342512415
|
0213100
|
2017-08-01
|
1 SCHOOL STREET, FORT EDWARD, NY, 12828
|
|
Inspection Type |
FollowUp
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2017-08-01
|
Case Closed |
2017-10-31
|
Related Activity
Type |
Inspection |
Activity Nr |
998318 |
Safety |
Yes |
|
|
342512456
|
0213100
|
2017-08-01
|
1 SCHOOL STREET, FORT EDWARD, NY, 12828
|
|
Inspection Type |
FollowUp
|
Scope |
Partial
|
Safety/Health |
Health
|
Close Conference |
2017-08-01
|
Case Closed |
2017-11-02
|
Related Activity
Type |
Inspection |
Activity Nr |
998446 |
Health |
Yes |
|
|
342512514
|
0213100
|
2017-08-01
|
1 SCHOOL STREET, FORT EDWARD, NY, 12828
|
|
Inspection Type |
Monitoring
|
Scope |
Partial
|
Safety/Health |
Health
|
Close Conference |
2017-08-01
|
Case Closed |
2018-01-03
|
Related Activity
Type |
Inspection |
Activity Nr |
1010442 |
Safety |
Yes |
|
|
340104421
|
0213100
|
2014-10-14
|
1 SCHOOL STREET, FORT EDWARD, NY, 12828
|
|
Inspection Type |
Unprog Rel
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2014-10-14
|
Emphasis |
N: DUSTEXPL, N: CHEMNEP
|
Case Closed |
2023-04-03
|
Related Activity
Type |
Inspection |
Activity Nr |
998446 |
Health |
Yes |
|
Type |
Inspection |
Activity Nr |
1016006 |
Health |
Yes |
|
Type |
Inspection |
Activity Nr |
998318 |
Safety |
Yes |
|
Type |
Complaint |
Activity Nr |
911082 |
Safety |
Yes |
Health |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
5A0001 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2017-06-30 |
Current Penalty |
7000.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
OSH ACT of 1970 Section (5)(a)(1): Respondent (a) did not ground the ductwork for the Pangborn dust collection system to prevent any static electricity generated by the movement of phenol-formaldehyde resin dust over the metal ducts from becoming a potential ignition source; (b) did not ground the Pangborn dust collector itself to prevent the generation of static electricity from becoming a potential ignition source; (c) did not control sparks generated by the metal chucks of the lathe from striking the metal clamps that secured the phenol-formaldehyde resin balls during shaping, which could travel into the Pangborn dust collection system and ignite the dust; (d) ductwork for the Pangborn dust collection system had 90 degree angle bends where phenol-formaldehyde dust could accumulate and potentially ignite; (e) supported the ducting next to the dust collector with bricks loosely stacked, resulting in breaks in the ductwork, leading to the potential release of phenol-formaldehyde resin dust; and (f) did not provide explosion relief venting for the Pangborn dust collection system to prevent a fire in the collector from traveling back into the building through the duct work. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19100106 H04 I D |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
7000.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.106(h)(4)(i)(d): Three (55) gallon drums of a 37% solution of formaldehyde, a Class 4 flammable liquid were stored on the first floor in a room that did not meet the requirements for an inside storage room as outlined in 1910.106(d)(4)(I). |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19100106 H06 II D |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-09-06 |
Current Penalty |
5000.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.106(h)(6)(ii)(d): The processing area on the second floor of the building above the kettles being used to manufacture phenol-formaldehyde resins (where the formaldehyde being used to make the resin was a 37% solution classified as a Class 4 flammable liquid) was not equipped with an approved automatic sprinkler system or equivalent system. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19100106 H06 III |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-07-06 |
Current Penalty |
2000.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.106(h)(6)(iii): An alarm system to notify workers in the plant and for contacting the local fire department had not been established and is required due to the use of 37% formaldehyde, a Class 4 flammable liquid in 55 gallon drums at the facility. A procedure for notifying the workers and the local fire department will be developed in the emergency action plan and all employees will receive training on the procedures in the emergency action plan. |
|
Citation ID |
01005 |
Citaton Type |
Serious |
Standard Cited |
19100106 H07 I A |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-04-06 |
Current Penalty |
5000.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.106(h)(7)(i)(a): The metal suction fill pipe used to draw formaldehyde under vacuum from a plastic 55 gallon drum into kettle #3 was not grounded during transfer to prevent static electricity from being generated. |
|
Citation ID |
01006 |
Citaton Type |
Serious |
Standard Cited |
19100119 C01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
7000.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(c)(1): Respondent did not develop a written plan of action for employee participation in process safety management. |
|
Citation ID |
01006B |
Citaton Type |
Serious |
Standard Cited |
19100119 D02 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
5 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(d)(2)(i): Process safety information pertaining to the technology of the process did not include the elements specified in 29 CFR 1910.119(d)(2)(i)(A) through (E): (a) On or about October 3, 2014, at the facility, the employer failed to compile process safety information pertaining to the technology of the process used to manufacture phenol-formaldehyde resins including but not limited to: 1) A block flow diagram or simplified process flow diagram 2) Maximum intended inventory for formaldehyde 3) Safe upper and lower limits for operating under vacuum pressure for kettle #3 4) Safe upper and lower limits for operating under vacuum pressure and temperature for kettle #4 5) An evaluation of the consequences of deviations, including those affecting the safety and health of employees |
