Search icon

PINE HILL MATERIALS CORP.

Company Details

Name: PINE HILL MATERIALS CORP.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Inactive
Date of registration: 01 Jul 1949 (76 years ago)
Date of dissolution: 03 Jun 2003
Entity Number: 62958
ZIP code: 14211
County: Erie
Place of Formation: New York
Address: 2255 BAILEY AVENUE, BUFFALO, NY, United States, 14211

Shares Details

Shares issued 1000

Share Par Value 0

Type NO PAR VALUE

Chief Executive Officer

Name Role Address
MARK KAHLE Chief Executive Officer 19 BOBBIE LANE, WILLIAMSVILLE, NY, United States, 14221

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent 2255 BAILEY AVENUE, BUFFALO, NY, United States, 14211

History

Start date End date Type Value
1993-04-15 1999-07-28 Address 9 BOBBIE LANE, WILLIAMSVILLE, NY, 14221, USA (Type of address: Chief Executive Officer)
1949-07-01 1999-09-13 Shares Share type: NO PAR VALUE, Number of shares: 1000, Par value: 0
1949-07-01 1993-04-15 Address 2255 BAILEY AVE, BUFFALO, NY, 14211, USA (Type of address: Service of Process)

Filings

Filing Number Date Filed Type Effective Date
030603000592 2003-06-03 CERTIFICATE OF DISSOLUTION 2003-06-03
010705002693 2001-07-05 BIENNIAL STATEMENT 2001-07-01
990913000164 1999-09-13 CERTIFICATE OF AMENDMENT 1999-09-13
990728002503 1999-07-28 BIENNIAL STATEMENT 1999-07-01
970711002386 1997-07-11 BIENNIAL STATEMENT 1997-07-01
960529000489 1996-05-29 CERTIFICATE OF AMENDMENT 1996-05-29
000051002007 1993-10-01 BIENNIAL STATEMENT 1993-07-01
930415002560 1993-04-15 BIENNIAL STATEMENT 1992-07-01
B441666-3 1986-12-31 CERTIFICATE OF MERGER 1986-12-31
A791302-2 1981-08-20 ASSUMED NAME CORP INITIAL FILING 1981-08-20

Mines

Mine Name Type Status Primary Sic
LANCASTER PLANT E Surface Abandoned Construction Sand and Gravel
Directions to Mine Rt 79 N to I 90 East to exit 49, take Rt. 78 South turn left on Rt. 33 East, go 4.3 miles, mine on right.

Parties

Name Lafarge North America Incorporated
Role Operator
Start Date 2001-08-07
Name Pine Hill Materials Corp
Role Operator
Start Date 1950-01-01
End Date 2001-08-06
Name Holcim Ltd
Role Current Controller
Start Date 2001-08-07
Name Lafarge North America Incorporated
Role Current Operator

Accidents

Accident Date 2003-06-27
Degree Inhury OCCUPATNAL ILLNESS NOT DEG 1-6
Accident Type Over-exertion NEC
Ocupation Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
Narrative CARPAL TUNNEL RELEASE SURGERY ON R-WRIST ON 6-27-03. FIRST DIAGNOSE ON 11-29-01. EE ALLEGES INJURY TO BE CAUSED BY REPETITIVE MOTOR OF OPERATING CONTROL OF EQUIPMENT.
Accident Date 2001-11-29
Degree Inhury OCCUPATNAL ILLNESS NOT DEG 1-6
Accident Type Over-exertion NEC
Ocupation Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
Narrative DIAGNOSED BY DOCTOR AS HAVING CARPAL TUNNEL IN BOTH WRISTS. EMPLOYEE ALLEGES INJURY TO BE CAUSED BY REPETITIVE MOTION OF OPERATING CONTROLS OF EQUIPMENT.
Accident Date 2001-10-11
Degree Inhury NO DYS AWY FRM WRK,NO RSTR ACT
Accident Type Struck by... NEC
Ocupation Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
Narrative EMPLOYEE WAS CUTTING CONVEYOR BELTING WHEN THE TOOL SLIPPED AND CAUGHT HIS LEFT FOREARM, RESULTING IN LACERATION WHICH REQUIRED SUTURES.
Accident Date 2001-10-06
Degree Inhury NO DYS AWY FRM WRK,NO RSTR ACT
Accident Type Struck by flying object
Ocupation Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
Narrative GRINIDNG ON METAL FEEDER WHEN EE REMOVED SAFETY GOGGLES, A PIECE OF METAL BLEW INTO LEFT EYE.
Accident Date 2001-09-24
Degree Inhury DYS AWY FRM WRK & RESTRCTD ACT
Accident Type Over-exertion NEC
Ocupation Coal/ore shovel operator, Shoveler, Power shoveler
Narrative EE STOOD UP TO EXIT EQUIPMENT AND FELT HIS LOWERBACK START TO ACHE.
Accident Date 2001-08-15
Degree Inhury PERM TOT OR PERM PRTL DISABLTY
Accident Type Over-exertion NEC
Ocupation Miner, NEC
Narrative EE WAS REPAIRING A HOLE IN A 10 INCH DIA RUBBER WATERLINE. EE BENT OVER TO WORK ON RUBBERLINE. HE PICKED UP A SECTION OF THE HOSE AND FELT A PAIN IN HIS GROIN AREA.
Accident Date 2001-05-15
Degree Inhury NO DYS AWY FRM WRK,NO RSTR ACT
Accident Type Struck by falling object
Ocupation Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
Narrative EE WAS REMOVING SCREEN CLOTH FROM SCREEN. CLOTH CAUGHT ON PANEL TAILGATE. EE TIPPED SCREEN AND DROPPED IT ON HIS LEFT INDEX FINGER (LACERATION)
Accident Date 2001-05-04
Degree Inhury NO DYS AWY FRM WRK,NO RSTR ACT
Accident Type Caught in, under or between NEC
Ocupation Assayer, Geologist, Metallurgist, Engineer, Engineer management
Narrative EMPLOYEE WAS CHANGING THE FEED DISTRIBUTION TO SECONDARY CRUSHER BY CLOSING A FLOP GATE. HIS RIGHT HAND WAS PINCHED WHEN HE WAS CLOSING THE GATE BETWEEN THE HANDLE AND THE STOP.
Accident Date 2000-11-10
Degree Inhury DAYS AWAY FROM WORK ONLY
Accident Type Struck against stationary object
Ocupation Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
Narrative EE WAS WALKING ON GRAVEL GROUND AND ROLLED HIS LEFT ANKLE BY STEPPING ON A LARGE ROCK. HE SPRAINED THE ANKLE.

