Name: | WEAVER METAL & ROOFING, INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 24 Feb 1989 (36 years ago) |
Entity Number: | 1329036 |
ZIP code: | 14202 |
County: | Erie |
Place of Formation: | New York |
Address: | 37 FRANKLIN STREET, SUITE 750, BUFFALO, NY, United States, 14202 |
Principal Address: | 40 APPENHEIMER AVENUE, BUFFALO, NY, United States, 14214 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Plan Name | Plan Year | EIN/PN | Received | Sponsor | Total number of participants | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
WEAVER METAL & ROOFING INC 401(K) PLAN | 2023 | 161343726 | 2024-02-12 | WEAVER METAL & ROOFING, INC. | 7 | |||||||||||||||||||||
|
Role | Plan administrator |
Date | 2024-02-07 |
Name of individual signing | PATRICK BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2023-09-12 |
Name of individual signing | PATRICK BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2022-02-22 |
Name of individual signing | PATRICK BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2021-03-12 |
Name of individual signing | PATRICK BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2020-06-10 |
Name of individual signing | PATRICK BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2019-02-04 |
Name of individual signing | PATRICK BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2018-02-26 |
Name of individual signing | PATRICK BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2017-09-27 |
Name of individual signing | PATRICK BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2016-03-18 |
Name of individual signing | ANTHONY BYRNE |
File | View Page |
Three-digit plan number (PN) | 001 |
Effective date of plan | 2010-01-01 |
Business code | 238100 |
Sponsor’s telephone number | 7168918844 |
Plan sponsor’s address | 40 APPENHEIMER AVE, BUFFALO, NY, 14214 |
Signature of
Role | Plan administrator |
Date | 2015-10-07 |
Name of individual signing | ANTHONY BYRNE |
Name | Role | Address |
---|---|---|
PATRICK R. BYRNE | Chief Executive Officer | 40 APPENHEIMER AVENUE, BUFFALO, NY, United States, 14214 |
Name | Role | Address |
---|---|---|
LAW OFFICES OF RICHARD A. CLACK | DOS Process Agent | 37 FRANKLIN STREET, SUITE 750, BUFFALO, NY, United States, 14202 |
Start date | End date | Type | Value |
---|---|---|---|
2025-02-06 | 2025-02-06 | Address | 40 APPENHEIMER AVENUE, BUFFALO, NY, 14214, 2902, USA (Type of address: Chief Executive Officer) |
2025-02-06 | 2025-02-06 | Address | 40 APPENHEIMER AVENUE, BUFFALO, NY, 14214, USA (Type of address: Chief Executive Officer) |
2024-04-23 | 2024-04-23 | Address | 40 APPENHEIMER AVENUE, BUFFALO, NY, 14214, USA (Type of address: Chief Executive Officer) |
2024-04-23 | 2024-04-23 | Address | 40 APPENHEIMER AVENUE, BUFFALO, NY, 14214, 2902, USA (Type of address: Chief Executive Officer) |
2024-04-23 | 2025-02-06 | Address | 37 FRANKLIN STREET, SUITE 750, BUFFALO, NY, 14202, USA (Type of address: Service of Process) |
2024-04-23 | 2025-02-06 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-04-23 | 2025-02-06 | Address | 40 APPENHEIMER AVENUE, BUFFALO, NY, 14214, USA (Type of address: Chief Executive Officer) |
2024-04-23 | 2025-02-06 | Address | 40 APPENHEIMER AVENUE, BUFFALO, NY, 14214, 2902, USA (Type of address: Chief Executive Officer) |
2011-03-21 | 2024-04-23 | Address | 1300 MAIN PLACE TOWER, 350 MAIN STREET, BUFFALO, NY, 14202, 3713, USA (Type of address: Service of Process) |
2005-03-02 | 2024-04-23 | Address | 40 APPENHEIMER AVENUE, BUFFALO, NY, 14214, 2902, USA (Type of address: Chief Executive Officer) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
250206004209 | 2025-02-06 | BIENNIAL STATEMENT | 2025-02-06 |
240423003571 | 2024-04-23 | BIENNIAL STATEMENT | 2024-04-23 |
110321002561 | 2011-03-21 | BIENNIAL STATEMENT | 2011-02-01 |
090220002229 | 2009-02-20 | BIENNIAL STATEMENT | 2009-02-01 |
070213003016 | 2007-02-13 | BIENNIAL STATEMENT | 2007-02-01 |
050302003041 | 2005-03-02 | BIENNIAL STATEMENT | 2005-02-01 |
030204002405 | 2003-02-04 | BIENNIAL STATEMENT | 2003-02-01 |
010221002068 | 2001-02-21 | BIENNIAL STATEMENT | 2001-02-01 |
990224002493 | 1999-02-24 | BIENNIAL STATEMENT | 1999-02-01 |
970417002366 | 1997-04-17 | BIENNIAL STATEMENT | 1997-02-01 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345884373 | 0213600 | 2022-04-06 | 22 FLICKINGER COURT, AMHERST, NY, 14228 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260501 B11 |
Issuance Date | 2022-06-02 |
Current Penalty | 1900.0 |
Initial Penalty | 3143.0 |
Final Order | 2022-06-21 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(11):Each employee on a steep roof with unprotected sides and edges 6 feet or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems, or personal fall arrest systems: a) On or about 4/6/2022, at the roof area of the site, Amherst, NY. Employees, engaged in roofing work of a steep roof with slopes of 5 in 12 and 7 in 12, including tear-off and new shingles, were not protected by fall protections. NO ABATEMENT CERTIFICATION REQUIRED |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2018-08-06 |
