Search icon

CHAMPION CONSTRUCTION MATERIALS, INC.

Company Details

Name: CHAMPION CONSTRUCTION MATERIALS, INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 20 Apr 2020 (5 years ago)
Entity Number: 5739963
ZIP code: 13619
County: Jefferson
Place of Formation: New York
Address: 35 890 NYS ROUTE 26, CARTHAGE, NY, United States, 13619

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent 35 890 NYS ROUTE 26, CARTHAGE, NY, United States, 13619

Filings

Filing Number Date Filed Type Effective Date
200420010159 2020-04-20 CERTIFICATE OF INCORPORATION 2020-04-20

Mines

Mine Name Type Status Primary Sic
West Carthage Mine Surface Active Lime
Secondary Sic Sand, Common
Directions to Mine Take Route 90 East to 81 North, exit at rte.3 Arsenal St, turn right and follow Rte 3 to Carthage, left onto Rte 26 South, mine will be on the right.

Parties

Name Champion Materials Inc
Role Operator
Start Date 2002-07-23
End Date 2019-05-23
Name James Madison Construction, Inc.
Role Operator
Start Date 2019-05-24
End Date 2020-05-23
Name Champion Construction Materials, Inc.
Role Operator
Start Date 2020-05-24
End Date 2023-02-06
Name Cranesville Block Co. Inc
Role Operator
Start Date 2023-02-07
Name Champion Sand & Gravel Inc
Role Operator
Start Date 1985-04-01
End Date 1992-05-28
Name Champion Rock Products Inc
Role Operator
Start Date 1992-05-29
End Date 2002-07-22
Name Joseph Charles Tesiero; John A Tesiero III
Role Current Controller
Start Date 2023-02-07
Name Cranesville Block Co. Inc
Role Current Operator

Accidents

Accident Date 2024-08-05
Degree Inhury ACCIDENT ONLY
Accident Type Accident type, without injuries
Ocupation NO VALUE FOUND
Narrative MINER WAS MAKING ROAD WIDER WHEN LOADER TIRE WENT IN DEEP HOLE AND FLIPPED OVER.
Accident Date 2024-03-14
Degree Inhury DAYS AWAY FROM WORK ONLY
Accident Type Struck by... NEC
Ocupation Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
Narrative Grinder kicked back and caught pants which led to it cutting through my pants into my leg
Accident Date 2010-11-18
Degree Inhury DAYS AWAY FROM WORK ONLY
Accident Type Struck by falling object
Ocupation Ledgeman/hand, Quarry man
Narrative EE was attempting to clean out under our wash plant when he was struck by a rock from our power screen conveyor.
Accident Date 2009-04-02
Degree Inhury DAYS AWAY FROM WORK ONLY
Accident Type Fall to the walkway or working surface
Ocupation Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
Narrative Dump truck tires blew up and pushed the outside tire, causing it to blow off the vehicle. Other Employee was stuck by the tire but suffered no injury. Injury was standing in the proximity and in response to the tire blowing off the vehicle, turned abruptly, fell and fractured his wrist while attmpting to break his fall. He was not struck by the tire.
Accident Date 2000-08-01
Degree Inhury NO DYS AWY FRM WRK,NO RSTR ACT
Accident Type Struck by... NEC
Ocupation Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
Narrative REPLACING SCREEN ON WASH PLANT, EMPLOYEE'S FINGER (FOURTH NEXT TO PINKY ON RIGHT HAND) WAS CUT BY THE EDGE OF SCREEN AS IT WAS GOING INTO PLACE. 13 STITCHES REQUIRED.

