Name: | TA CONSTRUCTION USA CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 03 May 2022 (3 years ago) |
Entity Number: | 6475392 |
ZIP code: | 11218 |
County: | Kings |
Place of Formation: | New York |
Address: | 908 AVENUE C, 2ND FL, BROOKLYN, NY, United States, 11218 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
TA CONSTRUCTION USA CORP. | DOS Process Agent | 908 AVENUE C, 2ND FL, BROOKLYN, NY, United States, 11218 |
Start date | End date | Type | Value |
---|---|---|---|
2022-05-03 | 2024-10-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
220503002671 | 2022-05-03 | CERTIFICATE OF INCORPORATION | 2022-05-03 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
347295750 | 0213600 | 2024-02-21 | 308 CROWLEY AVE, BUFFALO, NY, 14207 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 I |
Issuance Date | 2024-06-10 |
Current Penalty | 2664.0 |
Initial Penalty | 2664.0 |
Final Order | 2024-07-09 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide. a) On or about 02/21/2024, during a commercial construction project located at 308 Crowley Ave Buffalo, NY, a supported scaffold in use to apply exterior finish, did not have a fully planked working level. NO ABATEMENT CERTIFICATION REQUIRED |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 C02 I |
Issuance Date | 2024-06-10 |
Current Penalty | 2664.0 |
Initial Penalty | 2664.0 |
Final Order | 2024-07-09 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement. a) On or about 02/21/2024, during a commercial construction project located at 308 Crowley Ave Buffalo, NY, a supported scaffold in use to apply exterior finish was not installed with an adequate firm foundation as required. Scaffold was sitting on damaged metal and wood extending from the building's aging foundation. Employees engaged in masonry work on a supported scaffold also did not have a firm foundation/footing due to a damaged/cracked mud sill. NO ABATEMENT CERTIFICATION REQUIRED |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260451 G04 I |
Issuance Date | 2024-06-10 |
Current Penalty | 2664.0 |
Initial Penalty | 2664.0 |
Final Order | 2024-07-09 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: a) On or about 02/21/2024, during a commercial construction project located at 308 Crowley Ave Buffalo, NY, the employer did not install a guardrail for employees engaged in masonry work in elevations greater than 10 feet (20 feet) above ground level. NO ABATEMENT CERTIFICATION REQUIRED |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19260501 B01 |
Issuance Date | 2024-06-10 |
Current Penalty | 3996.0 |
Initial Penalty | 3996.0 |
Final Order | 2024-07-09 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. a) On or about 2/21/2024, at a commercial construction project located at 308 Crowley Ave Buffalo, NY, an employee engaged in masonry work and working from an unprotected edge of the scaffold platform, 20 feet above ground level, did not have fall protection. NO ABATEMENT CERTIFICATION REQUIRED |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2022-09-14 |
Emphasis | L: FALL, P: FALL |
Related Activity
Type | Inspection |
Activity Nr | 1622999 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260453 B02 V |
Issuance Date | 2022-09-21 |
Current Penalty | 2818.0 |
Initial Penalty | 2818.0 |
Final Order | 2022-10-18 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.453(b)(2)(v): A safety harness with lanyard attached to the boom or basket was not worn by employee(s) working from an aerial lift: a) On or about 9/14/2022 at an apartment building located at 520 Virginia Street, Buffalo, New York; employees were using a boom lift to access work areas while performing masonry work. The employees in the lifts did not have a harnesses with lanyards attached to the boom or basket. NO ABATEMENT CERTIFICATION REQUIRED |
Date of last update: 21 Mar 2025