Name: | JZ GENERAL CONSTRUCTION LLC |
Jurisdiction: | New York |
Legal type: | DOMESTIC LIMITED LIABILITY COMPANY |
Status: | Active |
Date of registration: | 27 Jul 2023 (2 years ago) |
Entity Number: | 6947730 |
ZIP code: | 10965 |
County: | Rockland |
Place of Formation: | New York |
Address: | 67 NORTH MAGNOLIA ST, PEARL RIVER, NY, United States, 10965 |
Name | Role | Address |
---|---|---|
JZ GENERAL CONSTRUCTION | DOS Process Agent | 67 NORTH MAGNOLIA ST, PEARL RIVER, NY, United States, 10965 |
Start date | End date | Type | Value |
---|---|---|---|
2023-07-27 | 2025-01-22 | Address | 67 NORTH MAGNOLIA ST, PEARL RIVER, NY, 10965, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
250122003914 | 2025-01-16 | CERTIFICATE OF PUBLICATION | 2025-01-16 |
230727003665 | 2023-07-27 | ARTICLES OF ORGANIZATION | 2023-07-27 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
339021073 | 0215800 | 2013-04-23 | 120 & 130 WATER ST, PENN YAN, NY, 14527 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 902099 |
Safety | Yes |
Type | Inspection |
Activity Nr | 902065 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19261053 B01 |
Issuance Date | 2013-07-12 |
Current Penalty | 0.0 |
Initial Penalty | 1600.0 |
Contest Date | 2013-08-02 |
Final Order | 2013-12-02 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(1): When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support. |
Citation ID | 02001 |
Citaton Type | Other |
Standard Cited | 19260451 C02 |
Issuance Date | 2013-07-12 |
Abatement Due Date | 2013-07-22 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2013-08-02 |
Final Order | 2013-12-02 |
Nr Instances | 1 |
Nr Exposed | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation. a) At the jobsite, in the basement, on or about 4/23/13: An employee was working from scaffolding which was not resting on baseplates. |
Date of last update: 20 Mar 2025
Sources: New York Secretary of State