Inspections

Start Date 2024-08-08
End Date 2024-08-08
Activity Spot Inspection
Number Inspectors 1
Total Hours 8
Start Date 2024-05-22
End Date 2024-05-22
Activity Special Emphasis Programs
Number Inspectors 1
Total Hours .75
Start Date 2024-03-27
End Date 2024-03-29
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 13
Start Date 2023-05-15
End Date 2023-05-16
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 22.25
Start Date 2022-08-29
End Date 2022-08-29
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 4.75
Start Date 2022-04-04
End Date 2022-04-07
Activity Compliance Follow-up Inspection
Number Inspectors 1
Total Hours 25.5
Start Date 2021-10-21
End Date 2021-10-21
Activity Compliance Follow-up Inspection
Number Inspectors 1
Total Hours 11
Start Date 2021-10-13
End Date 2021-10-14
Activity Compliance Follow-up Inspection
Number Inspectors 1
Total Hours 5.25
Start Date 2021-09-23
End Date 2021-09-24
Activity Spot Inspection
Number Inspectors 1
Total Hours 27.25
Start Date 2021-08-04
End Date 2021-08-05
Activity Compliance Follow-up Inspection
Number Inspectors 1
Total Hours 9.25
Start Date 2021-07-14
End Date 2021-07-21
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 48.5
Start Date 2020-06-16
End Date 2020-06-16
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 3.75
Start Date 2020-01-21
End Date 2020-01-21
Activity Spot Inspection
Number Inspectors 2
Total Hours 2.75
Start Date 2019-07-25
End Date 2019-07-25
Activity Compliance Follow-up Inspection
Number Inspectors 1
Total Hours 5.75
Start Date 2019-07-15
End Date 2019-07-17
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 14.25
Start Date 2018-05-30
End Date 2018-05-30
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 7.5
Start Date 2017-07-05
End Date 2017-07-05
Activity Compliance Follow-up Inspection
Number Inspectors 1
Total Hours 4.25
Start Date 2017-06-14
End Date 2017-06-20
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 22.75
Start Date 2015-10-08
End Date 2015-10-08
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 13.5
Start Date 2015-06-15
End Date 2015-06-18
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 17.5

Productions

Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2024
Annual Hours 18650
Annual Coal Prod 0
Avg. Annual Empl. 10
Avg. Employee Hours 1865
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2024
Annual Hours 1524
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1524
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2023
Annual Hours 8326
Annual Coal Prod 0
Avg. Annual Empl. 8
Avg. Employee Hours 1041
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2023
Annual Hours 1560
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1560
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2022
Annual Hours 20
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 20
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2021
Annual Hours 774
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 194
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2019
Annual Hours 40
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 40
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2017
Annual Hours 1671
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 836
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2016
Annual Hours 7055
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 1764
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2016
Annual Hours 1426
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 713
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2015
Annual Hours 6014
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 1504
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2015
Annual Hours 1375
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1375
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2014
Annual Hours 2968
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 742
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2014
Annual Hours 1167
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1167
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2013
Annual Hours 2079
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 520
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2013
Annual Hours 614
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 307
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2012
Annual Hours 4781
Annual Coal Prod 0
Avg. Annual Empl. 8
Avg. Employee Hours 598
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2012
Annual Hours 436
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 218
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2011
Annual Hours 1498
Annual Coal Prod 0
Avg. Annual Empl. 3
Avg. Employee Hours 499
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2011
Annual Hours 5477
Annual Coal Prod 0
Avg. Annual Empl. 7
Avg. Employee Hours 782

Motor Carrier Census

USDOT Number Carrier Operation MCS-150 Form Date MCS-150 Mileage MCS-150 Year Power Units Drivers Operation Classification
3429740 Intrastate Non-Hazmat 2021-03-23 - - 1 1 Private(Property)
Legal Name CHAMPION CONSTRUCTION MATERIALS INC
DBA Name -
Physical Address 35890 STATE RT 26, CARTHAGE, NY, 13619, US
Mailing Address 35890 STATE RT 26, CARTHAGE, NY, 13619, US
Phone (315) 519-1717
Fax -
E-mail HEATHER@UHLINGERCC.COM

Safety Measurement System - All Transportation

Total Number of Inspections for the measurement period (24 months) 0
Driver Fitness BASIC Serious Violation Indicator No
Vehicle Maintenance BASIC Acute/Critical Indicator No
Unsafe Driving BASIC Acute/Critical Indicator No
Driver Fitness BASIC Roadside Performance measure value 0
Hours-of-Service (HOS) Compliance BASIC Roadside Performance measure value 0
Total Number of Driver Inspections for the measurment period 0
Vehicle Maintenance BASIC Roadside Performance measure value 0
Total Number of Vehicle Inspections for the measurement period 0
Controlled Substances and Alcohol BASIC Roadside Performance measure value 0
Unsafe Driving BASIC Roadside Performance Measure Value 0
Number of inspections with at least one Driver Fitness BASIC violation 0
Number of inspections with at least one Hours-of-Service BASIC violation 0
Total Number of Driver Inspections containing at least one Driver Out-of-Service Violation 0
Number of inspections with at least one Vehicle Maintenance BASIC violation 0
Total Number of Vehicle Inspections containing at least one Vehicle Out-of-Service violation 0
Number of inspections with at least one Controlled Substances and Alcohol BASIC violation 0
Number of inspections with at least one Unsafe Driving BASIC violation 0

Date of last update: 22 Mar 2025

Sources: New York Secretary of State