|
Citation ID |
01006C |
Citaton Type |
Serious |
Standard Cited |
19100119 D03 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(d)(3)(i): Process safety information pertaining to the equipment in the process did not include the elements specified in 29 CFR 1910.119(d)(3)(i)(A) through (H): (a) On or about October 3, 2014, at the facility, the employer failed to compile process safety information pertaining to the technology of the process used to manufacture phenol-formaldehyde resins including but not limited to: 1) Materials of construction for kettles #3 and#4 2) Materials of construction for the packing material installed on the primary vacuum pump 2) Piping and instrument diagrams 3) Electrical classification 4) Design codes and standards employed |
|
Citation ID |
01006D |
Citaton Type |
Serious |
Standard Cited |
19100119 D03 II |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complied with recognized and generally accepted good engineering practices: a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The faceplate identifying the manufacturer, the vessel, and design specifications was missing. The faceplate is required to be present on the vessel as required under such as, but not limited to API 620-2008, "Design and Construction of Large, Welded, Low-Pressure Storage Tanks, section 1.1. (b) On or about October 3, 2014, at the facility, kettle #3 and kettle #4 was designed and built as a pressure vessel by the manufacturer. They were modified after manufacturing and hydrostatic testing to operate under vacuum pressure in this production process. The employer did not subject the vessels to pressure and vacuum testing after this alteration as required under such as, but not limited to API 572-2009, "Inspection Practices for Pressure Vessels," section 9.7.2. (c) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting resin into custom sized balls. The steam and vacuum piping including valves throughout the processing equipment were not labeled as to their identity and the direction of flow using the requirements outlined in such as, but not limited to ASME A13.1-2007, "Scheme for the Identification of Piping Systems". (d) On or about October 3, at this facility, for employees manufacturing phenol-formaldehyde resins and casting resin into custom sized balls. Kettles #3 and #4 were not equipped with safe valves to relieve pressure, if over pressurization occurred in these low pressure reactors during this exothermic reaction. The requirement to install pressure-relieving valves and emergency vacuum-reliving valves is covered under the requirements outlined in such as, but not limited to API Standard 620-2008, " Design and Construction of Large, Welded, Low Pressure Storage Tanks," section |
|
Citation ID |
01006E |
Citaton Type |
Serious |
Standard Cited |
19100119 E01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(e)(1): The employer did not perform an initial process hazard analysis (hazard evaluation) on processes covered by 29 CFR 1910.119: a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The employer had not performed an initial process hazard analysis for the storage of the formaldehyde and the process of manufacturing the phenol-formaldehyde resins. The employer is covered under 1910.119 because more than 1,000 lbs of formaldehyde were observed in storage on the first floor of the building on October 3, 2014. |
|
Citation ID |
01006F |
Citaton Type |
Serious |
Standard Cited |
19100119 F01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information and which addressed elements listed in 29 CFR 1910.119(f)(1)(i) through (f)(1)(v): (a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The employer did not develop and implement operating procedures for operating phases including initial startup, temporary operations, normal operations for kettle #4, emergency shutdown, emergency operations, normal shutdown, and startup following a turnaround, or after an emergency shutdown. |
|
Citation ID |
01006G |
Citaton Type |
Serious |
Standard Cited |
19100119 F04 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(f)(4): The employer did not develop and implement safe work practices to provide for the control of hazards during operations such as lockout/tagout; confined space entry; opening process equipment or piping; and control over entrance into a facility by maintenance, contractor, laboratory, or other support personnel: (a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The employer had not developed and implemented safe work practices to provide for the control of lockout hazards encountered while employees perform servicing and maintenance on process equipment and opened process equipment to replace valves. The employer is covered under 1910.119 because more than 1,000 lbs of formaldehyde were observed in storage on the first floor of the building on October 3, 2014. |
|
Citation ID |
01006H |
Citaton Type |
Serious |
Standard Cited |
19100119 I01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(i)(1): The employer did not perform a pre-startup safety review for new facilities and for modified facilities when the modification was significant enough to require a change in the process safety information: (a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The employer did not perform a pre-startup safety review after the Kinney portable backup vacuum pump was connected to the process. The employer is covered under 1910.119 because they store more than the threshold quantity of 1,000 lbs of formaldehyde on site. |
