Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2022-10-20
|
Emphasis |
N: AMPUTATE, N: DUSTEXPL, P: AMPUTATE
|
Case Closed |
2023-03-22
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19100147 C04 I |
Issuance Date |
2022-11-25 |
Abatement Due Date |
2022-12-19 |
Current Penalty |
4000.0 |
Initial Penalty |
4144.0 |
Contest Date |
2022-12-06 |
Final Order |
2023-02-01 |
Nr Instances |
2 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) On or about 10/20/2022, at the Box Line, employees did not utilize lockout procedures when doing maintenance, such as but not limited to, changing air hose on the Case Clamp, exposing employees to amputation hazards if the Case clamp is energized while employees were working on it. b) On or about 10/20/2022, in the Bag House, employees did not utilize lockout procedures when doing maintenance, such as but not limited to, changing the bags of the dust collector, exposing employees to amputation hazards if the dust collector is energized while employees were working on it. ABATEMENT CERTIFICATION REQUIRED |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19100147 C07 I |
Issuance Date |
2022-11-25 |
Abatement Due Date |
2022-12-19 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2022-12-06 |
Final Order |
2023-02-01 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(7)(i): The employer did not provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees: a) On or about 10/20/2022, throughout establishment, Employer did not provide Lockout/Tagout(LOTO) training to authorized employees. Employees performed maintenance and servicing activities on machines such as, but not limited to: Case Clamp and Dust Collector. ABATEMENT CERTIFICATION REQUIRED |
|
Citation ID |
01002 |
Citaton Type |
Other |
Standard Cited |
19100147 C06 I |
Issuance Date |
2022-11-25 |
Abatement Due Date |
2022-12-19 |
Current Penalty |
0.0 |
Initial Penalty |
3315.0 |
Contest Date |
2022-12-06 |
Final Order |
2023-02-01 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) On or about 10/20/2022, throughout establishment, employer did not conduct periodic inspections of the Lockout/Tagout procedures for every employee that locks out machines for servicing or performing maintenance on machines such as but not limited to, CNC Machines, Dust collector and Case Clamp. ABATEMENT CERTIFICATION REQUIRED |
|
|