Inspections

Start Date 2005-07-14
End Date 2005-07-14
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 7
Start Date 2005-01-12
End Date 2005-01-12
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 9
Start Date 2004-04-13
End Date 2004-04-13
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 14
Start Date 2003-10-09
End Date 2003-10-16
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 35
Start Date 2003-04-22
End Date 2003-04-25
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 40
Start Date 2002-11-12
End Date 2002-11-15
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 32
Start Date 2002-07-02
End Date 2002-07-08
Activity SPECIAL ENFORCEMENT 3
Number Inspectors 1
Total Hours 5
Start Date 2002-07-02
End Date 2002-07-09
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 39
Start Date 2002-01-23
End Date 2002-01-24
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 26
Start Date 2000-11-16
End Date 2000-11-29
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 28
Start Date 2000-11-16
End Date 2000-11-29
Activity MISCELLANEOUS INSPECTION/INVESTIGATION
Number Inspectors 1
Total Hours 5
Start Date 2000-07-24
End Date 2000-07-27
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 18
Start Date 2000-05-08
End Date 2000-05-11
Activity REGULAR INSPECTION
Number Inspectors 2
Total Hours 42

Productions

Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2005
Annual Hours 1991
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 996
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2005
Annual Hours 270
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 270
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2004
Annual Hours 3796
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 1898
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2004
Annual Hours 1224
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1224
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2003
Annual Hours 19109
Annual Coal Prod 0
Avg. Annual Empl. 9
Avg. Employee Hours 2123
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2003
Annual Hours 4653
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 2327
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2002
Annual Hours 36224
Avg. Annual Empl. 16
Avg. Employee Hours 2264
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2002
Annual Hours 4398
Avg. Annual Empl. 2
Avg. Employee Hours 2199
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2001
Annual Hours 45364
Avg. Annual Empl. 19
Avg. Employee Hours 2388
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2001
Annual Hours 4661
Avg. Annual Empl. 2
Avg. Employee Hours 2331
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2000
Annual Hours 38661
Avg. Annual Empl. 18
Avg. Employee Hours 2148
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2000
Annual Hours 7186
Avg. Annual Empl. 3
Avg. Employee Hours 2395
Jamison Road Pit Surface Abandoned Construction Sand and Gravel
Directions to Mine 2 MI East of Bowen Road on Jamison

Parties

Name Lafarge North America Inc
Role Operator
Start Date 2001-08-07
Name Pine Hill Materials Corp
Role Operator
Start Date 2000-05-01
End Date 2001-08-06
Name Holcim Ltd
Role Current Controller
Start Date 2001-08-07
Name Lafarge North America Inc
Role Current Operator

Inspections

Start Date 2002-10-24
End Date 2002-10-24
Activity SPECIAL ENFORCEMENT 4
Number Inspectors 1
Total Hours 6
Start Date 2002-05-30
End Date 2002-05-30
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 7
Start Date 2001-04-10
End Date 2001-04-10
Activity COMPLIANCE FOLLOW-UP INSPECTION
Number Inspectors 1
Total Hours 4
Start Date 2000-11-15
End Date 2000-11-15
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 9
Start Date 2000-07-24
End Date 2000-07-27
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 17

Productions

Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2002
Annual Hours 1633
Avg. Annual Empl. 2
Avg. Employee Hours 817
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2001
Annual Hours 2267
Avg. Annual Empl. 1
Avg. Employee Hours 2267
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2000
Annual Hours 1360
Avg. Annual Empl. 1
Avg. Employee Hours 1360

Date of last update: 19 Mar 2025

Sources: New York Secretary of State