|
Citation ID |
01006I |
Citaton Type |
Serious |
Standard Cited |
19100119 J02 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The employer had not established written procedures to maintain the on-going integrity of process equipment used to manufacture the resin such as the two pressure vessels, the steam, water and vacuum piping including the valves, the relief system on the Weil Mclain boiler, the emergency shutdown switches for the boiler, the manual steam gauges located on the boiler and in the processing area and the two Kinney vacuum pumps. The employer is covered under 1910.119 because more than 1,000 lbs of formaldehyde were observed in storage on the first floor of the building on October 3, 2014. |
|
Citation ID |
01006J |
Citaton Type |
Serious |
Standard Cited |
19100119 J03 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(j)(3):The employer did not train each employee involved in maintaining the on-going integrity of process equipment in an overview of that process and its hazards and in the procedures applicable to the employee's job tasks to assure that the employee could perform the job tasks in a safe manner: a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The employer had not conducted training for employees involved in maintaining the on-going integrity of process equipment used to manufacture the resin such as the two pressure vessels, the steam, water and vacuum piping including the valves, the relief system on the Weil Mclain boiler, the emergency shutdown switches for the boiler, the manual steam gauges located on the boiler and in the processing area and the two Kinney vacuum pumps. The employer is covered under 1910.119 because more than 1,000 lbs of formaldehyde were observed in storage on the first floor of the building on October 3, 2014. |
|
Citation ID |
01006K |
Citaton Type |
Serious |
Standard Cited |
19100119 J04 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment: (a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The employer did not develop and implement an inspection plan for the two pressure vessels as outlined in documents such as but not limited to API 572-2009, " Inspection Practices for Pressure Vessels", section 6. (b) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins and casting the resin into custom sized balls. The Weil-McLain low-pressure steam boiler, Boiler EG/PEG-50, was not inspected either internally or externally as required by New York State Industrial Code Rule 4. This steam boiler is used to supply steam to the two reactors that are manufacturing the phenol-formaldehyde resins. |
|
Citation ID |
01006L |
Citaton Type |
Serious |
Standard Cited |
19100119 L01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(l)(1): The employer did not establish written procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process: (a) On or about October 3, 2014, in the processing area, for the gate valve on kettle #4 used to control steam that was replaced with a Tasco Flocontrol Valve, a combination valve and flow control instrument. The employer did not establish written procedures to manage this change in equipment and procedures. |
|
Citation ID |
01006M |
Citaton Type |
Serious |
Standard Cited |
19100119 N |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.119(n): The employer did not establish an emergency plan for the entire plant in accordance with the provisions of 29 CFR 1910.38: (a) On or about October 3, 2014, at the facility, for employees manufacturing phenol-formaldehyde resins for casting into custom sized resin balls. The employer did not establish an emergency action plan to address the procedures to follow in the event of a fire and responding to small and large spills of chemicals. The facility handles and stores formaldehyde and phenol in 55 gallon drums. There were 1,118 lbs. of formaldehyde on the site on October 3, 2014. The threshold quantity for formaldehyde requiring coverage under 1910.119 is 1,000 lbs. (b) On or about December 2014, at the facility, for an employee using a fork lift truck to bring a 55 gallon drum of 2-propoxyethanol ordered by Plastic Maritime Corporation, a separate company that leases space from this employer, into their shared storage space on the first floor. The employer did not establish an emergency action plan to address the procedures to follow in the event of a spill of these chemicals during transport. |
|
Citation ID |
01019 |
Citaton Type |
Other |
Standard Cited |
19100132 A |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
1000.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.132(a): Protective equipment was not used by an employee when a hose was used to put out a fire in the outside dust collector. |
|
Citation ID |
01020 |
Citaton Type |
Serious |
Standard Cited |
19100305 G01 IV A |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-21 |
Current Penalty |
0.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: (a) On or about October 14, in the first floor storage area, the Allen Bradley electrical control switch servicing the window mounted wall fan was wired with flexible cord that ran through the exterior wall. (b) On or about October 27, 2014, an extension cord plugged into a junction box was being used as permanent wiring to power a Shop-Vac. |
|
|
339994410
|
0213100
|
2014-10-09
|
1 SCHOOL STREET, FORT EDWARD, NY, 12828
|
|
Inspection Type |
Unprog Rel
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2014-10-09
|
Emphasis |
N: CHEMNEP
|
Related Activity
Type |
Complaint |
Activity Nr |
911082 |
Health |
Yes |
|
|
339984460
|
0213100
|
2014-10-03
|
1 SCHOOL STREET, FORT EDWARD, NY, 12828
|
|
