Search icon

J&C HOME RENOVATIONS INC.

Company Details

Name: J&C HOME RENOVATIONS INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 24 Aug 2021 (4 years ago)
Entity Number: 6265870
ZIP code: 12550
County: Orange
Place of Formation: New York
Address: 23 FARRINGTON ST, NEWBURGH, NY, United States, 12550

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
J&C HOME RENOVATIONS INC. DOS Process Agent 23 FARRINGTON ST, NEWBURGH, NY, United States, 12550

History

Start date End date Type Value
2021-08-24 2024-03-29 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0

Filings

Filing Number Date Filed Type Effective Date
210824002626 2021-08-24 CERTIFICATE OF INCORPORATION 2021-08-25

Fine And Fees

Fee Sequence Id Fee type Status Date Amount Description
86357 PL VIO INVOICED 2008-09-19 3500 PL - Padlock Violation

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
347889073 0213100 2024-11-19 1115 MAIN ST., FISHKILL, NY, 12524
Inspection Type Referral
Scope Complete
Safety/Health Safety
Close Conference 2024-11-19
Emphasis N: FALL

Related Activity

Type Referral
Activity Nr 2234829
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 A06
Issuance Date 2024-12-19
Current Penalty 20074.2
Initial Penalty 3457.0
Final Order 2025-01-15
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building: On or about November 19, 2024, the employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. Employees were performing brick work on the fourth tier of the first section of a tubular welded frame scaffold. The working level had two wood planks approximately 18 inches wide. The working level was not fully planked. the employees were exposed to falling approximately 28-feet to the ground.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2024-12-19
Current Penalty 2074.2
Initial Penalty 3457.0
Final Order 2025-01-15
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building: On or about November 19, 2024, the employer did not ensure that all working levels of the tubular welded frame scaffold used by employees were fully planked. Employees were performing brick work on the fourth tier of the first section of a tubular welded frame scaffold. The working level had two wood planks approximately 18 inches wide. The working level was not fully planked. the employees were exposed to falling approximately 28-feet to the ground.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2024-12-19
Current Penalty 2074.2
Initial Penalty 3457.0
Final Order 2025-01-15
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access: a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building - On or about November 19, 2024, employees were accessing the fourth level of the tubular welded frame scaffold approximately 28-feet above by climbing the walk through frames and crossbraces. employees were not provided with access to the scaffold platforms.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260451 G01
Issuance Date 2024-12-19
Current Penalty 2074.2
Initial Penalty 3457.0
Final Order 2025-01-15
Nr Instances 2
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level: a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building: On or about November 19, 2024, an employee performing brick work on the fourth tier of the first section of a tubular welded frame scaffold approximately 28-feet above the ground and was not provided with any means of fall protection. b) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building: On or about November 19, 2024, employees performing brick work on the fourth tier of the third section of a tubular welded frame scaffold, were not provided with adequate fall protection. The employees were exposed to a fall of up to 28 feet above the ground.
Citation ID 01005A
Citaton Type Serious
Standard Cited 19260451 F03
Issuance Date 2024-12-19
Current Penalty 3457.0
Initial Penalty 3457.0
Final Order 2025-01-15
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building: On or about November 19, 2024, employees were performing brick work from the fourth tier of a tubular welded frame scaffold that had not been inspected by a competent person.
Citation ID 01005B
Citaton Type Serious
Standard Cited 19260454 A
Issuance Date 2024-12-19
Abatement Due Date 2025-01-24
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2025-01-15
Nr Instances 2
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) Worksite, 1115 Main St., Fishkill, NY, scaffold erected in front of building: On or about November 19, 2024, employees were performing brick work from the fourth tier of a tubular welded frame scaffold and were not trained by a qualified person.

Date of last update: 21 Mar 2025

Sources: New York Secretary of State