Search icon

JJK BUILDING CONSULTING INC

Company Details

Name: JJK BUILDING CONSULTING INC
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 16 Aug 2019 (6 years ago)
Entity Number: 5605909
ZIP code: 11358
County: Queens
Place of Formation: New York
Address: 43-46 UTOPIA PKWY, FLUSHING, NY, United States, 11358

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent 43-46 UTOPIA PKWY, FLUSHING, NY, United States, 11358

Permits

Number Date End date Type Address
Q012025099C10 2025-04-09 2025-04-30 PAVE STREET-W/ ENGINEERING & INSP FEE JUNCTION BOULEVARD, QUEENS, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE
Q012025099C09 2025-04-09 2025-04-30 RESET, REPAIR OR REPLACE CURB JUNCTION BOULEVARD, QUEENS, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE
Q042025099A24 2025-04-09 2025-04-30 CONSTRUCT NEW SIDEWALK BLG. PAVEMENT JUNCTION BOULEVARD, QUEENS, FROM STREET ALSTYNE AVENUE TO STREET CORONA AVENUE
B012025077A93 2025-03-18 2025-03-31 PAVE STREET-W/ ENGINEERING & INSP FEE 56 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
B022025059A99 2025-02-28 2025-05-28 OCCUPANCY OF ROADWAY AS STIPULATED 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
B022025059A98 2025-02-28 2025-05-27 CROSSING SIDEWALK 53 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
Q012025050C28 2025-02-19 2025-03-17 PAVE STREET-W/ ENGINEERING & INSP FEE 215 STREET, QUEENS, FROM STREET 42 AVENUE TO STREET 43 AVENUE
B042025035A08 2025-02-04 2025-03-04 CONSTRUCT NEW SIDEWALK BLG. PAVEMENT 56 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
B012025035A73 2025-02-04 2025-03-04 PAVE STREET-W/ ENGINEERING & INSP FEE 56 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
B012025035A72 2025-02-04 2025-03-05 RESET, REPAIR OR REPLACE CURB 56 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE

History

Start date End date Type Value
2024-05-24 2024-09-12 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-09-22 2024-05-24 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-07-18 2023-09-22 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-01-25 2023-07-18 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-01-06 2023-01-25 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2019-08-16 2023-01-06 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0

Filings

Filing Number Date Filed Type Effective Date
190816010359 2019-08-16 CERTIFICATE OF INCORPORATION 2019-08-16

Inspections

Date Inspection Object Address Grade Type Institution Desctiption
2025-03-31 No data 56 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE No data Street Construction Inspections: Active Department of Transportation Refer to permit B012025035A73 for inspection remarks
2025-03-30 No data 54 AVENUE, FROM STREET 90 STREET TO STREET JUSTICE AVENUE No data Street Construction Inspections: Pick-Up Department of Transportation CAR - to remove tree guards left around two trees on the sidewalk at side of 53-20 90th Street.
2025-03-30 No data 90 STREET, FROM STREET 53 AVENUE TO STREET 54 AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation CAR - to remove tree guard from around tree on the sidewalk.
2025-02-27 No data 215 STREET, FROM STREET 42 AVENUE TO STREET 43 AVENUE No data Street Construction Inspections: Active Department of Transportation • .Milled area – 79’5”x 20’• Depth of milled area – 3” • Curb to Curb width –29’ 12+5’ milled (yes/no) – yes• Waiver (yes/no)-
2025-02-12 No data 56 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE No data Street Construction Inspections: Active Department of Transportation Width of Roadway: 30 feetWidth of milled area: 20 feetLength of milled area: 40 feetDepth of milled area: 3 inchesContractor has milled the roadway in compliance with the required BPP measurements, pass.
2025-01-10 No data GRAND AVENUE, FROM STREET KNEELAND AVENUE TO STREET SIMONSON STREET No data Street Construction Inspections: Active Department of Transportation Occupancy of sidewalk in compliance at this time of inspection.
2024-02-05 No data 191 STREET, FROM STREET 33 AVENUE TO STREET 35 AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation Work not done
2023-12-16 No data 84 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation New curb installed and expansion joints sealed, pass.
2023-08-11 No data 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE No data Street Construction Inspections: Active Department of Transportation (Complaint) Construction site currently has a truck on the street bringing material into the site. They have a flag person on site directing traffic and pedestrians around the work zone.
2023-06-27 No data WHITNEY AVENUE, FROM STREET ELBERTSON STREET TO STREET FORLEY STREET No data Street Construction Inspections: Post-Audit Department of Transportation Steel face curb installed.

Date of last update: 23 Mar 2025

Sources: New York Secretary of State