Name: | THE 1010 CONSTRUCTION GROUP LLC |
Jurisdiction: | New York |
Legal type: | DOMESTIC LIMITED LIABILITY COMPANY |
Status: | Active |
Date of registration: | 06 Apr 2022 (3 years ago) |
Entity Number: | 6451941 |
ZIP code: | 11206 |
County: | Kings |
Place of Formation: | New York |
Address: | 278 Heyward St, Brooklyn, NY, United States, 11206 |
Name | Role | Address |
---|---|---|
THE 1010 CONSTRUCTION GROUP LLC | DOS Process Agent | 278 Heyward St, Brooklyn, NY, United States, 11206 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
220406002641 | 2022-04-06 | ARTICLES OF ORGANIZATION | 2022-04-06 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
347632473 | 0215000 | 2024-02-05 | 1266 50TH STREET, BROOKLYN, NY, 11219 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1732102 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1725624 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260651 I01 |
Issuance Date | 2024-08-02 |
Abatement Due Date | 2024-08-14 |
Current Penalty | 4839.0 |
Initial Penalty | 4839.0 |
Contest Date | 2024-08-26 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Accident |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.651(i)(1): Where the stability of adjoining buildings, walls, or other structures was endangered by excavation operations, support systems such as shoring, bracing or underpinning was not provided to ensure the stability of such structures for the protection of employees. Location: 1266 50th Street, Brooklyn, NY 11219 On or about: February 2, 2024 (a) The employer did not ensure the stability of adjoining walls and structures were not endangered by excavation operations; the employer did not ensure bracing, shoring, or support systems were used while soil from was being removed from the basement. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260754 A |
Issuance Date | 2024-08-02 |
Abatement Due Date | 2024-08-14 |
Current Penalty | 4839.0 |
Initial Penalty | 4839.0 |
Contest Date | 2024-08-26 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Accident |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.754(a): Structural stability shall be maintained at all times during the erection process. Location: 1266 50th Street, Brooklyn, NY 11219 On or about: February 2, 2024 (a) The employer did not ensure that structural stability was maintained at all times; structural stability was adversely affected following the removal of the support structures such as existing walls. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260754 E06 I |
Issuance Date | 2024-08-02 |
Abatement Due Date | 2024-08-14 |
Current Penalty | 4839.0 |
Initial Penalty | 4839.0 |
Contest Date | 2024-08-26 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Accident |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.754(e)(6)(i): A derrick floor shall be fully decked and/or planked and the steel member connections completed to support the intended floor loading. Location: 1266 50th Street, Brooklyn, NY 11219 On or about: February 2, 2024 (a) The employer did not ensure that the 1st floor's steel member connections were completed to support the intended floor loading; materials such as steel joists were placed on the 1st floor which collapsed into the basement level. |
Date of last update: 21 Mar 2025
Sources: New York Secretary of State