Inspection Type |
Complaint
|
Scope |
Complete
|
Safety/Health |
Health
|
Close Conference |
2014-10-03
|
Case Closed |
2023-04-03
|
Related Activity
Type |
Complaint |
Activity Nr |
911082 |
Safety |
Yes |
Health |
Yes |
|
Type |
Inspection |
Activity Nr |
998318 |
Safety |
Yes |
|
Type |
Inspection |
Activity Nr |
1010442 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Other |
Standard Cited |
19100036 D01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
1000.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.36(d)(1): Respondent did not ensure that the basement double door exit and basement stair landing doors were not padlocked while employees were working in the basement and on the first floor. The basement double door exit was not marked with a reflective Exit sign. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19100037 B02 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-21 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit": (a) On or about October 9, 2014, in the basement, the set of double doors that led directly outside the building was not marked with an "Exit" sign. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19100134 C02 II |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-21 |
Current Penalty |
0.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.134(c)(2)(ii): The employer did not establish and implement those elements of a written program necessary to ensure that any employee using a respirator voluntarily was medically able to use that respirator, and that the respirator was cleaned, stored, and maintained so that its use does not present a health hazard to the user: (a) On or about October 14, 2014, in the first floor storage room, for two employees wearing 3M half face respirators voluntarily while drawing phenol and formaldehyde from 55 gallon drums into kettle #3. The employer did not develop and implement a written respirator program that included the requirements of 1910.134(c)(1)(ii) and 1910.134(c)(1)(v). |
|
Citation ID |
01003A |
Citaton Type |
Serious |
Standard Cited |
19100151 C |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
1000.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.151(c): An ANSI approved emergency eye wash and safety shower were not immediately available (a) in the first floor chemical storage room for workers drawing phenol from 55 gallon drums into kettle #3, and (b) on the second floor, in the processing area for the kettle operator adding 80% lactic acid to the reactor. |
|
Citation ID |
01003B |
Citaton Type |
Other |
Standard Cited |
19101048 I02 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
3 |
Nr Exposed |
9 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1048(i)(2): An ANSI approved emergency eye wash and safety shower were not immediately available (a) in the first floor chemical storage room for workers drawing phenol from 55 gallon drums into kettle#3, and (b) on the second floor, in the processing area, for the kettle operator adding 80% lactic acid to the reactor. |
|
Citation ID |
01003C |
Citaton Type |
Other |
Standard Cited |
19101048 I03 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
3 |
Nr Exposed |
9 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1048(i)(3): An ANSI approved emergency eye wash and safety shower were not immediately available (a) in the first floor chemical storage room for workers drawing phenol from 55 gallon drums into kettle#3, and (b) on the second floor, in the processing area, for the kettle operator adding 80% lactic acid to the reactor. |
|
Citation ID |
01004A |
Citaton Type |
Serious |
Standard Cited |
19100215 A02 |
Issuance Date |
2015-04-01 |
Current Penalty |
0.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.215(a)(2): Abrasive wheel(s) used on grinding machinery were not provided with safety guard(s) which covered the spindle end, nut, flange projections: (a) On or about the week of October 11, 2014, in the basement, for the maintenance employee using a Delta bench grinder that was missing the side guard on the abrasive wheel to sharpen tools such as chisels. |
|
Citation ID |
01004B |
Citaton Type |
Serious |
Standard Cited |
19100215 A04 |
Issuance Date |
2015-04-01 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.215(a)(4): Work rest(s) on grinding machinery were not adjusted closely to the wheel with a maximum opening of one eighth inch: (a) On or about the week of October 11, 2014, in the basement, for the maintenance employee using a Delta bench grinder with a work rest that had an opening between the wheel and the work rest of one inch to sharpen tools such as chisels. |
|
Citation ID |
01004C |
Citaton Type |
Serious |
Standard Cited |
19100215 B09 |
Issuance Date |
2015-04-01 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch: (a) On or about the week of October 11, 2014, in the basement, for the maintenance employee using a Delta bench grinder in which the distance between the abrasive wheel and the top safety guard exceeded one fourth inch to sharpen chisels. |
|
Citation ID |
01006A |
Citaton Type |
Serious |
Standard Cited |
19101200 E01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
5000.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
Related Event Code (REC) |
Complaint |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1200(e)(1): Respondent had not developed a written hazard communication program and implemented a training program for (a) employees manufacturing phenol formaldehyde resin balls which are exposed to hazardous materials such as but not limited to formaldehyde, phenol, combustible resin dust, titanium dioxide caustic soda beads, and acetone, and (be) an employee used a fork lift truck to transport a drum of 2-propocyethanol, a flammable liquid, from a delivery truck into the first floor space leased by Plastic Maritime Corporation. |