Emphasis | L: FALL, P: FALL |
Case Closed | 2019-04-23 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260502 H01 V |
Issuance Date | 2018-08-16 |
Current Penalty | 2000.0 |
Initial Penalty | 5497.0 |
Contest Date | 2018-09-11 |
Final Order | 2018-12-17 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(h)(1)(v): Safety monitor performed duties which took him away from monitoring duties. |
Inspection Type | Prog Related |
Scope | Complete |
Safety/Health | Safety |
Emphasis | N: CTARGET, P: CTARGET |
Case Closed | 2018-03-23 |
Related Activity
Type | Inspection |
Activity Nr | 1246828 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1246858 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260502 C03 |
Issuance Date | 2017-09-25 |
Current Penalty | 1901.0 |
Initial Penalty | 3802.0 |
Contest Date | 2017-10-02 |
Final Order | 2018-03-02 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(c(3): The employer did not ensure affected employee's knowledge or use of fall protection systems or equipment indicated that the employee's retained the requisite understanding or skill: a) On or about 7/13/17 on roof E of the Lackawanna Middle School Building, 500 Martin Rd., Lackawanna, NY: Two employees engaged in roofing work on a flat roof were applying sealant at the roof edge around the perimeter of the roof and were protected from falling approx. 12 ft. off the west and south sides of the roof by a proper wood guardrail system consisting of horizontal wood 2 x 4 toprails, and horizontal wood 2 x 4 midrails, installed at the proper height. The toprails and midrails were nailed into vertical wood 2 x 4 posts, spaced 5 ft. on center. The employees had just completed the sealing work on the west and south sides of the roof and were working on the east side, moving north. Shortly ahead of them was a section of guardrail that had a span of approx. 14 foot where no vertical post was installed. This horizontal span of the toprails and midrails was greater than the 8 foot span between vertical posts recommended for wooden guardrails in Appendix B of Subpart M of this standard. This section was located above two dumpsters setting on the ground. There was a short steep wood ramp just beyond this section of guardrail. Employees were exposed to a potential fall of approx. 9 ft. to the bottom of the dumpster. NO ABATEMENT CERTIFICATION REQUIRED |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260502 B05 |
Issuance Date | 2017-09-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2017-10-02 |
Final Order | 2018-03-02 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.502(b)(5): Midrails, screens, mesh, intermediate vertical members, solid panels, and equivalent structural members were not capable of withstanding, without failure, a force of at least 150 pounds (666 N) applied in any downward or outward di a) On or about 7/13/17 on roof E of the Lackawanna Middle School Building, 500 Martin Rd., Lackawanna, NY: Two employees engaged in roofing work on a flat roof were applying sealant at the roof edge around the perimeter of the roof and were protected from falling approx. 12 ft. off the west and south sides of the roof by a proper wood guardrail system consisting of horizontal wood 2 x 4 toprails, and horizontal wood 2 x 4 midrails, installed at the proper height. The toprails and midrails were nailed into vertical wood 2 x 4 posts, spaced 5 ft. on center. The employees had just completed the sealing work on the west and south sides of the roof and were working on the east side, moving north. Shortly ahead of them was a section of guardrail that had a span of approx. 14 foot where no vertical post was installed. This horizontal span of the toprails and midrails was greater than the 8 foot span between vertical posts recommended for wooden guardrails in Appendix B of Subpart M of this standard. This section was located above two dumpsters setting on the ground. There was a short steep wood ramp just beyond this section of guardrail. Employees were exposed to a potential fall of approx. 9 ft. to the bottom of the dumpster. NO ABATEMENT CERTIFICATION REQUIRED |
Inspection Type | Planned |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2013-03-26 |
Emphasis | L: FALL, P: FALL |
Case Closed | 2013-09-26 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260501 B10 |
Issuance Date | 2013-04-16 |
Current Penalty | 750.0 |
Initial Penalty | 2100.0 |
Contest Date | 2013-05-07 |
Final Order | 2013-07-31 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Or, on roofs 50-feet (15.25 m) or less in width, each employee was not protected by use of a monitoring system. a) On or about 3/26/13, at the loading dock area of the site, Amherst, NY. Employee, performing roofing repair work, was not protected by the above-mentioned fall protection systems. No Abatement Certification Required |
Date of last update: 27 Feb 2025
Sources: New York Secretary of State