Search icon

BPRT CONSTRUCTION OF NY LLC

Company Details

Name: BPRT CONSTRUCTION OF NY LLC
Jurisdiction: New York
Legal type: DOMESTIC LIMITED LIABILITY COMPANY
Status: Active
Date of registration: 21 Mar 2019 (6 years ago)
Entity Number: 5518500
ZIP code: 11213
County: Kings
Place of Formation: New York
Address: 1286 prospect place, BROOKLYN, NY, United States, 11213

Agent

Name Role Address
HASSAN BAJWA Agent 1286 prospect place, BROOKLYN, NY, 11213

DOS Process Agent

Name Role Address
THE LLC DOS Process Agent 1286 prospect place, BROOKLYN, NY, United States, 11213

Permits

Number Date End date Type Address
Q042022279A15 2022-10-06 2022-10-20 REPAIR SIDEWALK 89 AVENUE, QUEENS, FROM STREET 196 STREET TO STREET 197 STREET
Q042022279A16 2022-10-06 2022-10-20 REPAIR SIDEWALK 197 STREET, QUEENS, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE

History

Start date End date Type Value
2022-08-08 2024-10-14 Address 1286 prospect place, BROOKLYN, NY, 11213, USA (Type of address: Registered Agent)
2022-08-08 2024-10-14 Address 1286 prospect place, BROOKLYN, NY, 11213, USA (Type of address: Service of Process)
2019-05-06 2022-08-08 Address 108 DELANCY STREET, NEW YORK, NY, 10002, USA (Type of address: Service of Process)
2019-03-21 2022-08-08 Address 108 DELANCEY STREET, NEW YORK, NY, 10002, USA (Type of address: Registered Agent)
2019-03-21 2019-05-06 Address 108 DELANCEY STREET, NEW YORK, NY, 10002, USA (Type of address: Service of Process)

Filings

Filing Number Date Filed Type Effective Date
241014000457 2024-10-14 BIENNIAL STATEMENT 2024-10-14
220808000020 2022-07-25 CERTIFICATE OF CHANGE BY ENTITY 2022-07-25
190730001038 2019-07-30 CERTIFICATE OF PUBLICATION 2019-07-30
190506000863 2019-05-06 CERTIFICATE OF MERGER 2019-05-06
190321010361 2019-03-21 ARTICLES OF ORGANIZATION 2019-03-21

Inspections

Date Inspection Object Address Grade Type Institution Desctiption
2022-11-09 No data 197 STREET, FROM STREET 89 AVENUE TO STREET HILLSIDE AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation No work on permit.
2022-11-09 No data 89 AVENUE, FROM STREET 196 STREET TO STREET 197 STREET No data Street Construction Inspections: Post-Audit Department of Transportation No work on permit.

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
346839863 0215600 2023-07-18 23-30 BORDEN AVENUE, LONG ISLAND CITY, NY, 11101
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2023-07-18
Emphasis L: FALL

Related Activity

Type Inspection
Activity Nr 1684106
Safety Yes
Type Referral
Activity Nr 2054834
Safety Yes
Health Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2023-10-23
Current Penalty 7000.0
Initial Penalty 10938.0
Final Order 2023-12-11
Nr Instances 1
Nr Exposed 3
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1):When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface were not used for access: a.) Site: Site: 23-30 Borden Avenue, Long Island City, NY 11101. On or about July 15, 2023, employees laying bricks on a supported frame scaffold did not have a mean of access or egress to the scaffold. The working level was approximately 12 feet from the ground level. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2023-10-23
Current Penalty 7000.0
Initial Penalty 10938.0
Final Order 2023-12-11
Nr Instances 1
Nr Exposed 3
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolding was not fully planked or decked: Site:23-30 Borden Avenue, Long Island City, NY 11101. a.) On or about July 15, 2023, employees were working from the 2nd tier platform of a supported scaffold, approximately 12-feet above the lower level. The platform was missing two planks, creating a gap of 16 inches. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2023-10-23
Current Penalty 7000.0
Initial Penalty 10938.0
Final Order 2023-12-11
Nr Instances 1
Nr Exposed 3
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee was not protected by the used of personal fall arrest systems or guardrail systems. Site: 23-30 Borden Avenue, Long Island City, NY 11101. a.) On or about July 15, 2023, employees laying bricks from a supported scaffold were not protected from falls by the used of personnel fall arrest systems or guardrails systems. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19
Citation ID 01004
Citaton Type Other
Standard Cited 19260454 A
Issuance Date 2023-10-23
Abatement Due Date 2023-12-11
Current Penalty 4500.0
Initial Penalty 7813.0
Final Order 2023-12-11
Nr Instances 1
Nr Exposed 3
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer did not have each employee who performs work while on a scaffold(s) trained by a person qualified in the subject matter to recognize those hazards associated with the type of scaffold(s) being used and to understand the procedures to control or minimize those hazards. Site: 23-30 Borden Avenue, Long Island City, NY 11101. a.) On or about July 15, 2023, employees working on a supported frame scaffold were exposed to fall hazards. The employer did not provide hazard recognition training to employees installing bricks from a supported frame scaffold. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Citation ID 02001
Citaton Type Other
Standard Cited 19040039 A02
Issuance Date 2023-10-23
Current Penalty 4500.0
Initial Penalty 7813.0
Final Order 2023-12-11
Nr Instances 1
Nr Exposed 4
FTA Current Penalty 0.0
Citation text line 29 CFR 1904.39(a)(2): Within twenty-four (24) hours after the in-patient hospitalization of one or more employees or an employee's amputation or an employee's loss of an eye, as a result of a work-related incident, the employer failed to report the in-patient hospitalization to OSHA. Site: 23-30 Borden Avenue, Long Island City, NY 11101. a.) On or about July 15, 2023, An Employee fell from a scaffold and suffered multiple fractures and lacerations and was transported to the local hospital for treatment. The in-hospitalization was not reported to OSHA. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19

Date of last update: 23 Mar 2025

Sources: New York Secretary of State