|
Citation ID |
01006B |
Citaton Type |
Serious |
Standard Cited |
19101200 H01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1200(h)(1): Respondent had not developed a written hazard communication program and implemented a training program for (a) employees manufacturing phenol formaldehyde resin balls which are exposed to hazardous materials such as but not limited to formaldehyde, phenol, combustible resin dust, titanium dioxide, caustic soda beads, and acetone, and (b) employee used a fork lift truck to transport a drum of 2-propoxyethanol, a flammable liquid, from a delivery truck into the first floor space leased by Plastic Maritime Corporation. |
|
Citation ID |
01006C |
Citaton Type |
Serious |
Standard Cited |
19101048 N01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
9 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1048(n)(1): An ANSI approved emergency eye wash and safety shower were not immediately available (a) in the first floor chemical storage room for workers drawing phenol from 55 gallon drums into kettle#3, and (b) on the second floor, in the processing area, for the kettle operator adding 80% lactic acid to the reactor. |
|
Citation ID |
02001 |
Citaton Type |
Other |
Standard Cited |
19100022 A01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-21 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
2 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms or service rooms were not kept clean and orderly or in a sanitary condition: (a) On or about October 9, 2014, in the shipping room, the one foot square ceiling tiles were loose and hanging from the grid, due to being damaged by water, from a sink that had overflowed in the processing area above. |
|
Citation ID |
02002 |
Citaton Type |
Other |
Standard Cited |
19100134 C02 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-21 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.134(c)(2)(i): Respirator users were not provided with the information contained in Appendix D to 29 CFR 1910.134 when the employer determined that any voluntary respirator use was permissible: (a) On or about October 14, 2014, in the first floor storage room, for two employees wearing 3M half face cartridge respirators while drawing formaldehyde and phenol from 55 gallon drums into kettle #3. (b) On or about October 27, 2014, in the basement, for a worker wearing a 3M 8210 Plus N95 disposable respirator while emptying the waste bin under the saw. |
|
|
339983181
|
0213100
|
2014-10-03
|
1 SCHOOL STREET, FORT EDWARD, NY, 12828
|
|
Inspection Type |
Complaint
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2014-10-03
|
Emphasis |
L: FORKLIFT, N: AMPUTATE
|
Case Closed |
2023-04-03
|
Related Activity
Type |
Complaint |
Activity Nr |
911082 |
Safety |
Yes |
Health |
Yes |
|
Type |
Inspection |
Activity Nr |
998446 |
Health |
Yes |
|
Type |
Inspection |
Activity Nr |
1010442 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
5A0001 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2017-06-30 |
Current Penalty |
7000.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
9 |
Related Event Code (REC) |
Complaint |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
OSH ACT of 1970 Section (5)(a)(1): Respondent's employees were exposed to the hazard of being struck-by the dumbwaiter (a) while it is in motion as a result of the interlocks on the doors being disabled and (b) due to the employer not inspecting and maintaining the dumbwaiter. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19100023 C01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2017-06-30 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
3 |
Nr Exposed |
9 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.23(c)(1): Open-sided floors and/or platforms four feet or more above adjacent floor or ground level were not guarded with standard railings (or equivalent) and toeboards: a) 1st Floor - On or prior to October 3, 2014, the "elevator" (dumb waiter) doorway area did not have a standard railing in place exposing employees to fall hazards of approximately 10 feet. b) 2nd Floor - On or prior to October 3, 2014, the "elevator" (dumb waiter) doorway area did not have a standard railing in place exposing employees to fall hazards of approximately 20 feet. c) 3rd Floor (Attic) - On or prior to October 3, 2014, the "elevator" (dumb waiter) doorway area did not have a standard railing in place exposing employees to fall hazards of approximately 30 feet. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19100022 B01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-05-18 |
Current Penalty |
0.0 |
Initial Penalty |
2400.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-16 |
Nr Instances |
1 |
Nr Exposed |
1 |
Related Event Code (REC) |
Complaint |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.22(b)(1): Aisles and passageways were not kept clear and in good repair, with no obstruction across or in aisles that could create a hazard: a) 2nd Floor Lab - On or about October 3, 2014, a metal beam (measuring approximately 4 inch high by 144 inch in length with 6 bolts up to 3.5 inches high) was bolted to the floor creating a trip hazard for employees that transport caustic chemicals over the beam. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19100023 D01 IV |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-27 |
Current Penalty |
1000.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-16 |
Nr Instances |
