH OF THE INTERSECTION IS 34 FT THEY MILLED 25 FT X 25 FT DOWN 4 INCHES PASS
|
2020-08-24
|
No data
|
LINDEN STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
THERE IS A VALID PERMIT CONTRACTOR HAVE MILLED THE ROADWAY FOR B.P.P
|
2020-08-20
|
No data
|
OCEAN PARKWAY, FROM STREET AVENUE O TO STREET AVENUE P
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Before milling the width of roadway is 24' 8" Milling length is 118' 3" & Width milled is 20' & Depth is 3". Foreman was on site.
|
2020-07-31
|
No data
|
RUTLEDGE STREET, FROM STREET LEE AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MILLED ROADWAY IFO 219 IS 44FT, 9 INCHES X 22FT, DOWN 3 INCHES. CURB TO CURB IS 33 1.2FT.
|