3 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.23(d)(1)(iv): On stairways more than 44 inches wide but less than 88 inches wide, did not have one handrail on each enclosed side and one stair railing on each open side: a) Top Attic Stairway - On or about October 3, 2014, an approximately 30 inch section of stairway did not have a stair railing on a section of the left side (when descending) of the stairway and a handrail on the right side (when descending) of the stairway exposing employees to fall hazards. The staircase was approximately 61 inches wide with 11 steps each approximately 7 inches high. b) Bottom Attic Stairway - On or about October 3, 2014, an approximately 61 inch wide staircase with 12 steps each approximately 7 inches high did not have a handrail on the right side (when descending) of the stairway. c) Basement Stairway - On or about October 3, 2014, an approximately 64 inch wide staircase with 11 steps did not have a handrail on the right side (when descending) of the stairway. |
|
Citation ID |
01003A |
Citaton Type |
Serious |
Standard Cited |
19100023 A01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-20 |
Current Penalty |
0.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-16 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.23(a)(1): Every stairway floor opening was not guarded by a standard railing constructed in accordance with paragraph (e) of this section on all exposed sides (except at the entrance to the stairway): a) Basement Stairway - On or about October 3, 2014, a stairway floor opening did not have a standard railing exposing employees to fall hazards. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19100023 A08 II |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-27 |
Current Penalty |
0.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.23(a)(8)(ii): Every floor hole into which persons could accidentally walk were not guarded by a floor hole cover of standard strength and construction: a) Lab on 2nd Floor - On or prior to October 27, 2014, the area by the cooling coils did not have a floor hole cover in place for the gap between the kettle and floor. |
|
Citation ID |
01006 |
Citaton Type |
Serious |
Standard Cited |
19100024 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-05-18 |
Current Penalty |
0.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.24(i): Vertical clearance above the stair tread to an overhead obstruction was not at least 7 feet measured from the leading edge of the tread: a) Stairway leading to the attic - On or about October 3, 2014, there was a 4' 11" inch high obstructive overhead metal beam measured from the 3rd step down from the top of the staircase, which is directly under the metal beam. |
|
Citation ID |
01007 |
Citaton Type |
Serious |
Standard Cited |
19100036 G01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-05-18 |
Current Penalty |
0.0 |
Initial Penalty |
1200.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
4 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.36(g)(1): Ceiling of an exit route was not at least seven feet six inches. Any projection from the ceiling must not reach a point less than six feet eight inches from the floor. a) Basement - On or about October 3, 2014, there was a metal pipe that measures to approximately 5' 5" inches to the bottom of the pipe from the ground that was directly in an exit route. |
|
Citation ID |
01008A |
Citaton Type |
Serious |
Standard Cited |
19100147 C01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
2000.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
5 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(1): Respondent does not have a lock-out/tag-out program for equipment such as but not limited to A Bank and B Bank tumblers, Lathe 1 and 2, Drill Presses 1,2,3, and 4, centerless grinders, and Cup Machine in the tumbler room and the drill press room. |
|
Citation ID |
01008B |
Citaton Type |
Serious |
Standard Cited |
19100147 C04 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-06-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
3 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Tumbler Room - On or about October 3, 2014, specific procedures were not developed, documented and utilized for Lathe 1 and Lathe 2 which have 2 sources of energy consisting of electricity and air. b) Drill Press Room - On or about October 3, 2014, specific procedures were not developed, documented and utilized for the centerless grinders which have 2 sources of energy consisting of electricity and water. c) Drill Press Room - On or about October 3, 2014, specific procedures were not developed, documented and utilized for the Cup Machine which has 2 sources of energy consisting of electricity and air. |
|
Citation ID |
01008C |
Citaton Type |
Serious |
Standard Cited |
19100147 C05 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
5 |
Nr Exposed |
10 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(5)(i): Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware were not provided by the employer for isolating, securing or blocking of machines or equipment from energy sources: a) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on both the A Bank and B Bank tumblers. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. b) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on Lathe 1 and Lathe 2. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. c) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on Drill Presses 1, 2, 3, and 4. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. d) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the centerless grinders. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. e) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the Cup Machine. The company does not provide locks or tags to employees to ensure the energy is isolated, secured, or blocked. |
|
Citation ID |
01008D |
Citaton Type |
Serious |
Standard Cited |
19100147 C07 I A |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
2800.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
5 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation and control: a) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on both the A Bank and B Bank tumblers. The company does not provide training to authorized employees on lockout/tagout. b) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on Lathe 1 and Lathe 2. The company does not provide training to authorized employees on lockout/tagout. c) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on Drill Presses 1, 2, 3, and 4. The company does not provide training to authorized employees on lockout/tagout. d) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the centerless grinders. The company does not provide training to authorized employees on lockout/tagout. e) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the Cup Machine. The company does not provide training to authorized employees on lockout/tagout. |
|
Citation ID |
01008E |
Citaton Type |
Serious |
Standard Cited |
19100147 C07 I B |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
5 |
Nr Exposed |
9 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(7)(i)(B): Affected employee(s) was not instructed in the purpose and use of the energy control procedure: a) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on both the A Bank and B Bank tumblers. The company does not provide training to affected employees on lockout/tagout. b) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on Lathe 1 and Lathe 2. The company does not provide training to affected employees on lockout/tagout. c) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on Drill Presses 1, 2, 3, and 4. The company does not provide training to affected employees on lockout/tagout. d) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the centerless grinders. The company does not provide training to affected employees on lockout/tagout. e) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the Cup Machine. The company does not provide training to affected employees on lockout/tagout. |
|
Citation ID |
01008F |
Citaton Type |
Serious |
Standard Cited |
19100147 C07 I C |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
5 |
Nr Exposed |
4 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(7)(i)(C): Employees whose work operations were in an area where energy control procedures were utilized were not instructed about the procedure: a) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on both the A Bank and B Bank tumblers. The company does not provide training to employees whose work operations were in the area on lockout/tagout. b) Tumbler Room - On or prior to October 3, 2014, employees performed service and maintenance activities on Lathe 1 and Lathe 2. The company does not provide training to employees whose work operations were in the area on lockout/tagout. c) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on Drill Presses 1, 2, 3, and 4. The company does not provide training to employees whose work operations were in the area on lockout/tagout. d) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the centerless grinders. The company does not provide training to employees whose work operations were in the area on lockout/tagout. e) Drill Press Room - On or prior to October 3, 2014, employees performed service and maintenance on the Cup Machine. The company does not provide training to employees whose work operations were in the area on lockout/tagout. |
|
Citation ID |
01012 |
Citaton Type |
Serious |
Standard Cited |
19100157 G01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-20 |
Current Penalty |
0.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.157(g)(1): An educational program was not provided for all employees to familiarize them with the general principles of fire extinguisher use and the hazards involved with incipient stage fire fighting: a) Worksite - On or about October 3, 2014, employees were not trained in the general principles of fire extinguisher use and the hazards associated with fire fighting. |
|
Citation ID |
01013 |
Citaton Type |
Other |
Standard Cited |
19100178 L01 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-03-06 |
Current Penalty |
1000.0 |
Initial Penalty |
1200.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
9 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.178(l)(1)(i): Respondent's employees operate a forklift in the facility without training and evaluation of operating performance. |
|
Citation ID |
01014A |
Citaton Type |
Serious |
Standard Cited |
19100212 A01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
7000.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.212(a)(1): The A Bank and B Bank tumblers and the lathes in the tumbler room, and the cup machine in the drill press room were not equipped with compliant machine guards. |
|
Citation ID |
01014B |
Citaton Type |
Serious |
Standard Cited |
19100219 H01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.212(a)(1): The A Bank and B Bank tumblers and the lathes in the tumbler room, and the cup machine in the drill press room were not equipped with compliant machine guards. |
|
Citation ID |
01014C |
Citaton Type |
Serious |
Standard Cited |
19100219 B01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(b)(1): Flywheel(s) with parts seven feet or less above floor(s) or platform(s) were not guarded in accordance with the requirements specified in 29 CFR 1910.219(b)(1)(i) through (b)(1)(iv): a) Tumbler Room - On or about October 3, 2014, a flywheel approximately 2 feet in height from the floor on the A Bank tumblers was not guarded exposing employees to caught-in hazards. b) Tumbler Room - On or about October 3, 2014, a flywheel approximately 2 feet in height from the floor on the B Bank tumblers was not guarded exposing employees to caught-in hazards. |
|
Citation ID |
01014D |
Citaton Type |
Serious |
Standard Cited |
19100219 C04 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
2400.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: a) A Bank Tumblers - On or about October 3, 2014, a projecting shaft end that extends out approximately 4 inches was not adequately guarded exposing employees to caught-in hazards. b) B Bank Tumblers - On or about October 3, 2014, a projecting shaft end that extends out approximately 4 inches was not adequately guarded exposing employees to caught-in hazards. |
|
Citation ID |
01014E |
Citaton Type |
Serious |
Standard Cited |
19100219 C04 II |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(c)(4)(ii): The unused keyway(s) of projecting shaft end(s) were not filled up or covered: Note: Does not apply if guarded by nonrotating caps or sleeves. a) A Bank Tumblers - On or about October 3, 2014, there was an unused keyway of a projecting shaft end that extends out approximately 4 inches exposing employees to caught-in hazards. |
|
Citation ID |
01014F |
Citaton Type |
Serious |
Standard Cited |
19100219 D01 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a) Tumbler Room - On or about October 3, 2014, a pulley approximately 2 feet in height from the ground on the A Bank tumblers was not guarded exposing employees to in running nip points. b) Tumbler Room - On or about October 3, 2014, a pulley approximately 2 feet in height from the ground on the B Bank tumblers was not guarded exposing employees to in running nip points. c) Tumbler Room - On or about October 3, 2014, a pulley approximately 4 feet in height from the ground on Lathe 1 was not guarded exposing employees to in running nip points. d) Tumbler Room - On or about October 3, 2014, a pulley approximately 4 feet in height from the ground on Lathe 2 was not guarded exposing employees to in running nip points. |
|
Citation ID |
01014G |
Citaton Type |
Serious |
Standard Cited |
19100219 E03 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
4 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o): a) Tumbler Room - On or about October 3, 2014, a belt on the A Bank tumblers was not guarded exposing employees to caught-in hazards. b) Tumbler Room - On or about October 3, 2014, a belt on the B Bank tumblers was not guarded exposing employees to caught-in hazards. c) Tumbler Room - On or about October 3, 2014, a belt on Lathe 1 was not guarded exposing employees to caught-in hazards. d) Tumbler Room - On or about October 3, 2014, a belt on Lathe 2 was not guarded exposing employees to caught-in hazards. |
|
Citation ID |
01015 |
Citaton Type |
Serious |
Standard Cited |
19100212 A02 |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-05-18 |
Current Penalty |
0.0 |
Initial Penalty |
2000.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.212(a)(2): Guard(s) on machine(s) were not affixed to the machine or secured elsewhere when attachment to the machine was not possible: a) Drill Press Room - On or about October 3, 2014, the employer did not provide adequate machine guarding due to using a removable plastic guard that did not completely enclose the top of the drill press rotating parts for Drill Presses 1, 2, 3, and 4 exposing employees to caught-in hazards due to working around the drill presses. b) Drill Press Room - On or about October 3, 2014, the employer did not provide adequate machine guarding due to using removable plastic guards for the centerless grinders exposing employees to caught-in hazards due to working around the centerless grinders. |
|
Citation ID |
01019A |
Citaton Type |
Serious |
Standard Cited |
19100219 E02 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-27 |
Current Penalty |
0.0 |
Initial Penalty |
1600.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(e)(2)(i): Overhead horizontal belt(s) with lower parts seven (7) feet or less from the floor(s) or platform(s) were not guarded on the sides and bottom in accordance with the requirements specified in paragraph (o)(3) of this section: a) Drill Press Room - On or about October 27, 2014, horizontal belts on the cone pulleys on a cup machine approximately 5 feet in height from the ground were not guarded exposing employees to caught-in hazards. |
|
Citation ID |
01019B |
Citaton Type |
Serious |
Standard Cited |
19100219 E05 I |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2015-04-27 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(e)(5)(i): Cone belt(s) and pulley(s) were not equipped with belt shifter(s) so constructed as to adequately guard the nip point of the belt and pulley: a) Cup Machine - On or about October 27, 2014, cone belts and pulleys on a cup machine approximately 5 feet in height from the ground were not guarded exposing employees to caught-in hazards. |
|
Citation ID |
01020 |
Citaton Type |
Serious |
Standard Cited |
19100305 B01 II |
Issuance Date |
2015-04-01 |
Abatement Due Date |
2016-05-06 |
Current Penalty |
1000.0 |
Initial Penalty |
1200.0 |
Contest Date |
2015-04-23 |
Final Order |
2016-01-06 |
Nr Instances |
2 |
Nr Exposed |
2 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.305(b)(1)(ii) and 29 CFR 1910.305(g)(1)(iv)(A): A 4 x 4 junction box with switches used to operate the cup machine in the drill press room had a missing knockout plug; a light switch box on the basement landing had a missing switch; (c) in the first floor storage area, the Allen Bradley electrical control switch servicing the window mounted wall fan was wired with flexible cord that ran through the exterior wall; and (d) an extension cord plugged into a junction box was being used as permanent wiring to power a Shop-Vac. |
|
|